Commercial electrical interview questions
126 interview questions for the 21 roles a $20M business in this industry hires for, from leadership to the field. Each role has job-related questions, what strong and weak answers sound like, and a short work exercise.
21 roles. Open one to see its questions, or open them all.
Chief Executive Officer
6 questions · Set next year's targets
Estimating wants to submit a very low number on a large hospital project to break into healthcare work. What do you decide?
Situational · Bid approval
- Strong answer
- Weighs the strategic value against the risk of losing money, checks whether the team has the experience and capacity, and only approves a number that doesn't bet the company.
- Red flags
- Approves it to win the logo.
A key general contractor still owes you retainage on three finished jobs and wants you on their next project. What do you do?
Situational · Managing a key contractor
- Strong answer
- Raises the retainage directly with their leadership, ties future work to fair payment, and decides whether to bid with that risk in mind.
- Red flags
- Bids the next job without mentioning it.
An electrician suffers an arc flash burn on one of your jobs. What do you do?
Situational · Serious injury response
- Strong answer
- Makes sure the worker gets care and support, reports as OSHA requires, stops similar work, finds the root cause (energized work decision, PPE, procedure), and fixes the program company-wide.
- Red flags
- Focuses on whether the electrician broke a rule.
Walk me through how you'd decide how much work the company can take on next year.
Technical · Capacity planning
- Strong answer
- Compares backlog by month to field capacity (foremen and journeymen), project manager load, bonding and cash, sets a sales target and a hiring plan to match.
- Red flags
- Sets a revenue goal and tells sales to hit it.
Tell me about a time you replaced a project manager or division leader whose jobs kept losing margin between bid and closeout.
Behavioral · Replacing a senior leader
- Strong answer
- Shows the WIP and profit fade data they used, the coaching and warning given, how they protected jobs in progress and contractor relationships during the change, and who took over.
- Red flags
- Let the fade continue out of loyalty, or removed them suddenly with no plan for their jobs.
Tell me about a time you kept a general contractor's trust through a hard problem, such as a crew falling behind or a big change order dispute.
Behavioral · Keeping contractor trust
- Strong answer
- Told the contractor early, offered real options, settled the dispute with documentation rather than threats, and explains the repeat or negotiated work that followed.
- Red flags
- Hid the problem until it hit the schedule, or credits low bids alone for the relationship.
Work exercise: Set next year's targets
Give finalists a made-up snapshot: backlog by month, field headcount by role, project manager workloads, bonding capacity and margin by project type. Ask them to set next year's sales target and hiring plan and explain the risks in [25] minutes.
Chief Operating Officer
6 questions · Plan a safety turnaround
You find that the company's energized-work and arc flash program exists on paper, but crews don't follow it. What do you do?
Situational · Electrical safety program
- Strong answer
- Visits jobs to see why, fixes what's unworkable, trains foremen first, provides PPE and meters, and enforces it consistently, starting with leadership.
- Red flags
- Re-sends the program and asks everyone to sign it.
Above-ceiling inspections are failing on several jobs for similar reasons. What do you do?
Situational · Repeat inspection failures
- Strong answer
- Collects the notices, finds the common causes, updates the pre-inspection checklist, trains foremen and has a supervisor check before every call.
- Red flags
- Lets each foreman handle it.
Three big jobs peak at the same time and you're short of journeymen. What do you do?
Situational · Field labor shortage
- Strong answer
- Looks at which schedules can shift, borrows through partners or the hall where available, adds supervision for apprentices, and tells contractors honestly what can be done.
- Red flags
- Spreads crews thin and hopes.
Walk me through a standard project startup process, from signed contract to the first day in the field.
Technical · Project startup process
- Strong answer
- Turnover meeting from estimating, buyout and budget, schedule of values, submittals, long-lead gear, crew and foreman assignment, site safety plan and kickoff with the general contractor.
- Red flags
- Sends the foreman with the drawings.
Tell me about a project manager or foreman you had to hold accountable for repeated problems, such as labor overruns or skipped energized-work permits.
Behavioral · Holding leaders accountable
- Strong answer
- Made expectations specific (labor tracking, change orders, safety), coached with a plan and dates, followed up, and acted when it didn't change.
- Red flags
- Avoided it, or moved the person to another job without addressing it.
Tell me about a process you changed across multiple jobs, like how time-and-material tickets or above-ceiling checks were handled.
Behavioral · Improving processes
- Strong answer
- Names the process, why it was failing, how they got project managers and foremen to adopt it, and the measured result.
- Red flags
- Announced a new rule and never checked whether jobs followed it.
Work exercise: Plan a safety turnaround
Give finalists a made-up set of [five] field safety observations, [two] near-miss reports and a job-by-job list of energized-work permits used. Ask them to identify the biggest risk and present a [60]-day plan in [25] minutes.
Chief Financial Officer
6 questions · Explain the WIP
Walk me through what an underbilling on a job tells you, and what you do about it.
Technical · Reading over and under billings
- Strong answer
- Explains that earned revenue exceeds billings, which can mean unbilled work, unapproved change orders or cost overruns, then investigates with the project manager and pushes billing or adjusts the estimate.
- Red flags
- Sees it as extra profit to come.
A switchgear manufacturer wants a large deposit months before delivery. What do you do?
Situational · Long-lead gear deposits
- Strong answer
- Checks whether the contract allows billing for deposits or stored material, negotiates with the general contractor, plans the cash, and uses the credit line if needed.
- Red flags
- Pays it and absorbs the cash hit without checking the contract.
Your surety says your bonding line won't grow unless your financial statements improve. What do you do?
Situational · Growing the bonding line
- Strong answer
- Learns what the surety weighs (working capital, equity, accurate WIP, reviewed statements), sets a plan with leadership, and keeps the surety updated.
- Red flags
- Shops for another surety without fixing anything.
Your largest general contractor customer starts paying slowly, and you hear other subcontractors have walked off their jobs. What do you do?
Situational · Customer credit risk
- Strong answer
- Totals the exposure (receivables, retainage, backlog with them), reviews lien and bond rights and notice deadlines under your state's law, tightens billing and terms, and advises leadership on limiting new work.
- Red flags
- Keeps working and billing as usual, or misses lien notice deadlines while waiting to be paid.
Tell me about a time you changed how project managers handled money on their jobs, such as turning time-and-material tickets into change orders faster.
Behavioral · Influencing operations
- Strong answer
- Explains what was wrong, how they got buy-in, the tools or reports they built, and the result.
- Red flags
- Sent a policy memo and stopped there.
Tell me about a surety, bank or audit review of your WIP schedule that went smoothly because of something you did.
Behavioral · Audit readiness
- Strong answer
- Describes clean WIP schedules, documented cost-to-complete estimates and reconciliations prepared ahead, and how it helped the audit, the surety or the bank.
- Red flags
- Describes scrambling at the last minute.
Work exercise: Explain the WIP
Give finalists a made-up work-in-progress schedule for [five] commercial electrical jobs, one heavily underbilled and one with profit fade. Ask them to explain each, list questions for the project managers, and say what they'd tell the surety, in [30] minutes.
General Manager
6 questions · Review a project portfolio
Walk me through a monthly review with a project manager whose job shows labor hours running ahead of percent complete.
Technical · Project profit review
- Strong answer
- Compares hours used with work in place, checks cost to complete, change orders, unbilled tickets and schedule, asks what's driving the gap, and agrees on actions and a follow-up date.
- Red flags
- Accepts the project manager's word that it will catch up.
A large job is behind schedule and over on labor. The general contractor is threatening back-charges. What do you do?
Situational · Saving a slipping job
- Strong answer
- Gets the facts with the project manager and foreman, separates your delays from others', fixes crew and material problems, documents the record, and meets the contractor with a recovery plan.
- Red flags
- Throws more people at it without a plan.
You can staff only one of two jobs starting next month. How do you decide?
Situational · Choosing between projects
- Strong answer
- Weighs margin, customer relationship, contract risk, crew fit and cash flow, and tells the other customer early and honestly.
- Red flags
- Picks the bigger one.
Your safety numbers look good, but you hear crews hide minor injuries. What do you do?
Situational · Safety leadership
- Strong answer
- Makes reporting safe and expected, removes incentives that discourage reporting, talks with crews directly, and uses the real data to fix hazards.
- Red flags
- Is happy with the good numbers.
Tell me about a project manager you coached to run more profitable jobs, such as one whose crews kept losing hours to poor material planning.
Behavioral · Developing project managers
- Strong answer
- Names the gaps (change orders, labor tracking, contractor communication), how they coached, and how that person's jobs improved.
- Red flags
- Has never coached one, or just took over their jobs.
Tell me about a time you removed a foreman from running crews because of safety lapses or how they treated people.
Behavioral · Tough personnel decisions
- Strong answer
- Explains the reasons, the warnings and coaching given, how they handled it fairly and with documentation, and how crews and customers were affected.
- Red flags
- Avoided it, or did it without warning or documentation.
Work exercise: Review a project portfolio
Give finalists a made-up summary of [six] active jobs with labor budgets, hours used, change order status and schedule. Allow [10] minutes to prepare, then have them run a [15]-minute review with a manager playing one of the project managers.
Field Supervisor
6 questions · Walk a made-up ceiling
Walk me through your above-ceiling walk before you tell the general contractor the ceiling can be closed.
Technical · Above-ceiling inspection readiness
- Strong answer
- Raceway and cable support, box covers, conductor identification, fire-rated penetrations sealed, grounding and bonding, labeling, and that work matches the drawings and any RFI answers.
- Red flags
- Assumes the crew got it right.
The shutdown got cancelled, and a foreman wants to land feeders in a live switchboard to stay on schedule. What do you do?
Situational · Refusing unjustified energized work
- Strong answer
- Stops it, explains that schedule isn't a reason for energized work under the company's NFPA 70E program, and works with the project manager to reschedule the shutdown.
- Red flags
- Allows it if the foreman is careful.
Ductwork is going up where your conduit runs are drawn. What do you do?
Situational · Ceiling space conflicts
- Strong answer
- Stops the conflicting work, meets the mechanical foreman and general contractor, checks the coordination drawings, sends an RFI if needed, and documents any cost.
- Red flags
- Reroutes on the fly without telling anyone.
Tomorrow your crew pulls a long feeder with several bends. The last similar pull ran far over its hours and scuffed the insulation. What do you do?
Situational · Planning a feeder pull
- Strong answer
- Reviews the route and bends, checks pulling tension and sidewall pressure limits or has them calculated, plans the setup (puller, sheaves, lubricant, reel stands, radios), assigns roles, and walks the crew through it.
- Red flags
- Tells the crew to pull harder or faster without planning the setup or checking the run.
Tell me about a journeyman you helped become a foreman who could run manpower, material and paperwork on a commercial electrical job.
Behavioral · Developing foremen
- Strong answer
- Names what the journeyman needed (planning, leading others, contractor communication), how they coached, and how the person did as a foreman.
- Red flags
- Has never developed anyone, or just handed someone a crew.
Tell me about a time a general contractor was unhappy with your crew, such as over a missed above-ceiling deadline or damage to finished work.
Behavioral · Customer relations on site
- Strong answer
- Met them on site, listened, checked the facts against the drawings and schedule, fixed what was the crew's fault, and followed up.
- Red flags
- Defended the crew without checking.
Work exercise: Walk a made-up ceiling
Give finalists [six] photos or descriptions of made-up above-ceiling work with [four] planted problems, such as unsupported cable, a missing box cover and an unsealed rated penetration. Ask them to find each one and write the crew's plan for tomorrow, in [20] minutes.
HR Manager
6 questions · Audit training records
A foreman wants to pay an apprentice less than the labor agreement requires because they're new. What do you do?
Situational · Labor agreement compliance
- Strong answer
- Checks the agreement and apprenticeship rules, explains them to the foreman, and makes sure the apprentice is paid correctly.
- Red flags
- Lets the foreman decide.
Walk me through how you'd keep track of OSHA, NFPA 70E, lift and fire alarm training across the field.
Technical · Safety training records
- Strong answer
- Keeps a central record by person with dates and copies, sends reminders before expiration, shares it with operations, and keeps unqualified people off that work.
- Red flags
- Keeps sign-in sheets in a binder.
After an electrical incident, a manager wants to fire the electrician involved right away. What do you do?
Situational · Post-incident process
- Strong answer
- Pauses the decision until the investigation is done, puts facts and root causes first, checks policy and past cases for consistency, makes sure it isn't punishment for reporting, and documents everything.
- Red flags
- Processes the termination immediately.
You need two experienced foremen for upcoming projects. What's your plan?
Situational · Recruiting foremen
- Strong answer
- Looks inside first for ready journeymen, uses referrals and industry contacts, posts real pay and expectations, and tests leadership skills in interviews.
- Red flags
- Posts an ad and waits.
Tell me about a grievance or complaint from field employees you handled, such as a dispute over overtime, travel time or crew assignments.
Behavioral · Handling grievances
- Strong answer
- Knew the contract or policy terms, gathered facts from both sides, met with the people involved (with the steward where there's a union), reached a resolution that held, and protected people from retaliation.
- Red flags
- Let it drag on, or sided with the foreman without checking the facts.
Tell me about a program you built to keep or develop field employees, like apprenticeship support or foreman training.
Behavioral · Building programs
- Strong answer
- Names the problem, the program, how they launched it with operations, and a result like retention or promotions.
- Red flags
- Has only run programs others designed, or can't say what changed.
Work exercise: Audit training records
Give finalists a made-up training roster for [ten] field employees and next week's job assignments, with [three] planted problems such as expired electrical safety training on someone assigned to switchgear work. Ask them to find the problems and write the fix in [20] minutes.
Marketing Manager
6 questions · Outline a qualifications package
Walk me through how you'd market the company's electrical maintenance and service work, such as infrared scans, to facility managers.
Technical · Growing service contracts
- Strong answer
- Targets facility and property managers, explains value in their terms (fewer surprise outages, documented maintenance for insurers), uses real examples, matches offers to service team capacity, and tracks contracts signed.
- Red flags
- Uses the same pitch as construction bids, or sells more contracts than the service team can staff.
The company wants to grow in healthcare and education projects. How would you support that?
Situational · Entering a new market
- Strong answer
- Learns how those customers buy (bids, prequalification, approved vendor lists), builds relevant case studies, picks the right associations and events, and supports sales.
- Red flags
- Runs general ads.
A project manager wants to publish photos from a job, but the customer's contract has a confidentiality clause. What do you do?
Situational · Accurate case studies
- Strong answer
- Checks the contract and the customer's rules, gets written permission or holds off, and protects the relationship over the marketing piece.
- Red flags
- Publishes anyway.
Field hiring is now as hard as winning work. How would marketing help recruiting?
Situational · Recruiting support
- Strong answer
- Works with HR on clear job pages, shows real crews and projects, targets trade schools and apprenticeship programs, and tracks applicants by source.
- Red flags
- Says recruiting isn't marketing's job.
Tell me about a time you tracked a general contractor relationship or campaign from first contact to a signed electrical contract.
Behavioral · Measuring results
- Strong answer
- Explains how they tracked opportunities from first contact through bids to signed contracts, what the numbers showed, and what they changed because of it.
- Red flags
- Only reports activity.
Tell me about a proposal piece or tool you built that helped estimators win commercial electrical bids.
Behavioral · Working with estimating
- Strong answer
- Learned what they needed, built it, and shows how it was used and helped.
- Red flags
- Built materials nobody used.
Work exercise: Outline a qualifications package
Give finalists a made-up company profile with project history, safety data and [three] target general contractors. Ask them to outline a qualifications package and a [90]-day outreach plan in [25] minutes.
Office Manager
6 questions · Prioritize collections
Walk me through how you check a commercial invoice before it goes out.
Technical · Billing accuracy
- Strong answer
- Matches it to the contract or purchase order, rates, signed tickets, retainage terms, required lien waivers and the customer's billing format.
- Red flags
- Sends whatever the system produces.
A general contractor won't release this month's payment until they get conditional lien waivers from you and your main supplier. What do you do?
Situational · Lien waivers
- Strong answer
- Confirms exactly which waivers and forms they need (your state's required form where there is one), sends conditional waivers for the amount billed, never unconditional before payment, gets the supplier's waiver, and tracks it to payment.
- Red flags
- Signs an unconditional waiver before the money arrives, or waits for the contractor to follow up.
Several commercial customers are past due. What's your plan?
Situational · Collections
- Strong answer
- Sorts by amount and age, confirms invoices were received and correct, contacts the right payables person, sets follow-up dates, and escalates through the project manager or owner when needed.
- Red flags
- Sends statements and waits.
A project manager can't find the signed change order the customer now disputes. What do you do?
Situational · Document control
- Strong answer
- Searches email and project files, contacts the customer for their copy, and sets up a system where signed documents are filed by job right away.
- Red flags
- Tells the project manager it's their problem.
Tell me about a time you shortened how long a general contractor took to pay, such as by fixing pay-portal rejections or bills sent to the wrong payables contact.
Behavioral · Process improvement
- Strong answer
- Names the cause (missing lien waivers, portal rules, wrong payables contact), the fix, and how days to pay changed.
- Red flags
- Sent statements and waited.
Tell me about a time someone on your office team kept making billing errors, such as missing lien waivers or wrong retainage.
Behavioral · Leading office staff
- Strong answer
- Reviewed the errors to find the pattern, coached privately with examples, set expectations and a check-in date, and followed through.
- Red flags
- Fixed the errors themselves or avoided the conversation.
Work exercise: Prioritize collections
Give finalists a made-up receivables aging for [12] commercial customers with notes on disputes, missing lien waivers and portal rejections. Ask them to plan the week's collection calls and fixes in [20] minutes.
Operations Manager
6 questions · Plan the manpower
Two jobs both need your only foreman with switchgear experience next week. What do you do?
Situational · Allocating electricians
- Strong answer
- Looks at which job's work can move, talks with both project managers, considers backup support, and decides based on risk and contract dates.
- Red flags
- Splits the foreman across both jobs without a plan.
Walk me through how you plan next week's manpower across several jobs while keeping every apprentice paired with a licensed electrician as your state requires.
Technical · Planning the week
- Strong answer
- Starts from each job's schedule and inspections, pairs apprentices within your state's supervision rules, matches special skills like switchgear or fire alarm, confirms material and lifts, leaves room for emergencies, and reviews with project managers.
- Red flags
- Keeps everyone where they were last week.
Crews keep showing up to jobs without the information they need. What do you change?
Situational · Morning briefings
- Strong answer
- Sets a short daily briefing or written plan for each crew with tasks, safety notes, material and contacts, and checks it's working.
- Red flags
- Tells foremen to call the office.
The general contractor is two weeks behind, and your crew on that job will run out of work by Wednesday. What do you do?
Situational · Handling delays
- Strong answer
- Moves them to productive work on another job or prefab, keeps a small core crew for the restart, documents the contractor's delay for a possible claim, and updates the project manager.
- Red flags
- Lets the crew sit, or pulls everyone off and loses momentum when the job restarts.
Tell me about a change you made that cut idle time for electricians on commercial jobs.
Behavioral · Improving efficiency
- Strong answer
- Names the cause (material, lifts, access, other trades), the change (staging, lift scheduling, daily plans), and how much idle time dropped.
- Red flags
- Blames other trades and changed nothing in their own planning.
Tell me about a time a general contractor demanded more electricians on site than you could supply.
Behavioral · Customer communication
- Strong answer
- Checked what work was actually ready, told them early with a real number, offered a plan such as overtime, prefab or more people later, documented it, and kept to it.
- Red flags
- Promised the manpower and didn't send it, or stopped answering the superintendent.
Work exercise: Plan the manpower
Give finalists a made-up two-week schedule for [five] jobs and [20] field employees with skills and licenses, plus [one] gear delay and [one] crew lead out. Ask them to plan manpower and explain the tradeoffs in [25] minutes.
Production Manager
6 questions · Phase a building install
Walk me through how you'd plan the electrical install on a new commercial building.
Technical · Planning installs
- Strong answer
- Breaks it into phases (underground, rough-in, above-ceiling, gear, trim, testing), ties each to the general contractor's schedule, plans crew sizes, material deliveries and inspections, and tracks hours by phase.
- Red flags
- Starts and adjusts as it goes.
An inspector writes up the same code issue on several of your jobs. What do you do?
Situational · Code compliance
- Strong answer
- Confirms the requirement, trains all foremen, adds it to the checklist, and checks the next jobs personally.
- Red flags
- Fixes each one separately.
An inspector writes a correction citing a rule you believe isn't in the NEC edition your area enforces. What do you do?
Situational · Working with inspectors
- Strong answer
- Stays professional, asks for the code section and edition, checks the adopted edition and any local amendments, discusses it with the inspector or their supervisor, follows the ruling or appeals properly, and documents any cost.
- Red flags
- Argues on site, or tears work out without checking which code applies.
You see a crew working near energized gear without the arc flash boundary marked. What do you do?
Situational · Safety enforcement
- Strong answer
- Stops the work, has the boundary set up and PPE checked, coaches the crew and foreman, and follows up.
- Red flags
- Mentions it later.
Tell me about a time you turned around an electrical crew that kept running over on hours or failing inspections.
Behavioral · Leading crews
- Strong answer
- Found the causes (crew mix, foreman skills, material flow, rework), made specific changes, and shows the result in hours or quality.
- Red flags
- Just pushed harder.
Tell me about a quality problem on an electrical install that reached the customer, such as a failed startup or a mislabeled panel.
Behavioral · Quality management
- Strong answer
- Explains the problem, how they made it right, and the step added to prevent it.
- Red flags
- Blames someone else.
Work exercise: Phase a building install
Give finalists a made-up general contractor schedule for a [two]-story building and an electrical scope summary. Ask them to lay out phases, crew sizes and inspections and name [two] risks, in [30] minutes.
Project Manager
6 questions · Sort a submittal and a delay
Walk me through buying out a commercial electrical job, from contract to released orders.
Technical · Buyout and submittals
- Strong answer
- Confirms scope, builds the budget and schedule of values, prepares submittals for gear, fixtures and controls, releases long-lead orders after approval, and tracks ship dates.
- Red flags
- Orders material as the crew needs it.
Your foreman has a stack of unsigned time-and-material tickets from the last month. What do you do?
Situational · Turning tickets into change orders
- Strong answer
- Gets them signed quickly, prices them, submits change orders with backup, tracks approvals, and sets a rule that tickets get signed the same day.
- Red flags
- Lets them sit until the end of the job.
The distributor says switchgear will ship six weeks late. What do you do?
Situational · Long-lead gear
- Strong answer
- Gets the new date in writing, tells the general contractor right away, looks at options (temporary power, resequencing), adjusts the schedule and documents the delay.
- Red flags
- Waits and hopes it ships sooner.
The commissioning agent wants to test the fire alarm interface and lighting controls next week, but some programming isn't finished. What do you do?
Situational · Startup and testing
- Strong answer
- Gets a status from the controls and fire alarm partners, sets a realistic test date, tells the agent and general contractor, and tracks open items to closure.
- Red flags
- Lets the test go ahead and fail.
Tell me about a commercial electrical job where you caught labor running over budget.
Behavioral · Labor budget
- Strong answer
- Caught it early with weekly reviews, found causes, pursued change orders for others' delays, adjusted the crew plan, and explains the result.
- Red flags
- Found out at the end.
Tell me about a closeout you ran that got retainage released fast, such as gathering test reports, as-builts and panel schedules early.
Behavioral · Closeout
- Strong answer
- Collected as-builts, test reports, O&M manuals and warranties as work finished, pushed the punch list, and followed up.
- Red flags
- Started closeout after the last day on site.
Work exercise: Sort a submittal and a delay
Give finalists a made-up gear submittal with [three] mismatches against the drawings, a distributor email about a late ship date, and [four] unsigned time-and-material tickets. Ask them to mark up the submittal, draft the email to the general contractor and plan the tickets in [30] minutes.
Sales Manager
6 questions · Pick the bids
Your team bids everything and wins few. What do you change?
Situational · Bid selection
- Strong answer
- Sets clear go or no-go criteria (customer, size, type, margin, capacity), reviews bids against them, and focuses on work the company wins and profits from.
- Red flags
- Tells the team to bid more.
A key general contractor asks you to cut your number to match a competitor. What do you do?
Situational · Pricing pressure
- Strong answer
- Checks scope differences, looks for value engineering options, and holds a price that makes money or walks away.
- Red flags
- Matches the number.
Walk me through how you'd manage the sales pipeline for commercial electrical work.
Technical · Pipeline management
- Strong answer
- Tracks opportunities by stage, value, probability and bid date, reviews next steps weekly, and forecasts using past win rates.
- Red flags
- Keeps it in their head.
A repeat customer hasn't invited you to bid in months. What do you do?
Situational · Customer retention
- Strong answer
- Reaches out to learn why, checks with operations for any service issues, fixes problems and rebuilds the relationship.
- Red flags
- Waits for an invite.
Tell me about an estimator you coached to stop missing scope on electrical bids, such as fire alarm, temporary power or utility fees.
Behavioral · Coaching
- Strong answer
- Names the gaps (scope review, takeoff checks, bid-day process), the coaching, and the change in missed-scope losses or margin.
- Red flags
- Told them to be more careful, or fixed their bids themselves.
Tell me about a time you walked away from bidding a project because the risk was too high, such as a contractor known for slow pay or unclear gear responsibility.
Behavioral · Walking away from bad work
- Strong answer
- Explains the warning signs (payment history, contract terms, thin margin), how they decided with leadership, and what happened afterward.
- Red flags
- Has never walked away from work, or regrets every no.
Work exercise: Pick the bids
Give finalists a made-up list of [12] bid invitations with customer, size, type and dates, plus current backlog. Ask them to pick which to bid and explain why, in [20] minutes.
Warehouse Manager
6 questions · Plan tomorrow's deliveries
A foreman sends you a cut list for tomorrow's feeder pull: several conductors cut to set lengths from different reels. How do you get it right?
Situational · Staging job material
- Strong answer
- Confirms sizes, lengths and phase colors against the cut list, checks that lengths include makeup, measures with a counter, tags each cut by job and circuit, records footage used, and confirms delivery time and site access.
- Red flags
- Cuts by eye, or sends whole reels without checking lengths, so the pull comes up short.
Walk me through how you'd manage the company's meters, testers and torque tools so crews always have working, calibrated ones.
Technical · Test equipment and tool control
- Strong answer
- Keeps each tool listed with serial number and calibration due date, checks out by person and job, pulls tools that are due or have damaged leads, tracks repairs, and keeps spares of the most-used.
- Red flags
- Hands out whatever is on the shelf without tracking calibration or condition.
A dry-type transformer for a job comes off the truck with its tip indicator tripped but no visible damage. What do you do?
Situational · Receiving gear
- Strong answer
- Notes the tripped indicator and any damage on the delivery receipt before signing, photographs it, holds the unit for inspection per the manufacturer's receiving instructions, and tells the project manager before it goes to site.
- Red flags
- Signs it clean and sends it to the job.
A finished job sends back a truckload of unused fixtures, wire and fittings with no paperwork. What do you do?
Situational · Handling job returns
- Strong answer
- Sorts and counts it, matches it to the job's orders, returns what the distributor will take back before the deadline, restocks the rest under the right part numbers, credits the job, and fixes the return paperwork step.
- Red flags
- Piles it in a corner to sort later, so return windows and job credits are missed.
Tell me about a time you held warehouse staff to a standard they didn't like, such as tagging every wire cut by job.
Behavioral · Leading the team
- Strong answer
- Explained why the standard mattered, trained the team, checked follow-through, and addressed repeat issues with the person directly.
- Red flags
- Let it slide.
Tell me about a time you changed how heavy wire reels were stored, moved or loaded to prevent injuries.
Behavioral · Safety
- Strong answer
- Names the hazard (reels rolling, overloaded racks, hand lifting), the fix (chocks, reel racks, forklift reel attachments, loading rules), how they trained the team and how they made sure it stuck.
- Red flags
- Can't describe a reel or loading hazard they fixed, or changed nothing until someone was hurt.
Work exercise: Plan tomorrow's deliveries
Give finalists made-up material orders for [four] job sites, a stock list with [three] shortages and [one] truck. Ask them to plan pulls, the delivery route and what to tell project managers, in [20] minutes.
Customer Service Representative
6 questions · Take three commercial calls
A restaurant manager calls: part of the kitchen lost power during dinner prep. What do you do?
Situational · Urgent business outages
- Strong answer
- Asks which equipment lost power, whether breakers tripped, any burning smell, who can authorize work and the purchase order, then routes it to dispatch as urgent.
- Red flags
- Books it for tomorrow.
A business owner calls after failing a fire marshal inspection on emergency lights and exit signs. What do you do?
Situational · Inspection corrections
- Strong answer
- Gets the report and the deadline, books a technician before it, and makes sure any required correction paperwork gets back to the inspector.
- Red flags
- Books the next opening without asking about the deadline.
A property manager wants an estimate visit for a lighting retrofit, but the building requires escorts and visits only after hours. What do you do?
Situational · Scheduling site visits
- Strong answer
- Records the access rules, books a time that works for the estimator and the escort, and confirms the day before.
- Red flags
- Sends the estimator during the day.
A business wants a new circuit for a piece of equipment. Walk me through what you'd ask.
Technical · Taking equipment requests
- Strong answer
- Equipment make and model and its voltage, amps and phase, where it goes, where the panel is, photos of the nameplate and panel label, and the timeline.
- Red flags
- Just books a visit without details.
Tell me about a time a business customer's problem came back after a technician had closed the work order.
Behavioral · Following up
- Strong answer
- Took it seriously, got the details and a return visit booked fast, called afterward to confirm it was really fixed, and flagged the repeat to the service manager.
- Red flags
- Assumes a closed work order means the problem is fixed and never checks back.
Tell me about a time a business customer pushed back on a bill, such as after-hours rates or a trip charge, and you needed a manager's help.
Behavioral · Escalating billing disputes
- Strong answer
- Pulled the work order, rates and time on site, gave the manager a clear summary, told the customer when to expect an answer, and followed up.
- Red flags
- Passed it along with no notes, or promised a credit they couldn't approve.
Work exercise: Take three commercial calls
Have a manager play [three] made-up callers: a restaurant with a kitchen outage, a business that failed an emergency lighting inspection, and a property manager wanting an after-hours estimate. Give the candidate a work order form and rate notes and tone over [15] minutes.
Dispatcher
6 questions · Run a commercial board
Three calls come in at once: a medical office with no power to exam rooms, a retail store with a dark sign, and an office with flickering lights. How do you rank them?
Situational · Prioritizing by impact
- Strong answer
- Sends the medical office first, then decides the others by risk (flickering can mean a loose connection), checks who's qualified and close, and gives honest times.
- Red flags
- Takes them in order received.
A repair needs a building shutdown, and the customer wants it Saturday morning. What do you set up?
Situational · Planning shutdowns
- Strong answer
- Confirms date with the customer and building engineer, the crew and material, tenant notice, and any utility involvement, and books after-hours rates as agreed.
- Red flags
- Sends someone Saturday and hopes it works out.
Walk me through how you decide who can take a fire alarm call, a lift-access job or a switchgear repair.
Technical · Matching qualifications
- Strong answer
- Checks each electrician's certifications (fire alarm, lift operation, electrical safety training), experience with that equipment, and assigns only qualified people.
- Red flags
- Sends whoever is closest.
Your board shows a technician on a job for six hours that was supposed to take two. What do you do?
Situational · Tracking the field
- Strong answer
- Calls the technician to find out why, reassigns their next calls if needed, updates customers, and lets the service manager know.
- Red flags
- Assumes it's fine.
Tell me about a day when outage calls from business customers kept coming in after the board was already set.
Behavioral · Managing busy days
- Strong answer
- Names how they ranked calls (safety, business impact, contract response times), who they moved, how they told each customer and technician, and what they'd do the same again.
- Red flags
- Took calls first come, first served, or moved customers without telling them.
Tell me about a time you caught a mistake on a work order, such as a wrong voltage or missing equipment details, before the technician went out.
Behavioral · Catching work order errors
- Strong answer
- Explains how they spotted it (nameplate photos, past visits, details that didn't add up), how they got the right information from the customer, and the wasted trip it saved.
- Red flags
- Sends technicians with whatever the order says and lets them sort it out on site.
Work exercise: Run a commercial board
Give finalists a made-up board for [five] commercial electricians with their certifications, then hand them [three] calls one at a time, including a medical office outage and a weekend shutdown request. Ask them to assign out loud in [15] minutes, explaining each choice.
Bookkeeper
6 questions · Bill a month of work
Walk me through how a signed time-and-material ticket from the field becomes billed revenue.
Technical · Turning T&M tickets into invoices
- Strong answer
- Checks it's signed by an authorized customer contact, prices labor at contract rates and material at the agreed markup, attaches backup, and bills it or adds it to the change order log as the contract requires.
- Red flags
- Files the ticket and waits for the project manager.
The general contractor's pay application cutoff is tomorrow, and two project managers haven't sent their percent complete. What do you do?
Situational · Billing deadlines
- Strong answer
- Contacts them today, escalates to their manager if needed, submits on time with confirmed numbers, and sets reminders ahead of next month's cutoff.
- Red flags
- Misses the cutoff and waits a month.
A distributor bills you for switchgear that the project manager says hasn't been delivered. What do you do?
Situational · Paying for gear
- Strong answer
- Checks the purchase order and receiving records, confirms with the project manager and site, asks for proof of delivery or storage terms, and holds payment until it's confirmed.
- Red flags
- Pays it because it's on the purchase order.
A project manager says their job cost report shows material from someone else's job. What do you do?
Situational · Job cost accuracy
- Strong answer
- Traces the invoices, corrects the coding, finds why it happened (wrong purchase order number, unclear delivery address), and fixes the step.
- Red flags
- Moves the cost and changes nothing else.
Tell me about a time your mistake ended up on a pay application or invoice sent to a general contractor.
Behavioral · Owning mistakes
- Strong answer
- Explains the mistake, how they corrected it with the customer, and what they changed.
- Red flags
- Blames the field or the software.
Tell me about a time you had to get busy project managers to send percent complete or change order backup before a pay application deadline.
Behavioral · Working with project managers
- Strong answer
- Made it easy for them (templates, reminders, short deadlines), escalated politely when needed, and improved the process.
- Red flags
- Waited until they got around to it.
Work exercise: Bill a month of work
Give finalists [six] made-up time-and-material tickets, a contract rate sheet and a schedule of values. Ask them to price the tickets, find [two] that can't be billed yet and explain why, and draft the month's pay application in [30] minutes.
Inventory Specialist
6 questions · Plan a delivery schedule
Light fixtures for a job arrive early and the site has no secure storage. What do you do?
Situational · Protecting project material
- Strong answer
- Keeps them in the warehouse labeled by job, confirms quantities against the order, and schedules delivery when the site can receive and store them.
- Red flags
- Sends them to site anyway.
Walk me through how you track material from receipt to the job it's used on.
Technical · Tracking material by job
- Strong answer
- Receives against the purchase order, labels by job, issues it in the system to that job, records returns, and runs cycle counts.
- Red flags
- Tracks only what's on the shelf.
The breakers specified for a switchboard are backordered, and the distributor offers another brand's breakers that look like they'll fit. What do you do?
Situational · Substitutions
- Strong answer
- Doesn't accept them on their own, checks with the project manager because a substitute needs approval and must be listed for that switchboard, and documents the decision.
- Red flags
- Accepts them because they fit physically.
Crews keep stopping because common items like connectors and anchors run out. What do you do?
Situational · Critical stock
- Strong answer
- Sets minimums based on usage, sets up a reorder routine, and checks critical items daily.
- Red flags
- Orders more when someone complains.
Tell me about a time look-alike parts, such as breakers or fittings with similar part numbers, kept getting mixed up in your counts.
Behavioral · Fixing recurring count errors
- Strong answer
- Traced it to the cause (similar part numbers, shared bins, unclear labels), separated and relabeled them, fixed the item records, and checked that counts held.
- Red flags
- Kept correcting counts without finding out why the parts got mixed up.
Tell me about a time you tracked a long-lead order, such as switchgear, a transformer or a lighting package, so it arrived when the crew needed it.
Behavioral · Tracking long-lead material
- Strong answer
- Logged release and promised dates, checked in with the distributor on a schedule, caught a slip early, told the project manager with options such as a partial shipment, and confirmed delivery and storage.
- Red flags
- Placed the order and waited, finding out about the delay when the crew asked for it.
Work exercise: Plan a delivery schedule
Give finalists a made-up material list for a commercial job with lead times and a [six]-week crew schedule. Ask them to plan order and delivery dates and flag [two] risks in [20] minutes.
Sales Representative
6 questions · Present a retrofit
Walk me through how you'd prepare a bid for a commercial lighting retrofit.
Technical · Building a bid
- Strong answer
- Surveys fixtures and controls, confirms counts and mounting, prices material, labor, lifts and disposal, checks utility rebates and energy code needs, and lists clear exclusions.
- Red flags
- Uses a price per fixture without visiting.
You're presenting to a building owner who cares about payback and a facility manager who cares about disruption. How do you handle it?
Situational · Presenting to decision-makers
- Strong answer
- Addresses each person's concern directly (payback numbers for one, a work plan for the other), and keeps claims honest.
- Red flags
- Gives the same pitch to both.
A prospect asks you to guarantee a specific energy savings figure. What do you say?
Situational · Honest claims
- Strong answer
- Explains what the estimate is based on and what affects it, doesn't promise what they can't control, and documents assumptions.
- Red flags
- Guarantees a number to win.
Your proposal has been with a customer for a month with no answer. What do you do?
Situational · Following up
- Strong answer
- Follows up with useful information, asks what's holding the decision, and sets a next step.
- Red flags
- Keeps sending 'checking in' emails.
Tell me about a lighting retrofit or electrical upgrade you sold where the customer's biggest worry wasn't price.
Behavioral · Closing
- Strong answer
- Explains the real concern (keeping a business open, disruption, payback), how they shaped scope, phasing or after-hours work around it, and how they handled the hardest objection.
- Red flags
- Credits low price only, or can't say what the customer cared about.
Tell me about a bid you lost to a competitor whose lower number left out scope, such as lifts, disposal or controls.
Behavioral · Learning from losses
- Strong answer
- Explains how they found out, how they now spell out inclusions and exclusions so customers compare equal scopes, and a later bid where it helped.
- Red flags
- Blames the low bidder and changed nothing in how they present scope.
Work exercise: Present a retrofit
Give finalists a made-up fixture survey for a small warehouse with [40] old fixtures, energy costs and a utility rebate sheet. Allow [15] minutes to prepare, then have a manager play the owner in a [15]-minute presentation.
Apprentice Electrician
6 questions · Bend after a demo
A foreman from another crew asks you to pull wire into a panelboard, and you're not sure it's been locked out. What do you do?
Situational · Staying off energized work
- Strong answer
- Asks whether it's locked out and verified dead, waits for their own journeyman to confirm, puts on their own lock if your procedure calls for it, and doesn't touch anything until then.
- Red flags
- Starts because a foreman asked.
You're told to carry conduit up a scaffold that's missing a guardrail on one side. What do you do?
Situational · Scaffold and lift safety
- Strong answer
- Tells their journeyman or foreman and doesn't use it until it's fixed or cleared by the person in charge of scaffolds.
- Red flags
- Uses it carefully to avoid slowing anyone down.
A pipefitter starts moving your stacked conduit to make room for their material. What do you do?
Situational · Working around other trades
- Strong answer
- Stays polite, talks it through, and gets their journeyman or foreman involved if they can't agree on space.
- Red flags
- Argues, or lets it go and says nothing.
Walk me through how you'd measure and cut a piece of conduit to fit between two boxes.
Technical · Measuring and cutting conduit
- Strong answer
- Measures between the boxes, allows for the fittings, cuts square, and reams the cut end to remove burrs that could damage wire. Not knowing every term is fine.
- Red flags
- Cuts to a rough length and leaves the cut end sharp.
Tell me about a hands-on skill you got good at through practice at work, school or volunteering, such as measuring and cutting materials precisely.
Behavioral · Learning on the job
- Strong answer
- Describes what they practiced, how they got feedback and how they knew they'd improved.
- Red flags
- Can't name a skill they built through practice, or brushes off feedback as something they don't need.
Tell me about a time at work, school or volunteering when you kept the quality up on a long, repetitive task, such as labeling, assembling or measuring many of the same item.
Behavioral · Quality on repetitive work
- Strong answer
- Gives a specific example and explains how they paced themselves and checked their work.
- Red flags
- Rushed through it, quit, or stopped checking their work once it got boring.
Work exercise: Bend after a demo
In your shop, demonstrate bending a stub-up and an offset in EMT with a hand bender. Then give finalists a simple sketch and ask them to bend their own in [20] minutes, following your safety rules. Rate how they listen, measure and handle the tools.
Journeyman Electrician
6 questions · Bend to a drawing
Walk me through how you lay out and bend an offset to get EMT around an obstruction.
Technical · Bending offsets
- Strong answer
- Measures the offset depth, picks an angle, uses the bender's multiplier to space the marks, allows for shrink, keeps both bends in the same plane, and checks it against the obstruction.
- Red flags
- Bends by eye and fixes it with extra bends.
Walk me through installing and terminating a new feeder to a panelboard.
Technical · Installing feeders
- Strong answer
- Checks size and route against the drawings, pulls with proper lubricant and care, keeps phase identification, insulation-tests it, terminates and torques to the manufacturer's values with a calibrated tool, and labels.
- Red flags
- Pulls it in and tightens by feel.
The general contractor's superintendent wants a new circuit landed in a live panel today because the shutdown isn't until Saturday. What do you do?
Situational · Pressure to work energized
- Strong answer
- Won't work energized without a justified, approved energized-work permit under the company's program, explains why to the superintendent and foreman, and plans for the shutdown.
- Red flags
- Does it live to keep the superintendent happy.
The panel schedule calls for more load than you think the panel can carry. What do you do?
Situational · Drawing problems
- Strong answer
- Checks their math, raises it with the foreman or project manager for an RFI, and doesn't change the design on their own.
- Red flags
- Installs it as drawn, or rearranges circuits without telling anyone.
Tell me about a time another trade's work blocked your conduit or cable runs.
Behavioral · Trade coordination
- Strong answer
- Talked with the other trade, brought in the foreman when needed, stayed productive elsewhere, and documented the delay.
- Red flags
- Waited, or tore out the other trade's work.
Tell me about a time you taught an apprentice a task on a commercial job, such as bending offsets or terminating feeders.
Behavioral · Teaching apprentices
- Strong answer
- Explained why, showed how, let them do it with supervision, and checked the work.
- Red flags
- Did it themselves to save time.
Work exercise: Bend to a drawing
In your shop, give finalists a short length of EMT, a hand bender and a made-up sketch calling for an offset and a stub-up at set distances. Ask them to bend it in [20] minutes and explain their marks. Rate accuracy and method.
Master Electrician
6 questions · Review a one-line
Walk me through how you review a one-line diagram and panel schedules for a tenant improvement before work starts.
Technical · Reading a one-line diagram
- Strong answer
- Traces power from service to panels, checks feeder and breaker sizes, transformer sizing, available fault current and equipment ratings, load on each panel, and flags conflicts with RFIs.
- Red flags
- Trusts the drawings and starts.
A building's lights flicker and some equipment resets randomly. Walk me through how you'd find the cause.
Technical · Solving complex problems
- Strong answer
- Gathers when and where it happens, logs voltage over time, uses thermal imaging with proper PPE to find loose neutrals or terminations, looks at large loads starting and the utility supply, and tests one idea at a time.
- Red flags
- Replaces fixtures or breakers at random.
You notice a journeyman torquing terminations by feel. How do you handle it?
Situational · Mentoring
- Strong answer
- Explains why torque values matter and that code requires them to be applied correctly, shows using a calibrated tool, and checks their work later.
- Red flags
- Ignores it because the journeyman is experienced.
Your license is on the permit, and the general contractor wants to energize a new panel before final inspection. What do you do?
Situational · License responsibility
- Strong answer
- Refuses unless the inspector approves temporary energizing, explains the risk, and works to get the inspection done quickly.
- Red flags
- Allows it to keep the schedule.
Tell me about the most complex electrical project you led, such as a switchgear replacement in an occupied building.
Behavioral · Leading teams
- Strong answer
- Gives the scope, their role, a hard problem they solved and how it finished.
- Red flags
- Is vague about their role.
Tell me about a quality standard you introduced, such as a termination torque check or a labeling standard, that reduced rework.
Behavioral · Raising standards
- Strong answer
- Names the standard, why it was needed, how they trained crews on it, and the drop in rework or failed inspections.
- Red flags
- Treats the inspector as the quality check, or names a rule they announced but never trained or checked.
Work exercise: Review a one-line
Give finalists a made-up one-line diagram and [three] panel schedules for a small tenant improvement with [three] planted errors, such as an undersized feeder and an overloaded panel. Ask them to find the errors and draft RFIs in [30] minutes.
Start Hiring Now.
Tell us who you need to hire. Compare plans, then work with HireBus to set up your first role.

Used it to hire 8 people in the past 2 weeksRyan Johnson, Thee Window Ninjas
Plan details, setup costs, and advertising spend · See pricing