Commercial painting project manager job description

A commercial painting project manager runs painting jobs from takeoff to closeout: checking the spec and color schedule, getting products approved, sizing crews and planning lifts. They keep each job inside the general contractor's schedule and budget, handle changes and billing, and hand the building over with the punch list done.

Median pay, painting contractors · BLS, May 2025

$95,530 a year$45.93 an hour

Annual pay: 10th percentile $55,660, middle half $73,790 to $123,320, 90th percentile $166,590. Source: BLS Occupational Employment and Wage Statistics, May 2025.

Reports to
Operations Manager
Department
Operations
Schedule
Weekdays, 7 to 3:30, plus some nights · Several job sites a day, office time for submittals, evening checks on night crews, and some weekend work
Also called
Painting project manager · Commercial paint PM · Painting and wallcovering PM · Estimator / project manager

Commercial painting project manager job description template

This is our Role Blueprint, word for word. Replace the highlighted fields and adjust the example targets and pay to fit your company.

Download as Word file

Painting - Commercial - Project Manager

Company Name:
[INSERT COMPANY NAME HERE]
Department:
Operations
Reports to:
Operations Manager
Location:
[INSERT LOCATION HERE]

1. Position Summary

You'll run commercial painting jobs from takeoff to final punch. You check the paint spec and color schedule, submit products and drawdowns, size crews from production rates, plan lifts and scaffolding, and work around tenants in occupied buildings. You keep to the general contractor's schedule, handle changes and billing, and close out with touch-up and attic stock.

2. Essential Duties and Responsibilities

  • Review the painting spec, finish schedule and color schedule, and confirm the coating system for every surface before work starts.
  • Check the takeoff and budget, then size crews with the Production Manager using our production rates.
  • Submit product data, color drawdowns and sample areas, and get approval before ordering paint.
  • Plan lifts, scaffolding and swing-stage work, plus protection for floors, finishes and occupied spaces.
  • Schedule painting around drywall finishing, ceilings, flooring and the general contractor's sequence.
  • Document damage from other trades with photos, and price the repair as a change order or back-charge.
  • Lead punch walks with the general contractor and architect, and deliver attic stock, the final color schedule and the warranty at closeout.

3. Key Tasks / Daily Activities

  • Walk a job with the Lead Painter to check surface prep, mil thickness and finish quality against the spec.
  • Confirm tomorrow's areas are ready: drywall finished, ceilings in and other trades out.
  • Update the general contractor on progress and the areas we need released.
  • Order paint and sundries, and check that color batches match.
  • Track crew hours against budget by floor or area.

4. Key Performance Indicators (KPIs)

  • Crew hours per area compared with the bid: [your target].
  • Punch items per area at the final walk: [your target].
  • Touch-up hours after turnover: [your target].
  • Back-charges recovered for other trades' damage: [your target].
  • Jobs finished inside the general contractor's painting window: [your target].

5. Required Qualifications and Skills

  • [3+] years managing commercial painting or wallcovering jobs, or [5+] years running commercial paint crews.
  • Can read architectural plans, finish schedules and painting specs.
  • Knows surface prep and coating systems for drywall, masonry, metal and wood.
  • Can build or check a takeoff and turn production rates into crew size and schedule.
  • Runs takeoffs, budgets and billing in [your project management and estimating software].

6. Preferred Experience

  • Experience with epoxies, urethanes and other high-performance coatings, and dry film thickness testing.
  • AMPP coating inspector training (formerly NACE or SSPC).
  • Experience with wallcovering and specialty finishes, if they're in your scope.
  • Aerial lift and scaffold training, plus OSHA 30.

7. Physical Requirements

  • Walk job sites, climb ladders and ride lifts to check work at height.
  • Carry five-gallon pails, drop cloths and sample boards up to [50] pounds.
  • With or without reasonable accommodation.

8. Work Environment and Schedule

  • Several job sites a day across [your service area], plus office time for submittals and billing.
  • Regular hours: [7 a.m. to 3:30 p.m., Monday through Friday], plus evening checks on night crews.
  • Night and weekend work in occupied offices, schools and stores.
  • Paint and solvent odors, dust, and weather on exterior work.

9. Compensation and Benefits

  • Pay: [range and hourly or salary basis].
  • Additional pay: [overtime, bonus or incentive terms, or none].
  • Benefits: [health, dental, vision, retirement, paid time off, and when they start].

10. Company Culture and Overview

  • [Two or three sentences on what your company does, the area you serve, and the support a new project manager gets in the first 90 days.]

11. How to Apply

[Apply link or email]. Our process: [phone interview, in-person interview, and next steps]. Contact [hiring contact] if you need an accommodation during the application process.

Need help filling this role? HireBus posts the ad, Iris interviews every applicant by phone before you do, and you decide who to hire. Start hiring now

Download as Word file

Commercial Painting Project Manager · Word (.docx) · No email needed

Hiring for more than one seat? Get all 21 Commercial painting Role Blueprints free, from leadership to the field.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

What the paint spec asks of a project manager

Commercial painting jobs are priced and judged against a written spec. The project manager reads it before the crew does and catches what it includes, what it leaves out and how thick each coat must be.

  • Exposed pipe and conduit may be yours

    Read the mechanical and electrical part of the painting section closely. The federal painting guide spec, for one, says that where a space is to be painted, exposed piping, conduit, ductwork, supports, hangers, air grilles and registers are included unless shown otherwise. A takeoff that counts only walls and ceilings misses that labor in a mechanical room or an open-ceiling store. Source: UFGS 09 90 00, Paints and Coatings (August 2026), mechanical and electrical painting.

  • The spec also lists what stays bare

    The same guide spec says not to paint surfaces in concealed spaces, such as above suspended ceilings and in chases, hardware and factory-finished items, or copper, stainless steel and aluminum, unless the drawings call for it. Painting what should stay bare wastes labor and can draw a back-charge. Mark those items on the drawings the lead painter carries. Source: UFGS 09 90 00, Paints and Coatings (August 2026), painting excluded.

  • Mils are measured, not guessed

    Many specs set a minimum dry film thickness for each coat, and the federal guide spec uses 1.5 mils per coat where its tables don't say otherwise. On steel, check it with a dry film gauge after each coat. On walls, a wet film gauge used while the crew rolls or sprays catches a thin coat sooner. Record the readings by area so a failed check can be traced. Source: UFGS 09 90 00, Paints and Coatings (August 2026), minimum dry film thickness.

  • Mixed batches show on long walls

    Two batches of the same color can differ slightly, and the difference shows on a long corridor or an exterior elevation. When a wall needs more than one container, have the crew box the paint by mixing the cans together before starting, and finish each wall from one mix. Check batch numbers on delivery and order enough of one batch for each elevation.

How much commercial painting project managers make

The closest BLS group for commercial painting project managers is construction managers. Construction managers who work for painting contractors earned a median of $95,530 a year ($45.93 an hour) in May 2025, according to the Bureau of Labor Statistics. That’s below the $114,990 median for construction managers in all industries. About 2,690 of the 380,360 construction managers in that survey work for painting contractors.

Most earn a salary, and many shops add a bonus for job profit or crew hours against budget. There's no pay section in this template, so set the range from the BLS figures on this page and local offers.

Painting contractors
All industries
10th–90th percentileMiddle halfMedianAnnual pay, May 2025. Source: BLS Occupational Employment and Wage Statistics.
Annual pay by percentile
Group10th25thMedian75th90th
Painting contractors$55,660$73,790$95,530$123,320$166,590
All industries$69,690$88,550$114,990$151,640$189,440

BLS reports residential and commercial painting contractors together. Post a real range for your market in the ad.

Skills to hire for, and what you can teach

Hire for these

  • Reads specs, finish schedules and architectural plans quickly
  • Builds or checks a takeoff and turns it into crew size
  • Writes clear RFIs, change orders and back-charge letters
  • Knows coating systems for drywall, masonry, metal and wood
  • Pushes a GC for released areas without losing the relationship

Teach these on the job

  • Your project management and estimating software
  • Each GC's billing format and pay application rules
  • Dry film thickness testing
  • Your production rates by surface
  • Wallcovering and specialty finishes, if they're in your scope

Takeoff software such as On Center or PlanSwift, Procore or the GC's own platform for submittals and RFIs, and your job costing system for billing. In the field: a dry film thickness gauge, wet film gauges, a moisture meter and a phone camera for damage photos. Put your software in the template's bracket.

Commercial painting project manager interview questions

Two of the 6 questions we'd ask, and what a strong answer sounds like. Ask every candidate the same questions, and rate each answer on your own before you compare notes.

  1. Situational · Areas not ready

    The GC's schedule has your crew starting Monday on floor three, but drywall finishing is behind. What do you do?

    A strong answer: Walks the floor, documents what's not ready, notifies the GC in writing, proposes another sequence, and tracks the delay's cost and schedule impact.

  2. Behavioral · Clean closeout

    Tell me about the last two weeks of a commercial painting job you closed out cleanly.

    A strong answer: Punch walks, touch-up, attic stock, final color schedule, warranty, final pay app, lien waivers and retainage follow-up.

All 6 questions and the work exercise

Commercial painting project manager KPIs

The template leaves every target in brackets. Fill them from the last few jobs your project managers ran, and agree how each figure is pulled before pay rides on it.

Crew hours per area compared with the bid
Pull crew hours by floor or area from weekly time sheets and set them beside the bid hours for that area.
Punch items per area at the final walk
Count the items on the GC's or architect's punch list that are ours, area by area, leaving out damage by other trades.
Touch-up hours after turnover
Track hours crews spend going back after the GC accepts an area, and note whether each trip was our miss or someone else's damage.
Back-charges recovered for other trades' damage
Compare the value of damage you documented and priced with what the GC or the other trade actually paid or credited.
Jobs finished inside the general contractor's painting window
Check each job's painting start and finish against the window in the GC's schedule, adjusted for approved changes.

Career path

  1. Estimator or field supervisorLearns pricing from the bid side, or the spec from the field side.
  2. Project managerRuns several commercial painting jobs from takeoff to closeout.
  3. Senior project managerHandles the biggest buildings and mentors the newer PMs.
  4. Operations managerSets the crew plan and equipment for all jobs.

Other roles in a commercial painting business

All 21 are in the free Commercial painting Role Blueprint Super Bundle, as Word files you can edit.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

Commercial painting project manager FAQ

What should a commercial painting project manager do when the color schedule misses a room?

Don't pick a color in the field. Send an RFI through the general contractor naming the room, the surfaces and the drawing sheet, and keep crews painting other areas while the architect answers. If the answer comes late or adds a color, note the delay and any extra cost and handle it the way your subcontract requires. Crews should never paint a best guess.

How much does a commercial painting project manager make?

Construction managers who work for painting contractors earned a median of $95,530 a year ($45.93 an hour) in May 2025, according to the Bureau of Labor Statistics. The middle half earned between $73,790 and $123,320 a year. Pay also depends on your local market, experience and bonus terms.

Is AMPP coating inspector training worth it for a commercial painting project manager?

It depends on your work. If you bid structural steel, tanks, parking decks or epoxy and urethane systems, inspector training helps a project manager read coating specs, run thickness and other tests, and talk with an owner's inspector on equal terms. For mostly drywall and tenant improvement work, it buys less. A sensible middle path is to pay for it once a project manager starts running high-performance coating jobs.

Does a commercial painting project manager need OSHA 30?

OSHA doesn't require it. OSHA calls its Outreach program voluntary, says none of its courses is a certification or satisfies a training requirement written into an OSHA standard, and calls the 30-hour class a better fit for supervisors. Some states, cities and others may require outreach training as a condition of work, so check the rules where your crews work. The template lists it as a preferred skill.

What does the project manager template mean by climbing ladders, riding lifts and carrying pails?

Those lines describe checks a project manager makes in person: going up a ladder to inspect a high cut line, riding a lift up an atrium wall to take thickness readings, and hauling a pail, drop cloths or a sample board from the truck. List the tasks as written and talk with candidates about accommodation, which the template already mentions.

Sources

Start Hiring Now.

Tell us who you need to hire. Compare plans, then work with HireBus to set up your first role.