Excavation & site work interview questions
122 interview questions for the 20 roles a $20M business in this industry hires for, from leadership to the field. Each role has job-related questions, what strong and weak answers sound like, and a short work exercise.
20 roles. Open one to see its questions, or open them all.
Chief Executive Officer
6 questions · Read a company snapshot
A developer offers a contract twice the size of your biggest job, and the performance bond would use most of your bonding capacity. How do you decide whether to take it?
Situational · Bonding capacity and risk
- Strong answer
- Weighs cash flow, equipment and crew capacity, contract terms, the customer's payment history, and what else the bond would block, talks to the surety early, and is willing to walk away.
- Red flags
- Takes it because it's big, or decides without looking at cash, crews or contract terms.
How do you decide how much public bid work, private contractor work and residential work your company should chase?
Technical · Choosing the work mix
- Strong answer
- Compares margins, competition, payment terms, retainage, prevailing wage and bonding needs, how well the fleet fits each type, and how each market moves in a slowdown.
- Red flags
- Chases whatever is out there with no view of margins or risk.
Your backlog drops sharply heading into winter, and your best operators are asking whether there will be work. What do you do?
Situational · Managing a backlog drop
- Strong answer
- Reviews the pipeline and cash runway, targets work that fits winter conditions, decides early which people and machines to protect, and tells crews the truth about the plan.
- Red flags
- Waits for spring, makes promises it can't keep, or lays off the core team without a plan.
Tell me about the biggest equipment or hiring bet you've made and how it turned out.
Behavioral · Capital decisions
- Strong answer
- Names the bet, like a dozer with GPS grade control or a new pipe crew, the utilization or backlog numbers behind it, what happened, and what they would do differently.
- Red flags
- Only tells success stories or can't explain how the decision was made.
Tell me about a time you had to remove a senior leader, such as an operations or estimating head, whose results kept missing.
Behavioral · Holding leaders accountable
- Strong answer
- Set clear expectations first, gave honest feedback and time to improve, then acted, handled the exit with respect, and covered the gap.
- Red flags
- Avoided it for years or fired someone without warning or documentation.
Tell me about something you did as a leader that made field crews more willing to stop work over a safety concern.
Behavioral · Safety culture
- Strong answer
- Gives a concrete action, such as backing a foreman who stopped a job or acting on near-miss reports, and shows how they knew crews believed it.
- Red flags
- Talks only about posters and policies, or treats safety as the safety manager's job.
Work exercise: Read a company snapshot
Give finalists a one-page made-up company snapshot: revenue by work type, backlog by month, fleet age, bonding capacity, and one general contractor that makes up a large share of revenue. Ask them to name the two biggest risks and outline their first [90] days in [30] minutes.
Chief Operating Officer
6 questions · Right-size a sample fleet
How do you measure fleet utilization across the company?
Technical · Fleet utilization
- Strong answer
- Tracks engine hours and days on jobs against days available by machine, separates idle engine time from working hours using telematics, and uses the numbers to sell, move, rent out or replace machines with rentals.
- Red flags
- Keeps every machine because it might be needed, or has no utilization data.
A trench wall caves in on one of your jobs minutes after a worker climbed out. No one is hurt. What do you do in the next week?
Situational · Learning from near misses
- Strong answer
- Stops similar work, investigates why the trench was unprotected or the inspection missed it, fixes the system, retrains, and shares what happened across every crew.
- Red flags
- Treats it as luck, or blames one worker without looking at supervision and process.
Your field supervisors keep asking for more equipment, but your data shows the fleet is underused. What do you do?
Situational · Resource requests versus data
- Strong answer
- Looks at where and when machines sit idle, checks whether the problem is scheduling or moving equipment, involves supervisors in the fix, and buys only if the data supports it.
- Red flags
- Buys machines to keep the field happy, or dismisses the complaint.
Walk me through how you'd set up daily reporting so the office sees each crew's production, hours and problems the same day.
Technical · Field reporting
- Strong answer
- Uses a short daily report from each foreman with quantities, equipment hours, delays and safety notes, ties it to job cost codes, and reviews exceptions every morning.
- Red flags
- Relies on weekly phone calls or time cards alone.
Tell me about a time you rolled out a new operating standard to crews who were used to doing things their own way.
Behavioral · Rolling out standards
- Strong answer
- Got foremen's input first, explained why, trained and checked the work in the field, and followed through on crews who didn't adopt it.
- Red flags
- Sent a memo and assumed it was done.
Tell me about a time you changed how jobs were bid or scheduled so crews weren't pushed to skip trench protection or other safety steps.
Behavioral · Building safety into bids and schedules
- Strong answer
- Names the pressure point, like production rates that left no time for shoring, the change, such as bidding in protective systems and schedule buffers and backing foremen who stop work, and how they knew it worked.
- Red flags
- Tells crews to be safe but keeps the same schedules and bids.
Work exercise: Right-size a sample fleet
Give finalists made-up fleet data: [12] machines with engine hours, idle time, repair costs, and next quarter's backlog by job. Ask them to recommend which machines to keep, sell, or replace with rentals and explain it as they would to the CEO in [30] minutes.
Chief Financial Officer
6 questions · Build a sample WIP schedule
Walk me through how you build a work-in-progress schedule and what over- and under-billing tell you about a job.
Technical · Work-in-progress reporting
- Strong answer
- Uses contract value, estimated total cost and cost to date to get percent complete and earned revenue, compares to billings, and treats steady under-billing as a sign of hidden overruns.
- Red flags
- Can't explain percent complete or thinks under-billing is always good news.
How do you set an hourly cost rate for an excavator so estimators price jobs correctly?
Technical · Equipment cost rates
- Strong answer
- Adds ownership costs like depreciation, interest, insurance and taxes to operating costs like fuel, maintenance and wear parts, divides by expected hours, and checks the rate against actuals.
- Red flags
- Uses a rental company's rate or a number from years ago without checking real costs.
A general contractor is far behind on payment, retainage on three jobs is tied up, and payroll is next week. What do you do?
Situational · Cash flow and lien rights
- Strong answer
- Updates the cash forecast, calls the contractor's decision-maker, tracks lien notice deadlines, lines up credit if needed, and protects payroll and tax deposits first.
- Red flags
- Waits for the check, or misses lien deadlines while hoping it works out.
Operations wants to buy two new excavators. You think renting makes more sense. How do you handle it?
Situational · Buy, lease or rent
- Strong answer
- Builds a buy, lease and rent comparison using real utilization, cash and bonding impact and tax effects, shares it with operations, and agrees on what data would change the answer.
- Red flags
- Blocks it on instinct, or approves it to avoid conflict.
Tell me about a time you spotted a job losing money before the project team did.
Behavioral · Finding losing jobs early
- Strong answer
- Describes the signal they saw, such as cost to date outrunning progress, how they raised it, and what the team changed to limit the loss.
- Red flags
- Only found losses at closeout.
Tell me about a time you worked with a surety or bank to raise bonding capacity or a credit line.
Behavioral · Surety and bank relationships
- Strong answer
- Explains what the surety or bank needed, such as timely statements and a clean WIP schedule, what they prepared, and the result.
- Red flags
- Has never dealt with a surety or bank, or treats them as a formality.
Work exercise: Build a sample WIP schedule
Give finalists made-up data for [five] jobs: contract value, cost to date, estimated cost to complete, and billings to date. Ask them to build a simple work-in-progress schedule, flag over- and under-billed jobs, and list the question they would ask each project manager in [30] minutes.
General Manager
6 questions · Review a monthly report
Your estimators keep winning jobs that the field loses money on. What do you do?
Situational · Closing the bid-to-field gap
- Strong answer
- Compares bid against actual by cost code, finds where it breaks, such as production rates or trucking, and sets up post-job reviews between estimating and the field.
- Red flags
- Blames the field or tells estimators to raise every price.
Walk me through the weekly reports you'd use to run an excavation and site work company, from backlog to equipment hours.
Technical · Running by the numbers
- Strong answer
- Names backlog, job cost against budget, equipment utilization, receivables aging, cash, bid hit rate, and safety reports, and explains what action each would trigger.
- Red flags
- Looks only at revenue or the bank balance.
Your best foreman says a competitor offered more pay. What do you do?
Situational · Keeping key people
- Strong answer
- Finds out what really matters to them, checks your pay against the market, weighs the cost of losing them, and decides within a fair pay structure.
- Red flags
- Matches any offer on the spot or lets them walk without a conversation.
Tell me about a time you turned down work that looked profitable on paper.
Behavioral · Saying no to bad work
- Strong answer
- Explains the risk they saw, such as contract terms, payment history or crew capacity, and what happened as a result.
- Red flags
- Has never turned down work.
Tell me about a time the shop and the field kept clashing over equipment, like machines going out unready or coming back damaged.
Behavioral · Resolving department conflict
- Strong answer
- Got both leads together, looked at repair and downtime records, set clear handoff rules such as a walkaround sign-off and damage reports, named one owner, and checked it stuck.
- Red flags
- Let them sort it out or picked a side without hearing both.
Tell me about a serious incident or near miss that happened under your leadership and what changed afterward.
Behavioral · Learning from incidents
- Strong answer
- Describes the investigation, the root cause beyond the person involved, and a lasting change they made.
- Red flags
- Treats it as one person's mistake with nothing else to fix.
Work exercise: Review a monthly report
Give finalists a made-up monthly report: revenue, three jobs over budget, utilization by machine, receivables aging, and one recordable injury. Ask them to pick the three problems they would tackle first and explain the plan as they would to the owner in [30] minutes.
Field Supervisor
6 questions · Run a sample morning
As the competent person on site, walk me through your inspection of an open trench before the crew goes in each morning.
Technical · Daily trench inspection
- Strong answer
- Checks soil type and cracks, water, spoil and equipment back from the edge, the protective system's condition, ladders, and nearby loads or vibration, writes it down, and re-inspects after rain or changes.
- Red flags
- Glances in from the truck or skips it on short jobs.
The crew is ready to dig, but traffic has torn up most of the utility marks. What do you do?
Situational · Locate marks
- Strong answer
- Doesn't dig on missing marks, requests a re-mark through the one-call center, moves the crew to other work in the meantime, and notes it in the daily report.
- Red flags
- Digs from memory of where the paint was.
The testing tech says the last lift of backfill failed the density test. What do you do next?
Situational · Compaction quality
- Strong answer
- Stops placing fill over it, checks moisture, lift thickness and material, reworks and recompacts, gets a retest, tells the project manager, and fixes the method for the next lift.
- Red flags
- Keeps filling and hopes the next test passes.
Mid-morning, the compactor breaks down and the pipe crew can't backfill. What do you do?
Situational · Handling equipment downtime
- Strong answer
- Calls for a repair or rental swap, moves the crew to other work, doesn't let anyone place thick lifts to catch up, and logs the downtime.
- Red flags
- Lets the crew dump fill in without compacting it.
Tell me about a time you stopped work for a safety problem when the schedule was tight.
Behavioral · Stopping work for safety
- Strong answer
- Explains the hazard, how they stopped the work, how they fixed it, and how they told the project manager and customer.
- Red flags
- Has never stopped work or let it go because of the deadline.
Tell me about a time a crew member kept breaking a safety rule, like skipping the trench ladder or walking into a machine's swing radius.
Behavioral · Enforcing rules on the crew
- Strong answer
- Corrected it on the spot, found out why it kept happening, followed company discipline steps, and documented each talk.
- Red flags
- Ignored it because the person was a good worker.
Work exercise: Run a sample morning
Give finalists a made-up site plan, a crew list, an equipment list with one machine down, and a forecast showing rain overnight. Ask them to give the morning safety talk and assign the day's work out loud in [15] minutes, including what they would check in the trench first.
HR Manager
6 questions · Work a discipline case
You need [three] experienced operators before spring, and every contractor nearby is hiring. Walk me through your plan.
Situational · Recruiting operators
- Strong answer
- Checks pay against the market, uses referrals and trade schools, builds a path to move laborers into operating, and keeps the hiring process fast with structured interviews and seat tests.
- Red flags
- Posts an ad and waits.
Walk me through what a new field hire must complete before their first day on a site.
Technical · New hire compliance
- Strong answer
- Names I-9 and tax forms, safety orientation on trenches, struck-by hazards and silica, PPE, and for CDL drivers the license check and DOT drug and alcohol testing steps.
- Red flags
- Lists only payroll paperwork.
A foreman wants to fire a laborer today for being late several times. What do you do?
Situational · Advising on discipline
- Strong answer
- Checks the policy and past documentation, whether others were treated the same, and any leave or legal protections, then advises a consistent next step and documents it.
- Red flags
- Rubber-stamps the firing or refuses without looking at the facts.
How do you keep safety training records ready if OSHA visits a job site?
Technical · Safety training records
- Strong answer
- Keeps a training matrix by person and topic, competent person designations, sign-in sheets and certificates, refresher dates, and the OSHA 300 log current and easy to pull.
- Red flags
- Keeps records scattered or assumes the field has them.
Tell me about a time you cut turnover among equipment operators, truck drivers or laborers.
Behavioral · Retention
- Strong answer
- Used exit or stay interview data, changed something specific like onboarding, pay steps or foreman training, and measured the result.
- Red flags
- Offers only pizza parties or has no data.
Tell me about a time you investigated a complaint on a field crew, such as hazing of a new laborer or harassment by a foreman.
Behavioral · Investigating complaints
- Strong answer
- Acted quickly, interviewed everyone involved, kept it as confidential as possible, documented, protected the person who complained from retaliation, and followed through.
- Red flags
- Told people to work it out or shared details with the crew.
Work exercise: Work a discipline case
Give finalists a made-up file: an operator with two written warnings, a foreman's notes, and a recent complaint the operator filed about that foreman. Ask them to say what they would check, who they would talk to, and what they would recommend in [20] minutes.
Marketing Manager
6 questions · Move a sample budget
Walk me through how you'd get your company in front of general contractors and developers who hire site work subcontractors.
Technical · Reaching contractor buyers
- Strong answer
- Names bid lists and plan rooms, builder associations, a capabilities statement with project photos, prequalification packets, and direct outreach, and tracks which source brings bids.
- Red flags
- Plans only social media posts aimed at homeowners.
The owner wants more residential jobs like driveways, pool digs and lot clearing, but most revenue is commercial. Where do you start?
Situational · Growing a new segment
- Strong answer
- Builds separate pages and campaigns for each service, uses local search and job site signs, shows before and after photos, and tracks cost per lead and per won job.
- Red flags
- Runs one general campaign for everything.
How do you measure whether a campaign brought in profitable jobs, not just leads?
Technical · Measuring results
- Strong answer
- Tracks the lead source through the CRM to won jobs and job margin, and compares cost per won job by channel.
- Red flags
- Reports clicks and likes.
Sales says your last campaign brought in junk leads: small jobs outside your service area. What do you do?
Situational · Working with sales
- Strong answer
- Reviews the leads with sales, agrees on what a qualified lead is, then tightens geography, ad wording and form questions.
- Red flags
- Defends the campaign or blames sales for not closing.
Tell me about a marketing push for a contracting business, like a trade show, a mailer or an ad campaign, that didn't pay back.
Behavioral · Learning from failure
- Strong answer
- Gives the spend, leads and won jobs, explains why it missed (wrong audience, timing or offer), and describes the change they made and what it produced.
- Red flags
- Can't name one or blames the budget.
Tell me about a time you turned field work into marketing content.
Behavioral · Turning field work into content
- Strong answer
- Worked with crews to get photos or video safely, got customer permission, and turned it into a case study or post that brought inquiries.
- Red flags
- Used only stock photos.
Work exercise: Move a sample budget
Give finalists a made-up quarter of lead data by source: leads, won jobs, revenue and spend for [five] channels. Ask them to say where they would move budget next quarter and why in [25] minutes.
Office Manager
6 questions · Build an invoice package
Walk me through how you turn daily field tickets into accurate invoices.
Technical · Field tickets to invoices
- Strong answer
- Makes sure tickets are signed, matches equipment hours and truck loads to the contract or change order, invoices on a set schedule, and checks against purchase orders.
- Red flags
- Invoices from memory or waits until the job ends.
A general contractor rejects your pay application because lien waivers are missing. What do you do?
Situational · Pay application requirements
- Strong answer
- Gets the right waivers out the same day, resubmits, and builds a checklist of each contractor's pay application requirements.
- Red flags
- Waits for next month's cycle.
Payroll is due tomorrow and two foremen haven't turned in time cards. What do you do?
Situational · Payroll deadlines
- Strong answer
- Calls them directly, gets hours confirmed in writing, flags the issue to their manager, and sets up a fix so it doesn't keep happening.
- Red flags
- Guesses the hours or holds everyone's pay.
How do you set up project files so anyone can find a job's permit, locate ticket numbers, change orders and photos?
Technical · Project documentation
- Strong answer
- Uses the same folder structure and file names for every job, tracks expiration dates, and checks files at job start and closeout.
- Red flags
- Lets each person save things their own way.
Tell me about a time you fixed an office process that kept causing billing mistakes, such as unbilled truck hours.
Behavioral · Process improvement
- Strong answer
- Names the mistake, like unbilled truck hours or missing change orders, traces it to a step such as unsigned field tickets, changes that step, and shows fewer credits or rebills.
- Red flags
- Fixed each mistake one at a time.
Tell me about a time you had to push a field leader to turn in paperwork.
Behavioral · Getting paperwork from the field
- Strong answer
- Made it easy, explained how it affected pay or billing, stayed persistent and respectful, and escalated only when needed.
- Red flags
- Gave up or complained to others.
Work exercise: Build an invoice package
Give finalists a made-up stack: [five] field tickets, a change order, a purchase order, and a general contractor's pay application checklist. Ask them to build the invoice package and list anything missing in [20] minutes.
Operations Manager
6 questions · Rebuild a sample week
Three general contractors each say their job is the priority next week, and you have crews for two. How do you decide?
Situational · Prioritizing crews
- Strong answer
- Looks at contract dates and penalties, which sites are ready with permits, locates and staking done, margin and relationship, then tells each contractor the truth and offers options.
- Red flags
- Goes with whoever yells loudest or promises all three.
Walk me through how you judge whether a crew had a productive day.
Technical · Measuring production
- Strong answer
- Compares quantities like yards moved or feet of pipe laid to the estimate, checks idle time and truck waits, and uses it to fix the process.
- Red flags
- Judges by hours worked or how busy people looked.
A week of rain has put three jobs behind, and the forecast is clear starting Thursday. How do you plan the next week?
Situational · Recovering from weather
- Strong answer
- Starts with sites that dry fastest, won't place or compact saturated soil, adds shifts or rentals within limits, and updates each contractor early.
- Red flags
- Sends everyone back to wet sites and pushes fill that can't be compacted.
How do you keep stormwater and dust controls on track across several sites at once?
Technical · Environmental compliance
- Strong answer
- Assigns an owner per site, schedules erosion control inspections and checks after rain, keeps logs current, and audits the sites personally.
- Red flags
- Leaves it to each foreman with no follow-up.
Tell me about a process change you made that improved crew or equipment productivity on site work.
Behavioral · Improving productivity
- Strong answer
- Names the bottleneck, like trucks waiting at the excavator or a pipe crew waiting on material, the change, such as matching truck count to loading rate or staging pipe the day before, and the gain in loads or feet per day.
- Red flags
- Can't name a measurable result.
Tell me about a time you had to move a foreman out of a leadership role.
Behavioral · Removing a foreman
- Strong answer
- Gave clear feedback and time to improve, documented it, handled the change respectfully, and made sure the crew had a new leader ready.
- Red flags
- Avoided it until the crew quit, or did it without warning.
Work exercise: Rebuild a sample week
Give finalists a made-up weekly schedule: [four] crews, [six] jobs, an equipment list, one dozer down, and two rain days. Ask them to rebuild the week and say who they would call about each change in [25] minutes.
Project Manager
6 questions · Write a change notice
Walk me through what you set up before mobilizing on a site work job.
Technical · Job startup
- Strong answer
- Permits, the stormwater plan with erosion controls in first, utility locate requests, survey staking, submittals for pipe and aggregates, traffic control, and a preconstruction meeting.
- Red flags
- Sends the crew and figures out paperwork later.
Your crew hits a lot of unsuitable soil that the geotechnical report didn't show. What do you do?
Situational · Unforeseen conditions
- Strong answer
- Documents it with photos and quantities, gives written notice under the contract, gets the engineer's direction, and agrees on pricing or signed daily time-and-material tickets before doing the extra work.
- Red flags
- Digs it out and tries to bill for it at the end.
During a hard rain, the stormwater inspector finds sediment leaving the site past your silt fence. What do you do?
Situational · Stormwater compliance
- Strong answer
- Fixes the failed controls right away, records the corrective action, finds why it failed, and checks other controls on site.
- Red flags
- Waits until the rain stops or argues with the inspector.
How do you tell whether a site work job is making money while it's still going?
Technical · Tracking job profit
- Strong answer
- Compares installed quantities and equipment hours to the budget each week, updates cost to complete, and flags variances early.
- Red flags
- Waits for the final job cost report.
Tell me about a site work job that fell behind from weather, rock or late utility work, and how you got it back on schedule.
Behavioral · Schedule recovery
- Strong answer
- Names the cause, the recovery plan, such as resequencing, added machines or a second shift, how they told the general contractor, and the finish date against the original.
- Red flags
- Pushed crews harder with no plan.
Tell me about a time you disagreed with a general contractor or owner about a change order.
Behavioral · Change order disputes
- Strong answer
- Relied on the contract and documentation, stayed professional, and reached a resolution or escalated properly.
- Red flags
- Did the work without paperwork and lost the money.
Work exercise: Write a change notice
Give finalists a made-up job: plans show [400] feet of storm pipe, and the crew finds it conflicts with an unmarked water line. Ask them to write the notice to the general contractor and a rough plan for pricing and schedule impact in [30] minutes.
Sales Manager
6 questions · Forecast a sample pipeline
One of your reps wins a large grading job at a price your estimator says is below cost. What do you do?
Situational · Pricing discipline
- Strong answer
- Reviews the numbers before signing if possible, looks for scope changes, renegotiates or walks away, and coaches the rep on pricing rules.
- Red flags
- Takes the job for the revenue.
Walk me through how you review a site work estimate before it goes to a customer.
Technical · Estimate review
- Strong answer
- Checks cut and fill and pipe quantities against the plans, trucking and haul-off, rock and bad soil terms, erosion control, mobilizations, and clear inclusions and exclusions.
- Red flags
- Checks only the total.
A long-time general contractor customer pressures your team to cut the price after the bid is in. What do you do?
Situational · Holding price
- Strong answer
- Asks what's driving it, offers scope or schedule options instead of a straight cut, and knows their walk-away number.
- Red flags
- Cuts the price to keep the customer happy.
Tell me about a sales rep you coached to win more bids from general contractors without cutting price.
Behavioral · Coaching reps
- Strong answer
- Reviewed lost bids with them, found the gap (late bids, unclear exclusions, no follow-up with the contractor's estimator), set specific changes, reviewed their next bids, and tracked hit rate and margin.
- Red flags
- Told them to sharpen their pencil or make more calls.
Tell me about a time you let go of a salesperson who had strong general contractor relationships but wouldn't follow your bid review process.
Behavioral · Making tough staffing calls
- Strong answer
- Set clear expectations on bid reviews and pricing approval, documented misses and coaching, made the call when it didn't change, and personally called key contractors so the relationships stayed with the company.
- Red flags
- Kept them for the relationships, or let them go with no warning and lost the accounts.
How do you forecast sales for a company where most work is bid to general contractors?
Technical · Forecasting
- Strong answer
- Uses pipeline by stage, hit rate by customer and job type, bid volume and likely start dates, and checks the forecast against actuals.
- Red flags
- Adds up every open bid.
Work exercise: Forecast a sample pipeline
Give finalists a made-up pipeline of [ten] bids with amounts, stages and notes. Ask them to forecast next quarter, say which bids they would chase, and what coaching they would give the rep with the weakest deals in [25] minutes.
Warehouse / Equipment Manager
6 questions · Plan a sample service week
Walk me through how you build a maintenance schedule for a mixed fleet of excavators, dozers and skid steers.
Technical · Preventive maintenance planning
- Strong answer
- Sets service intervals by hours from each maker's manual, tracks hours by telematics, uses oil sampling and undercarriage checks, and plans service around the job schedule.
- Red flags
- Services machines when they break.
An excavator blows a hydraulic hose in the middle of a pipe job. Walk me through what you do.
Situational · Field breakdown response
- Strong answer
- Has it shut down with pressure relieved, gets the spill contained, sends a mechanic or hose service or swaps a machine, logs it, and checks why the hose failed.
- Red flags
- Tells the operator to keep going or has someone feel for the leak by hand.
How do you decide whether to repair a machine, replace it, or rent?
Technical · Repair, replace or rent
- Strong answer
- Compares repair cost to the machine's value and hours, downtime cost, utilization and rental rates, and brings a recommendation with numbers.
- Red flags
- Always repairs or always asks for new.
Tools keep going missing from job trailers. What do you do?
Situational · Missing tools
- Strong answer
- Sets up checkout logs by crew, tags tools, does regular counts, and works with supervisors on accountability.
- Red flags
- Keeps buying replacements.
Tell me about a time you cut maintenance or supply costs without hurting uptime.
Behavioral · Cost control
- Strong answer
- Names the change, such as vendor pricing or bulk filters, and shows uptime held.
- Red flags
- Cut costs by skipping service.
Tell me about a time you had to hold a crew or foreman accountable for equipment damage.
Behavioral · Accountability for equipment
- Strong answer
- Gathered facts first, talked directly, focused on prevention, and followed company policy.
- Red flags
- Let it slide or blamed without facts.
Work exercise: Plan a sample service week
Give finalists a made-up fleet list with hours, last service dates and three open repair orders, plus next week's job schedule. Ask them to plan which machines get serviced when, and which jobs need a rental, in [20] minutes.
Customer Service Representative
6 questions · Handle three sample calls
A homeowner calls wanting a pool dug next week and asks if you can just come dig. Walk me through the call.
Situational · Taking a new job inquiry
- Strong answer
- Collects the address, scope and access for equipment, explains that permits and utility locates come first, books an estimator visit, and gives an honest idea of lead time.
- Red flags
- Promises next week to win the job or quotes a price without a site visit.
A neighbor of one of your job sites calls angry that your trucks tracked mud onto the street and blocked a driveway. What do you do?
Situational · Handling neighbor complaints
- Strong answer
- Listens, apologizes, gets the address and details, calls the field supervisor right away to clean the street and move trucks, and calls the neighbor back to confirm it's fixed.
- Red flags
- Argues that it's a construction site, or takes a message and doesn't follow up.
A customer calls asking why the crew didn't show. Dispatch tells you the machine was pulled to an emergency job. What do you tell the customer?
Situational · Schedule changes
- Strong answer
- Tells the truth, apologizes, gets a firm new date from dispatch before promising one, and notes the change and the promise in the CRM.
- Red flags
- Makes up an excuse or gives a new date without checking.
Walk me through how you log a customer call in a CRM so someone else can pick it up the next day.
Technical · CRM records
- Strong answer
- Records who called, the job, what was asked, what was promised, the next step, who owns it, and when it's due.
- Red flags
- Writes vague notes like called about job or keeps details in their head.
Tell me about a time you had to explain a charge or delay a customer didn't expect, like an extra haul-off or a permit hold-up.
Behavioral · Delivering bad news
- Strong answer
- Got the facts from the project manager first, explained in plain words why it happened, pointed to the contract or paperwork, offered a call with the manager, and followed up when promised.
- Red flags
- Guessed at the reason, blamed another department or avoided the call.
Tell me about a time you caught a mistake in an order or appointment before it caused a problem.
Behavioral · Catching errors
- Strong answer
- Describes a habit like reading back details or checking addresses, what they caught, and how they fixed it.
- Red flags
- Can't recall one or relies on others to catch mistakes.
Work exercise: Handle three sample calls
Role-play three made-up calls in [15] minutes: a homeowner asking about a new septic system, an upset neighbor about dust, and a general contractor wanting a grading quote by Friday. Ask the candidate to log each call in a sample CRM form with the next step and owner.
Dispatcher
6 questions · Plan tomorrow's moves
It's [6 a.m.]. A lowboy driver calls in sick, and an excavator must be on a site across town by [8 a.m.]. What do you do?
Situational · Covering a missing driver
- Strong answer
- Checks which other drivers hold the right license and are available, calls an outside hauler if needed, tells the foreman the real arrival time, and never sends an unlicensed driver.
- Red flags
- Sends whoever is free or doesn't tell the site the machine will be late.
At noon a foreman says they hit rock and need a hydraulic breaker today. Both of your breakers are booked. What do you do?
Situational · Changing equipment needs
- Strong answer
- Checks whether a booked breaker can move without delaying its job, prices a rental, brings the tradeoff to the operations manager, and updates the board and both foremen.
- Red flags
- Pulls a breaker from another job without telling anyone.
Walk me through what you check before you send a machine out to a job.
Technical · Checking readiness before dispatch
- Strong answer
- Checks open repair orders and service due, the right bucket or attachment, fuel, the trailer and tie-downs, and whether the load needs an oversize permit or route plan.
- Red flags
- Assumes the yard keeps machines ready.
How do you keep track of where every machine and attachment is at the end of each day?
Technical · Tracking equipment
- Strong answer
- Updates the board or software as moves happen, checks GPS or telematics, and confirms with foremen at day's end.
- Red flags
- Relies on memory or finds out when someone can't find a machine.
Tell me about a time a foreman pushed back hard on an equipment or schedule call you made.
Behavioral · Saying no to the field
- Strong answer
- Explained what the other jobs needed and why, offered the next available machine or a rental with a time, stayed calm, and took real tradeoffs to the operations manager.
- Red flags
- Caved to the loudest person or avoided the conversation.
Tell me about a time a scheduling mistake you made caused a problem. What did you change?
Behavioral · Learning from mistakes
- Strong answer
- Owns the mistake, explains the fix in the moment, and names a check they added afterward.
- Red flags
- Says they don't make scheduling mistakes or blames the field.
Work exercise: Plan tomorrow's moves
Give finalists a made-up board: [five] job sites, [three] excavators, a dozer, two lowboys, one driver out, and rain forecast for the afternoon. Ask them to plan tomorrow's equipment moves and say what they would tell each foreman in [20] minutes.
Bookkeeper
6 questions · Close a sample month
A fuel delivery bill, a hydraulic parts invoice and an excavator rental invoice land on your desk. Walk me through how you code each one so job costs come out right.
Technical · Job cost coding
- Strong answer
- Codes each to the right job, cost code and machine number, separates job costs from shop overhead, and gets a manager's approval before entering anything that isn't clearly tied to a job.
- Red flags
- Puts everything in one expense account or guesses the job instead of asking.
Walk me through how you record a progress payment from a general contractor that holds back retainage.
Technical · Retainage and progress billing
- Strong answer
- Records the full billed amount, books the held amount as retainage receivable by job, tracks when each job's retainage can be billed, and follows up at closeout.
- Red flags
- Records only the cash received and loses track of the retainage owed.
The fuel card statement shows more fuel than the tickets turned in from the field. What do you do?
Situational · Reconciling fuel cards
- Strong answer
- Matches charges to tickets by card, date and machine, lists the unmatched charges, asks the card holders and their supervisor, and reports possible misuse to management with the facts.
- Red flags
- Plugs the difference into fuel expense or accuses someone before checking the records.
A stone supplier calls to say they'll stop deliveries because an invoice is past due. The project manager never approved it. What do you do?
Situational · Vendor payables
- Strong answer
- Pulls the invoice and delivery tickets, gets the project manager to approve or dispute it the same day, tells the supplier a real payment date, and fixes the approval routing.
- Red flags
- Pays it without approval to make the call stop, or tells the supplier it isn't their problem.
Tell me about a time you found a mistake in numbers you had already sent to a manager, such as a job cost or payables report.
Behavioral · Accuracy and ownership
- Strong answer
- Flagged it quickly, explained the impact, sent corrected numbers, and changed a step in their process so it wouldn't happen again.
- Red flags
- Hoped no one noticed or blamed the software.
Tell me about a time you collected an overdue payment from a customer without hurting the relationship.
Behavioral · Collections
- Strong answer
- Checked the invoice was correct and complete first, reached the person who approves payment, agreed on a date in writing, and followed up on that date.
- Red flags
- Sent repeated form letters with no follow-up, or got into an argument with the customer.
Work exercise: Close a sample month
Give finalists a made-up month: a bank statement, a ledger, [ten] vendor invoices (one duplicate, one coded to the wrong job), a fuel card statement, and a general contractor payment net of retainage. Ask them to reconcile, recode, and list the questions they would send the project manager in [25] minutes.
Inventory Specialist
6 questions · Find the problems in a sample log
Walk me through how you'd track fuel for machines spread across several job sites.
Technical · Fuel tracking
- Strong answer
- Logs every fill by machine and hour meter, matches fuel truck and card records to deliveries, compares fuel burned per hour across machines, and flags outliers for leaks or misuse.
- Red flags
- Tracks only the total fuel bill.
The system shows six hydraulic filters for your excavators, but the shelf has two. What do you do?
Situational · Count discrepancies
- Strong answer
- Recounts, checks recent work orders and checkouts, finds where the record broke down, corrects it with a note, and reorders if needed.
- Red flags
- Changes the number to match and moves on.
A mechanic needs a part to get a down dozer running, and your usual vendor says it's a week out. What do you do?
Situational · Expediting a critical part
- Strong answer
- Calls other dealers and suppliers, asks about rebuilt or faster shipping, and tells operations the likely downtime so they can rent a machine.
- Red flags
- Accepts the week and doesn't tell anyone.
How do you set reorder points for wear parts like bucket teeth and cutting edges?
Technical · Reorder points
- Strong answer
- Uses past usage, vendor lead time and upcoming jobs, such as rock work, sets minimums and maximums, and reviews them as work changes.
- Red flags
- Orders when the bin is empty.
Tell me about a time you worked with mechanics to have the right parts on hand before a big service or a rock job.
Behavioral · Working with the shop
- Strong answer
- Reviewed the service schedule and upcoming jobs with the shop, pre-staged filter kits and wear parts by machine, and cut the time mechanics or crews waited on parts.
- Red flags
- Waits for mechanics to ask, then orders.
Tell me about a time you had to get people to follow a checkout or logging process they didn't like.
Behavioral · Getting crews to follow process
- Strong answer
- Made the process simple, explained why it mattered to them, got a supervisor's support, and followed up.
- Red flags
- Gave up or complained without trying to fix it.
Work exercise: Find the problems in a sample log
Give finalists a made-up fuel and parts log for [four] machines over two weeks: one machine burns far more fuel per hour than the others, and one parts count doesn't add up. Ask them to find the problems and say what they would check first in [20] minutes.
Sales Representative
6 questions · Scope a sample job
Walk me through a site visit for a homeowner who wants a new gravel driveway and a soggy side yard fixed.
Technical · Scoping a site visit
- Strong answer
- Measures, looks at slope and where water goes, checks soil, truck and machine access, utilities, septic and trees, asks about permits, budget and timing.
- Red flags
- Gives a price from the truck.
A customer asks why your price is higher than another excavator's. What do you say?
Situational · Handling price objections
- Strong answer
- Compares scope line by line, such as base depth, compaction, haul-off and erosion control, without trashing the competitor, and offers scope options rather than a cut.
- Red flags
- Drops the price right away or bad-mouths the competitor.
A customer asks you to skip the permit to save money. What do you do?
Situational · Integrity under pressure
- Strong answer
- Explains plainly why the company won't, the risks to the customer, and what the permit costs and takes, and is ready to lose the job.
- Red flags
- Agrees to look the other way.
How do you explain exclusions like rock or bad soil so the customer isn't surprised later?
Technical · Explaining exclusions
- Strong answer
- Puts them in writing in plain words, explains how extra work is priced, and walks the customer through it before signing.
- Red flags
- Leaves it in the fine print.
Tell me about a time you followed up on an estimate that had gone quiet and won the job.
Behavioral · Follow-up
- Strong answer
- Describes a planned follow-up, a useful reason to call, and what made the customer decide.
- Red flags
- Sent the estimate and never called.
Tell me about a time you promised a customer something and had to work with the crew to deliver it.
Behavioral · Handing off to the field
- Strong answer
- Wrote the promise into the handoff, checked with the crew before the start, and followed up with the customer.
- Red flags
- Made promises the crew didn't know about.
Work exercise: Scope a sample job
Give finalists a made-up homeowner request with a site sketch: a driveway extension, a wet side yard and a narrow gate. Ask them to write the scope, exclusions, and the questions they would ask before pricing in [25] minutes.
Equipment Operator
7 questions · Read stakes and run a seat test
Walk me through your walkaround on an excavator before you start digging for the day.
Technical · Pre-shift walkaround
- Strong answer
- Checks fluid levels, looks for leaks and worn hoses, checks tracks, pins and bucket teeth, confirms the quick coupler is locked, tests the horn, alarm, lights and seat belt, and writes up defects.
- Red flags
- Starts it up and lets it warm up, or says the mechanic handles that.
The locate marks show a gas line crossing the trench you're about to dig. Walk me through how you get across it.
Situational · Digging near located utilities
- Strong answer
- Confirms the marks match the ticket, stops machine digging inside the tolerance zone, has the line exposed by hand or vacuum, digs only once it can be seen, and stops if marks are missing or wrong.
- Red flags
- Trusts the paint and digs carefully with the bucket, or guesses the depth.
Your bucket snags an unmarked line and you smell gas. What do you do?
Situational · Utility strike response
- Strong answer
- Gets off the machine and moves everyone away and upwind without creating sparks, calls 911 and the gas company from a safe distance, tells the supervisor, and doesn't try to fix or bury it.
- Red flags
- Keeps working, tries to plug or cover the line, or only calls the boss.
You're digging a sewer trench deep enough to need a trench box. Walk me through how you dig and set the box so the pipe crew is safe.
Technical · Trench protection
- Strong answer
- Keeps the pipe crew inside the box, keeps spoil back from the edge, sets and moves the box with no one inside, and makes sure there's a ladder before anyone goes in.
- Red flags
- Lets people in before the box is set or piles spoil at the trench edge.
How do you check grade while you're cutting a building pad, and how do you know you're on?
Technical · Working to grade
- Strong answer
- Reads the stakes for cut and fill, uses a laser receiver or machine GPS, has someone check with a rod, cuts slightly high and finishes carefully, and avoids overcutting.
- Red flags
- Eyeballs it or digs deep and fills back without compacting.
Tell me about a time you were told to dig, lift or swing a load in a way you thought was unsafe.
Behavioral · Speaking up about safety
- Strong answer
- Stopped, explained the concern, offered a safer way, and went to the supervisor if needed.
- Red flags
- Did it anyway because they were told to.
Tell me about a time a machine you were running broke down or you damaged something on a job.
Behavioral · Owning breakdowns and damage
- Strong answer
- Stopped and reported it right away, explained what happened honestly, and describes what they changed afterward.
- Red flags
- Kept running a damaged machine, hid the damage, or blamed others.
Work exercise: Read stakes and run a seat test
Give finalists a made-up site plan and photos of [three] grade stakes with cut and fill marks. Ask them to explain the cut at each stake and their digging order in [15] minutes. Where your safety rules and insurance allow, add a short supervised seat test in a cleared, located area of your yard: walkaround, then level a small pad to a laser in [20] minutes.
Laborer / Helper
6 questions · Read stakes and learn the signals
The excavator is digging and you need to check the depth in the trench. Walk me through how you do it safely.
Situational · Working around running equipment
- Strong answer
- Gets the operator's attention and a stop signal, stays out of the swing radius, checks from outside the trench with a rod if possible, and enters only a protected trench by the ladder with the bucket stopped.
- Red flags
- Walks in behind the machine without signaling or climbs into an unprotected trench.
It's your first week. A coworker waves you into a trench to grab a tool, but the trench box isn't set yet. What do you do?
Situational · Refusing unsafe entry
- Strong answer
- Says no politely, explains that the walls can collapse, waits for the box or asks the supervisor.
- Red flags
- Goes in quickly because it'll only take a second.
You're hand digging near a yellow paint mark and your shovel hits something hard. What do you do?
Situational · Hand digging near utilities
- Strong answer
- Stops, doesn't pry or strike it again, tells the supervisor, and uncovers it gently by hand only as directed; if it's damaged or smells like gas, gets everyone back.
- Red flags
- Keeps digging around it or pries at it.
Walk me through what a grade stake tells you and how you'd check whether the ground is at grade.
Technical · Reading grade stakes
- Strong answer
- Knows a stake shows a cut or fill from a reference point and how to check with a laser rod or string line, or says how they'd learn and asks before guessing.
- Red flags
- Guesses and doesn't ask.
This job starts at [7 a.m.] on sites that change every few weeks. Tell me about a time at work, school or volunteering when you had to be on time somewhere new.
Behavioral · Reliability
- Strong answer
- Gives an example of planning ahead, such as checking the route the night before, and shows they understand the crew can't start without them.
- Red flags
- Treats being late as no big deal.
Tell me about a time at work, school or volunteering when you questioned an instruction because it didn't seem safe.
Behavioral · Questioning unsafe instructions
- Strong answer
- Describes what they were asked to do and why it worried them, calmly asked for a safer way or checked with a supervisor, didn't just go along, and says how it was resolved.
- Red flags
- Did it anyway because they were told to, or argued and walked off.
Work exercise: Read stakes and learn the signals
In your yard, set up [three] made-up grade stakes with cut and fill marks and a laser and rod. Teach the candidate how to read them and two of your hand signals, then ask them to check the ground at each stake and use the signals in [15] minutes. Follow your safety rules and keep running equipment out of the area.
Lead Equipment Operator
7 questions · Plan a pad and a pipe run
Tell me about a newer operator you trained and how you decided they were ready to run a machine alone.
Behavioral · Training operators
- Strong answer
- Trained in steps, from walkaround to simple tasks to harder digging, watched them work, and used clear sign-off points before letting them run alone.
- Red flags
- Put them in the seat and left, or never let them run anything.
A newer operator is digging closer to a marked water main than you'd like. What do you do?
Situational · Correcting a trainee in the moment
- Strong answer
- Stops them by radio or signal right away, explains why, has the line exposed by hand, and coaches afterward instead of yelling.
- Red flags
- Lets it go to avoid embarrassing them or takes over without explaining.
Walk me through how you'd sequence mass excavation, utility trenches and backfill on a building pad so machines aren't in each other's way.
Technical · Sequencing the work
- Strong answer
- Plans haul routes and spoil areas, puts deeper lines in before shallower ones that cross them, backfills and compacts in lifts with tests before moving on, and keeps machines out of each other's swing.
- Red flags
- Digs wherever is easiest first and fixes conflicts later.
Walk me through how the choice between a trench box, sloping or benching gets made on your jobs.
Technical · Choosing trench protection
- Strong answer
- Says the competent person decides based on depth, soil type, water and nearby loads, uses the box maker's data, and knows deep trenches need an engineer's design.
- Red flags
- Decides by feel or only protects trenches when an inspector might show up.
It rained overnight. The trench you dug yesterday has water in it and the walls are sloughing. The pipe crew wants to get in. What do you do?
Situational · Conditions after rain
- Strong answer
- Keeps everyone out until the competent person re-inspects, pumps the water, re-slopes or resets the box, and treats the soil as weaker than before.
- Red flags
- Lets them in because it looked fine yesterday.
Tell me about a time you had to correct an operator who had been running equipment longer than you.
Behavioral · Leading experienced operators
- Strong answer
- Talked privately and respectfully, focused on the specific behavior and why it mattered, and followed up.
- Red flags
- Avoided it or embarrassed them in front of the crew.
Tell me about a time you caught a machine problem early, before it became a breakdown.
Behavioral · Catching problems early
- Strong answer
- Names a specific sign, like a new noise, slow hydraulics or a leak, explains how they reported it, and what was saved.
- Red flags
- Ran machines until they broke.
Work exercise: Plan a pad and a pipe run
Give finalists a made-up site plan with a building pad and sewer, water and storm lines. Ask them to plan the day for two operators and a laborer in [20] minutes: dig order, spoil areas, trench protection, and what they would check before anyone enters a trench. Where your safety rules and insurance allow, add a short supervised seat test in a cleared, located area of your yard.
Start Hiring Now.
Tell us who you need to hire. Compare plans, then work with HireBus to set up your first role.

We're tracking to rapidly onboard 6 or 7 technicians with only 2 months left in the season.Michael & Brittany Parker, Master Pro Service
Plan details, setup costs, and advertising spend · See pricing