Commercial painting field supervisor job description

A commercial painting field supervisor runs several painting crews across job sites and checks prep, finish, safety and progress against the general contractor's schedule. On each site they speak for the company and settle problems with superintendents, tenants and property managers before a crew loses a day.

Median pay, painting contractors · BLS, May 2025

$30.66 an hour$63,780 a year

Annual pay: 10th percentile $46,850, middle half $56,500 to $79,810, 90th percentile $104,290. Source: BLS Occupational Employment and Wage Statistics, May 2025.

Reports to
Production Manager
Department
Operations
Schedule
Weekdays, 7 a.m. to 5 p.m. · Driving between job sites, longer days near deadlines, and on call when a site has an urgent problem
Also called
Painting superintendent · Paint foreman · General foreman · Field superintendent

Commercial painting field supervisor job description template

This is our Role Blueprint, word for word. Replace the highlighted fields and adjust the example targets and pay to fit your company.

Download as Word file

Painting - Commercial - Field Supervisor

Company Name:
[INSERT COMPANY NAME HERE]
Department:
Operations
Reports to:
[Production Manager]
Location:
[INSERT LOCATION HERE]

1. Position Summary

Oversee commercial painting projects by supervising painting crews, ensuring high-quality workmanship and adherence to project specifications. Act as the primary on-site point of contact to resolve any issues promptly and efficiently. Ensure compliance with safety standards, environmental regulations, and company policies. Contribute to the overall operational success by maintaining project schedules, budgets, and customer satisfaction.

2. Essential Duties and Responsibilities

  • Supervise and lead commercial painting crews on-site to maintain consistent quality and productivity.
  • Quickly address on-site issues, including unforeseen challenges and client concerns, to minimize project delays.
  • Enforce strict compliance with safety protocols, industry standards, and environmental regulations.
  • Collaborate with project managers, subcontractors, and other stakeholders to ensure timely project completion.

3. Key Tasks / Daily Activities

  • Conduct daily briefings with painting crews to review project goals and safety procedures.
  • Inspect job sites to verify that work meets quality standards and compliance requirements.
  • Maintain open communication with clients to provide updates and address queries during project execution.
  • Document project progress, challenges, and resolutions to support operational improvements.

4. Key Performance Indicators (KPIs)

  • On-time project completion rate: 95% or higher.
  • Safety compliance incidents: Less than 2% per quarter.
  • Customer Satisfaction Rating: Greater than 4.8 stars.
  • Rework rate on completed tasks: Below 5%.

5. Required Qualifications and Skills

  • High School Diploma or equivalent; additional technical or vocational training preferred.
  • Minimum of 3 years' experience in commercial painting or related field with supervisory responsibilities.
  • Strong leadership and communication skills to manage teams and interact with clients.
  • Proficient in understanding and enforcing safety and compliance standards on job sites.

6. Preferred Experience

  • Prior experience working in the commercial painting industry on large-scale projects.
  • Demonstrated track record in crew supervision and effective problem resolution.
  • Familiarity with industry-standard tools, equipment, and painting techniques.
  • Experience with project scheduling, budgeting, and reporting in a construction or home services environment.

7. Physical Requirements

  • Ability to lift up to 50 lbs and perform physically demanding tasks throughout the workday.
  • Comfortable working in varying weather conditions including extreme heat or cold.
  • Required to work in outdoor environments and potentially on uneven surfaces.
  • Frequent standing, walking, climbing stairs, and bending associated with supervision tasks.

8. Work Environment and Schedule

  • Typical work hours are Monday through Friday, 7:00 AM to 5:00 PM.
  • Occasional extended hours may be required to meet project deadlines.
  • Travel between job sites is expected on a regular basis.
  • May need to be on-call for urgent project issues or client emergencies.

9. Compensation and Benefits

  • Typical salary range: $55,000 - $70,000 USD per year, based on experience.
  • Eligibility for performance-based bonuses linked to project success and client satisfaction.
  • Comprehensive benefits package including Health, Dental, Vision, and 401k.
  • Additional perks may include paid time off, training, and career development opportunities.

10. Company Culture and Overview

  • At [INSERT COMPANY NAME HERE], we foster a collaborative, innovative, and inclusive work environment.
  • Our team is committed to excellence in both service delivery and personal development.
  • We value initiative, open communication, and continuous improvement at every level of the organization.
  • Join us to build a rewarding career where your efforts directly contribute to customer satisfaction and company growth.

11. How to Apply

If you meet the above criteria and want to be part of a growth-oriented company focused on customer satisfaction, please send your resume to [INSERT EMAIL HERE] or apply online at [INSERT WEBSITE LINK HERE].

Need help filling this role? HireBus posts the ad, Iris interviews every applicant by phone before you do, and you decide who to hire. Start hiring now

Download as Word file

Commercial Painting Field Supervisor · Word (.docx) · No email needed

Hiring for more than one seat? Get all 21 Commercial painting Role Blueprints free, from leadership to the field.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

What changes for a field supervisor on commercial painting jobs

This supervisor covers several buildings a day and seldom holds a roller. The work is making sure each site is safe, staffed and painting to the spec while other trades move around the crews.

  • Site inspections are a named job

    OSHA's construction rules call for frequent, regular checks of job sites, materials and equipment. Competent persons named by the employer must do them. On a painting job that means the lifts, ladders, planks, spray rigs and cords, not just the walls. Name the supervisor as that person for each site in writing. Keep the walk notes where a GC's safety manager can see them. Source: eCFR: 29 CFR 1926.20, general safety and health provisions.

  • Power lines set the exterior setup

    Exterior repaints can put scaffolds next to service drops and street lines. OSHA keeps a scaffold at least 3 feet from insulated lines under 300 volts. For bare lines under 50 kV, the gap is 10 feet. The same limits apply to metal poles and other conductive things handled on the scaffold. Closer work needs the utility to cut power, move the lines or cover them first. Check the gap each time the scaffold goes up or moves. Source: eCFR: 29 CFR 1926.451(f)(6), scaffold clearance from power lines.

  • Fall training needs a signed record

    Painters who work near roof edges, open floor edges and stair openings must be trained to spot fall hazards. A competent person does the training. OSHA then wants a signed certification record for each painter that shows who was trained, when, and who signed for it. When a GC asks for proof on day one, the supervisor should have that sheet for every painter on site, even a new hire sent over that morning. Source: eCFR: 29 CFR 1926.503, fall protection training requirements.

  • Smoke detectors on sanding and spray days

    Sanding dust and overspray can set off or clog smoke detectors in a building that's open. Before a crew bags a detector, clear it with the GC or the building engineer. They may need to call the alarm company or set up a fire watch. Uncover every device before the crew leaves, and list the room numbers so nothing stays bagged overnight.

How much commercial painting field supervisors make

The closest BLS group for commercial painting field supervisors is First-Line supervisors of construction trades and extraction workers. First-Line supervisors of construction trades and extraction workers who work for painting contractors earned a median of $30.66 an hour ($63,780 a year) in May 2025, according to the Bureau of Labor Statistics. That’s below the $79,920 median for First-Line supervisors of construction trades and extraction workers in all industries. About 13,560 of the 812,210 First-Line supervisors of construction trades and extraction workers in that survey work for painting contractors.

Usually a salary, with the template's bonus for project results and client ratings. The template's band brackets the BLS median for painting-contractor supervisors and stops far short of their top tenth.

Painting contractors
All industries
10th–90th percentileMiddle halfMedianAnnual pay, May 2025. Source: BLS Occupational Employment and Wage Statistics.
Annual pay by percentile
Group10th25thMedian75th90th
Painting contractors$46,850$56,500$63,780$79,810$104,290
All industries$53,280$63,400$79,920$101,460$128,260

BLS reports residential and commercial painting contractors together. Post a real range for your market in the ad.

The pay line in the template above is an example from our Role Blueprint. Set yours from these figures and what local companies pay.

Skills to hire for, and what you can teach

Hire for these

  • Reads a painting spec and finish schedule well enough to catch a wrong sheen or a missed coat
  • Keeps several foremen on plan without taking over their crews
  • Says no to a GC superintendent politely, then calls the project manager
  • Spots poor prep on sight: unsanded patches, flashing, missed caulk, dirty steel
  • Takes clear notes and useful photos before leaving each site

Teach these on the job

  • Your company's field reports and photo app
  • Each general contractor's site rules and orientation
  • Your production rates and how jobs are bid
  • Formal competent person training for scaffolds and lifts
  • Coating systems for metal, masonry and high-performance work

A phone or tablet carries the job: photos, field reports, and the general contractor's project platform, such as Procore, where punch lists and RFIs live. The truck carries a moisture meter, a wet film gauge, a strong flashlight for checking walls at a low angle, and the color schedule. Name your field app in the ad.

Commercial painting field supervisor interview questions

Two of the 6 questions we'd ask, and what a strong answer sounds like. Ask every candidate the same questions, and rate each answer on your own before you compare notes.

  1. Situational · Getting extra work in writing

    The GC's superintendent asks your crew to repaint a corridor another trade damaged and says they'll sort it out later. What do you do?

    A strong answer: Gets a signed time-and-material ticket or written direction before or as the work happens, takes photos, and tells the project manager.

  2. Behavioral · Reducing punch items

    Tell me how you've reduced punch items on your crew's work.

    A strong answer: Has painters check their own areas in raking light before turnover, walks each area before the GC does, coaches on repeat misses, and shows fewer punch items.

All 6 questions and the work exercise

Commercial painting field supervisor KPIs

Swap the template's numbers for ones drawn from last year's painting jobs, and agree with the supervisor up front how every event is counted, so the score reflects the sites they ran.

On-time project completion rate
Compare each job's finish with the painting dates in the GC's current schedule, and mark delays caused by areas not released so the supervisor is judged fairly.
Safety compliance incidents
Count safety write-ups, near misses and OSHA recordable cases on the supervisor's sites each quarter, measured against crew hours worked there so busy quarters compare fairly.
Customer Satisfaction Rating
Ask the GC superintendent and the property manager to rate each job at closeout on quality, communication and cleanup, using the same short form every time.
Rework rate on completed tasks
Track hours spent redoing work the crew had marked complete, against total job hours, and separate your own misses from damage by other trades.

Career path

  1. Lead painterRuns one crew on one building and learns the spec, the punch list and the GC's rules.
  2. Field supervisorOversees several crews and sites, and answers for safety and quality across all of them.
  3. Production managerSets production rates, methods and equipment standards for the whole company.
  4. Operations managerDecides where crews go each day and keeps every job staffed.

Other roles in a commercial painting business

All 21 are in the free Commercial painting Role Blueprint Super Bundle, as Word files you can edit.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

Commercial painting field supervisor FAQ

Should a commercial painting field supervisor hold a first aid card?

It's a good idea. OSHA's construction rule covers sites with no clinic, hospital or doctor close by in time and distance. There, a person holding a valid first aid certificate has to be available at the worksite. A GC may cover that on a big site. Small jobs, night shifts and remote buildings may have nobody else, so a supervisor with a current card and a stocked kit in the truck fills the gap.

How much does a commercial painting field supervisor make?

First-Line supervisors of construction trades and extraction workers who work for painting contractors earned a median of $30.66 an hour ($63,780 a year) in May 2025, according to the Bureau of Labor Statistics. The middle half earned between $56,500 and $79,810 a year. Pay also depends on your local market, experience and overtime.

How should a field supervisor handle an OSHA inspector arriving at our site?

Ask to see the inspector's credentials, which carry a photo and a serial number. Then call the production manager. At the opening meeting the inspector explains the scope, and the employer picks someone to walk along. On a painting site that is often the supervisor. Walk only the areas the inspection covers and take the same photos the inspector takes. Fix a simple hazard on the spot if you can. OSHA still cites it, but calls a prompt fix a sign of good faith.

How does a field supervisor keep finish quality the same across several crews?

Set one way of working and check it the same way everywhere. Every crew uses the roller nap and sheen the spec calls for, cuts lines to the same standard, and back-rolls sprayed walls if your method says to. On each visit, hold a flashlight flat to the wall, the way the punch walk will. When one crew's work looks different, fix the method on the spot, not just the wall.

Which site tasks explain the field supervisor template's lifting, weather and stair lines?

They come from site walks, not from painting all day. The supervisor carries pails, drop cloths and sample boards from the truck. They climb stairs in buildings with no working elevator, cross rough ground on new sites, and check outside work on hot summer days and cold winter ones. Bending covers looking at baseboards and low prep. Write the site walk into the posting; if a candidate raises an accommodation, work it out together.

Sources

Start Hiring Now.

Tell us who you need to hire. Compare plans, then work with HireBus to set up your first role.

Start Hiring Now
I have to turn it off today, we have so many applicants I can’t keep upJC Chanowsky, Patriot Illumination

Plan details, setup costs, and advertising spend · See pricing