General contractor interview questions

127 interview questions for the 21 roles a $20M business in this industry hires for, from leadership to the field. Each role has job-related questions, what strong and weak answers sound like, and a short work exercise.

21 roles. Open one to see its questions, or open them all.

Chief Executive Officer

6 questions · Weigh a big contract
Job description
  1. A developer offers your company a contract to build [12] homes, bigger than anything you've done. How do you decide?

    Situational · Taking on bigger projects

    Strong answer
    Checks cash and bonding needs, PM and supervisor capacity, sub availability, contract risk and the effect on current clients, and negotiates a phased start if possible.
    Red flags
    Signs because it's a big step up.
  2. A past client's detailed complaint about your company spreads widely online. What do you do?

    Situational · Reputation crises

    Strong answer
    Learns the facts, reaches out to the client directly, fixes what's fair, responds publicly with calm facts, and fixes the process behind it.
    Red flags
    Attacks the client publicly or ignores it.
  3. Walk me through how you'd set a [3]-year plan for a general contracting company.

    Technical · Strategic planning

    Strong answer
    Picks target project types and size, sets revenue and margin goals, plans leaders, crews and subs needed, cash and systems, and reviews progress quarterly.
    Red flags
    Sets a revenue number and hopes.
  4. You learn crews skip fall protection when no supervisor is around. What do you do?

    Situational · Field safety culture

    Strong answer
    Makes it a company-wide priority, holds supervisors accountable, makes compliance easy with gear and planning, does unannounced site checks, and applies consequences consistently.
    Red flags
    Sends a reminder.
  5. Tell me about a time you hired an estimator or preconstruction leader to fix bids that kept losing money in the field.

    Behavioral · Hiring estimating leadership

    Strong answer
    Defined the problem with numbers like estimate-to-actual fade, tested candidates by having them price a sample remodel, handed off in stages, and shows the change in margin fade or win rate.
    Red flags
    Can't name one, or hired on loyalty or a résumé without testing estimating skill.
  6. Tell me about a remodel or build you turned down even though you had room in the schedule.

    Behavioral · Saying no

    Strong answer
    Names the project, the risk they saw (tight schedule, poor client fit, thin margin, cash), how they made and explained the call, and what happened to whoever took it.
    Red flags
    Has never turned down work.

Work exercise: Weigh a big contract

Give finalists a made-up company summary with [2] years of results, current backlog and the developer's [12]-home offer with key terms. Ask them to recommend whether to take it, under what conditions, and with what risks. Allow [20] minutes to present.

Chief Operating Officer

6 questions · Write an operations plan
Job description
  1. Walk me through the standard process you'd want every project to follow, from contract to warranty.

    Technical · Standard project process

    Strong answer
    Pre-construction review, permits, selections and long-lead orders, schedule, sub contracts, kickoff, inspections, pre-drywall walk, change orders, punch, closeout and warranty follow-up, each with an owner.
    Red flags
    Leaves each PM to run jobs their own way.
  2. The company wants to double the number of projects in two years. What do you put in place first?

    Situational · Scaling the company

    Strong answer
    Develops PMs and lead carpenters, builds a sub bench, standardizes processes and software, and plans cash with finance before adding volume.
    Red flags
    Sells more and hires as it goes.
  3. A homeowner's child wanders into an open demo area on one of your occupied-home remodels. No one is hurt. What do you do?

    Situational · Protecting occupants on remodels

    Strong answer
    Confirms the child is safe, closes the area with secure barriers, checks every occupied-home job for the same gap, sets a standard for securing work areas daily and covering it with families at kickoff, and follows up with site checks.
    Red flags
    Treats it as the family's problem, or fixes only that one site.
  4. Good subcontractors are booked solid and schedules are slipping. What do you do?

    Situational · Short sub capacity

    Strong answer
    Builds relationships with new subs and vets them, pays on time to stay a priority, self-performs where it makes sense, and gives clients honest timelines.
    Red flags
    Uses whoever is available without vetting.
  5. Tell me about a time you cut delays from late selections, sub no-shows or failed inspections across your remodels.

    Behavioral · Improving on-time completion

    Strong answer
    Found which causes mattered most, changed the process, such as selection deadlines in contracts or pre-inspection checklists, and shows on-time completion improving.
    Red flags
    Pushed crews to work faster without fixing the causes.
  6. Tell me about a project manager whose remodels kept losing money because changes weren't written up and billed.

    Behavioral · Handling struggling project managers

    Strong answer
    Reviewed the job data with them, set clear expectations and a dated plan, coached through weekly job reviews, documented, made a timely decision and had a plan to cover their clients.
    Red flags
    Avoided it for months, or let them go with no coaching and no plan for their projects.

Work exercise: Write an operations plan

Give finalists a made-up dashboard: [10] active projects with schedule status, budget variance, inspection results and callbacks. Ask them to pick the [3] biggest problems and write a quarter-long plan with owners and measures. Allow [30] minutes.

Chief Financial Officer

6 questions · Find the problem jobs
Job description
  1. Walk me through how you'd track profitability on remodels that last several months.

    Technical · Long-project profitability

    Strong answer
    Tracks budget by cost code, committed costs, actuals and forecast to finish, includes change orders and allowance overages, and reviews over- and under-billing monthly.
    Red flags
    Waits for the job to finish to see if it made money.
  2. Client progress payments are running behind what you owe subs and suppliers. What do you do?

    Situational · Matching payments to costs

    Strong answer
    Sets draw schedules ahead of costs, enforces payment terms, follows state rules on deposits, and plans the credit line.
    Red flags
    Delays paying subs.
  3. Walk me through how you'd manage insurance and risk for a GC that uses many subcontractors.

    Technical · Managing insurance and risk

    Strong answer
    Tracks sub certificates with additional insured wording and current workers' comp before they start, so uninsured subs don't add to the premium audit, carries builder's risk where needed, reviews indemnity terms and collects lien waivers.
    Red flags
    Assumes subs are covered.
  4. Material prices swing between the time a contract is signed and the time you buy. What do you do?

    Situational · Material price swings

    Strong answer
    Uses escalation clauses or allowances, locks in quotes early, carries contingency, and tracks price risk on open jobs.
    Red flags
    Absorbs every increase.
  5. Tell me about a report you built that showed PMs which remodels were fading in margin while there was still time to act.

    Behavioral · Building job profit reporting

    Strong answer
    Names the report, such as a weekly cost-to-complete by job, what decisions it changed, and how they kept it simple enough for PMs to use.
    Red flags
    Built reports no one read.
  6. Tell me about a time you told owners that a big project they were proud of had actually lost money.

    Behavioral · Hard conversations

    Strong answer
    Brought clear numbers, said the hard thing directly, offered options, and explains what the owners decided.
    Red flags
    Avoided it or softened the numbers.

Work exercise: Find the problem jobs

Give finalists made-up data for [6] active remodels: contract value with change orders, budget by cost code, costs to date, billings and percent complete. Ask them to flag at-risk jobs and explain the cash picture. Allow [30] minutes.

General Manager

6 questions · Review the projects
Job description
  1. Projects are finishing late and margins are shrinking. What do you do?

    Situational · Late projects and shrinking margins

    Strong answer
    Reviews each project's schedule and budget, finds common causes such as late selections, sub delays or unbilled changes, fixes the process and tracks it.
    Red flags
    Pushes crews to work faster.
  2. Walk me through how you'd decide which projects to take when demand is strong.

    Technical · Choosing projects

    Strong answer
    Weighs margin, fit with crew skills, client expectations, schedule capacity, risk and the long-term value of the client.
    Red flags
    Takes the biggest projects first.
  3. A client threatens to withhold final payment and complain to the licensing board. What do you do?

    Situational · Serious client disputes

    Strong answer
    Meets the client, reviews the contract, changes and punch list, fixes legitimate issues, documents everything, and gets advice if it escalates.
    Red flags
    Threatens to file a lien right away.
  4. Your jobs are failing inspections more often this quarter. What do you do?

    Situational · Failing inspections

    Strong answer
    Reviews each failure, finds patterns, adds pre-inspection checklists and training, and holds supervisors to them.
    Red flags
    Blames the inspectors without looking at the failures.
  5. Tell me about a time you built a bench so the company didn't depend on one or two lead carpenters.

    Behavioral · Building the field leadership bench

    Strong answer
    Named the risk, picked carpenters with potential, paired them with leads on real jobs, set a skills path (reading plans, running subs, client walk-throughs), checked readiness and names who stepped up.
    Red flags
    Still depends on the same few people, or says they just hire experienced leads.
  6. Tell me about a time you fixed how allowances were set or tracked because they kept costing the company money.

    Behavioral · Fixing allowances

    Strong answer
    Found allowances set too low or overages not billed, set them from real supplier quotes, tracked selections against them, billed overages by signed change order before ordering, and shows the margin gain.
    Red flags
    Blamed clients for picking expensive items, or can't connect a change to margin.

Work exercise: Review the projects

Give finalists a made-up report on [8] active projects with schedule, budget, change orders and inspection results. Ask them to flag the projects in trouble, name likely causes and set [3] actions. Allow [30] minutes.

Field Supervisor

6 questions · Walk a site from photos
Job description
  1. Walk me through your safety walk when you arrive at a residential remodel.

    Technical · Site safety walks

    Strong answer
    Checks floor and stair openings, ladders and scaffolds, temporary power and cords, housekeeping, PPE, tool guards, fire extinguisher, dust and lead-safe controls, and protection for the family and public.
    Red flags
    Looks around quickly and starts talking schedule.
  2. A roofing subcontractor's crew is working without fall protection on your job. What do you do?

    Situational · Sub safety on your site

    Strong answer
    Stops the work until they comply, notifies the sub's owner and the PM, documents it, and makes clear the rules apply to everyone on site.
    Red flags
    Says it's the sub's problem.
  3. Two of your three sites fall behind in the same week. What do you do?

    Situational · Juggling sites

    Strong answer
    Finds the cause on each, re-plans with the PM, moves help where it matters most, and gives clients honest updates.
    Red flags
    Splits time evenly and hopes.
  4. Walk me through how you get a room addition ready for its final inspection.

    Technical · Final inspection readiness

    Strong answer
    Confirms every trade final passed in the order your AHJ requires, checks life-safety items like smoke and CO alarms, guards, handrails and egress, has the permit card and approved plans on site, and walks it first with a checklist.
    Red flags
    Calls for the final when the crew says it's done and learns what's missing from the inspector.
  5. Tell me about a time you told an experienced carpenter their trim or framing work wasn't up to standard.

    Behavioral · Giving tough feedback

    Strong answer
    Was specific and respectful, showed the problem, set the standard, and followed up.
    Red flags
    Avoided it because the worker was experienced.
  6. Tell me about a time your dated photos and notes on a remodel settled a dispute with a client, sub or insurer.

    Behavioral · Documenting incidents

    Strong answer
    Took dated photos and notes the same day, such as damage by another trade or an injury, and those records settled a dispute, claim or back-charge.
    Red flags
    Doesn't keep records.

Work exercise: Walk a site from photos

Give finalists photos of a made-up remodel with [6] safety and quality problems, such as an open stair, a damaged cord, a missing joist hanger and a dry-swept dusty floor in an older home. Ask them to write the site report and corrective actions. Allow [25] minutes.

HR Manager

6 questions · Fix an interview process
Job description
  1. Walk me through how you'd build a safety training program for a general contractor's field crews.

    Technical · Building a safety training program

    Strong answer
    Covers OSHA 10 for field staff, fall protection, ladders and scaffolds, silica and lead-safe work, tool safety, regular toolbox talks, and records of who completed what.
    Red flags
    Hands out a safety manual.
  2. You win [3] big projects starting in the same month and need [6] more carpenters. What do you do?

    Situational · Project-based hiring

    Strong answer
    Starts recruiting right away through referrals, schools and trade groups, uses structured interviews and skills tests, and onboards fast with safety first.
    Red flags
    Waits until the projects start.
  3. A carpenter is injured on the job and will be out for several weeks. What do you do?

    Situational · Handling injuries

    Strong answer
    Makes sure they get care, reports and handles the workers' comp claim, stays in touch, offers modified duty if the doctor allows, keeps medical details confidential and makes sure no one penalizes them for reporting.
    Red flags
    Waits for the worker to call.
  4. You learn a superintendent asks candidates whether they have kids and where their family is from. What do you do?

    Situational · Fixing unlawful interview habits

    Strong answer
    Stops it right away, explains the legal risk, trains managers on lawful job-related questions, and moves the team to structured interviews.
    Red flags
    Lets it go because the superintendent means well.
  5. Tell me about a time workers complained that a lead carpenter's way of correcting people, like yelling or put-downs in front of the crew, was a problem.

    Behavioral · Resolving field conduct problems

    Strong answer
    Took it seriously, heard both sides, focused on behavior, set clear expectations with the lead, offered coaching, documented it, protected those who complained from retaliation and followed up.
    Red flags
    Wrote it off as normal for job sites, or let the supervisor handle it with no follow-up.
  6. Tell me about a time you updated policies after a law changed, such as a new state paid-leave rule or a safety standard affecting field crews.

    Behavioral · Keeping policies current

    Strong answer
    Explains how they learned of the change, updated policy, trained people and checked compliance.
    Red flags
    Waited for an employee complaint or an audit to find out.

Work exercise: Fix an interview process

Give finalists a made-up list of [10] interview questions a superintendent uses, some unlawful, plus a carpenter job description. Ask them to cut the unlawful ones and write [5] job-related replacements with rating notes. Allow [25] minutes.

Marketing Manager

6 questions · Plan for bigger projects
Job description
  1. Walk me through how you'd use finished projects to market a general contracting company.

    Technical · Marketing with finished projects

    Strong answer
    Professional photos with the client's permission, short case studies with timeline and scope, reviews, project pages, and content for people in the planning stage.
    Red flags
    Posts random job photos.
  2. Leads are plentiful, but most are for small jobs below your minimum. What do you do?

    Situational · Fixing lead fit

    Strong answer
    Changes messaging to show project types and typical ranges, adds qualifying questions to forms, and shifts spend to channels that bring bigger projects.
    Red flags
    Keeps spending to increase lead count.
  3. Remodeling sales can take months. Walk me through how you'd measure marketing when the sale closes long after the lead.

    Technical · Measuring long sales cycles

    Strong answer
    Tracks source in the CRM, measures pipeline value and closed sales by source over time, and compares groups of leads by the month they came in.
    Red flags
    Judges channels by leads this month.
  4. The owner wants ads that say 'licensed and insured' and list several awards. What do you do?

    Situational · Accurate advertising claims

    Strong answer
    Confirms the license and insurance are current, includes any license details the state requires in ads, and checks each award is real and documented.
    Red flags
    Runs it without checking.
  5. Tell me about a campaign built around one kind of project, like kitchens or additions, and what it brought in.

    Behavioral · Campaigns for target project types

    Strong answer
    Names the campaign, how they targeted it, the leads and signed projects it brought and the project sizes.
    Red flags
    Can't connect the campaign to signed projects or project size.
  6. Tell me about a time remodel leads went cold because consultations weren't booked fast enough. What did you change with sales?

    Behavioral · Speeding up lead response

    Strong answer
    Measured time to first contact and to booked consultation by source, agreed with sales on who calls and by when, sent reps the qualifying details up front, and tracked booked and signed projects after.
    Red flags
    Saw follow-up as sales' problem, or bought more leads instead of fixing response time.

Work exercise: Plan for bigger projects

Give finalists made-up data for [12] months: spend, leads, consultations, signed projects and project sizes by channel. Ask them to plan next year's marketing to bring in larger projects and say how they'll measure it. Allow [30] minutes.

Office Manager

6 questions · Bill a remodel
Job description
  1. Walk me through how you'd bill a remodel that has a deposit and progress payments.

    Technical · Progress billing

    Strong answer
    Follows the contract's payment schedule, confirms each milestone with the PM, adds approved change orders, collects sub lien waivers, and bills the final payment after punch.
    Red flags
    Bills when cash is low.
  2. A subcontractor wants payment but hasn't sent a lien waiver or an updated insurance certificate. What do you do?

    Situational · Paperwork before payment

    Strong answer
    Holds payment per policy until both arrive, tells the PM, and follows up with the sub promptly.
    Red flags
    Pays to keep the sub happy.
  3. A homeowner calls upset about a change order charge they say they never approved. What do you do?

    Situational · Change order disputes

    Strong answer
    Pulls the signed change order; if none exists, escalates to the PM and owner for a fair answer, and tightens the process so work doesn't start unsigned.
    Red flags
    Insists they pay.
  4. A PM asks you to file a permit application today, but the drawings are missing information the building department requires. What do you do?

    Situational · Permit submissions

    Strong answer
    Tells the PM what's missing, doesn't submit an incomplete package, and helps get it fixed quickly.
    Red flags
    Submits it anyway.
  5. Tell me about a time daily logs, signed change orders or delivery tickets kept arriving late from the field and held up billing.

    Behavioral · Getting field paperwork in on time

    Strong answer
    Found why, such as long forms or no deadline, made it simple with a one-page form or photo upload, set a cutoff tied to billing, followed up and brought in leadership when needed.
    Red flags
    Did the field's paperwork for them, or kept nagging with nothing changed.
  6. Tell me about a checklist or system you set up so every job file had its permit, contract and change orders.

    Behavioral · Complete job files

    Strong answer
    Describes the checklist, when it is checked, who signs off, and how many missing documents it caught.
    Red flags
    Files are complete only when someone remembers.

Work exercise: Bill a remodel

Give finalists a made-up remodel contract with a payment schedule, [3] change orders (one unsigned), and [2] sub invoices missing paperwork. Ask them to prepare the next client invoice and list what must happen before paying the subs. Allow [25] minutes.

Operations Manager

6 questions · Rebalance the projects
Job description
  1. Three remodels are over budget because crews keep waiting on late client selections and missing materials. What do you do?

    Situational · Fixing idle time from selections and materials

    Strong answer
    Confirms the pattern with PMs, sets selection deadlines tied to the schedule, orders long-lead items before start, adds a material check before each phase, applies the contract's delay terms fairly and tracks idle crew hours.
    Red flags
    Tells PMs to cut costs or blames clients without changing the process.
  2. Walk me through how you vet and onboard a new subcontractor.

    Technical · Vetting subcontractors

    Strong answer
    Checks license, insurance with additional insured and workers' compensation, references and past work, safety record, then signs a subcontract with clear scope, payment terms and lien waiver process.
    Red flags
    Hires them on a referral alone.
  3. A permit is delayed [3] weeks, and the crew was set to start Monday. What do you do?

    Situational · Permit delays

    Strong answer
    Tells the client, moves the crew to other work, follows up with the building department, and adjusts the schedule and sub dates.
    Red flags
    Starts work without the permit.
  4. Walk me through how you decide whether to do a task with your own crew or sub it out.

    Technical · Self-perform or sub out

    Strong answer
    Weighs skill and licensing (such as electrical and plumbing), capacity, cost, quality control and schedule.
    Red flags
    Does everything in-house to save money.
  5. Tell me about a time you changed how projects were handed from sales to production. What improved?

    Behavioral · Sales-to-production handoff

    Strong answer
    Added a handoff meeting or checklist covering scope, allowances, selections and client expectations, and shows fewer surprises or change disputes.
    Red flags
    Lets sales email the contract and move on.
  6. Tell me about a time you negotiated better pricing, delivery or credit terms with a lumberyard or other building supplier.

    Behavioral · Negotiating with suppliers

    Strong answer
    Came with volume and payment history, asked for specific terms (pricing, delivery, credit), and got them in writing.
    Red flags
    Accepts quoted prices.

Work exercise: Rebalance the projects

Give finalists a made-up list of [8] projects with budgets, schedule status, a permit delay and [2] subs short on capacity. Ask them to plan the next [2] weeks and list what they'd tell each client. Allow [30] minutes.

Production Manager

6 questions · Plan a production week
Job description
  1. Walk me through how you schedule crews and subs across [8] active remodels.

    Technical · Scheduling many projects

    Strong answer
    Keeps a master schedule with each project's phases, inspections and long-lead items, confirms sub dates weekly, and adjusts crews to the critical path.
    Red flags
    Schedules one job at a time.
  2. Callbacks for drywall cracks and trim gaps are rising. What do you do?

    Situational · Rising callbacks

    Strong answer
    Looks for causes such as wet framing, rushing or a weak sub, sets standards and checks, and tracks callbacks by crew and sub.
    Red flags
    Sends someone to patch each one.
  3. Your best electrical subcontractor can't take new work for [6] weeks. What do you do?

    Situational · Losing a key sub

    Strong answer
    Vets backup subs, re-sequences work, tells clients about schedule impacts, and builds a deeper bench.
    Red flags
    Waits for the sub.
  4. Walk me through the quality checks you'd set before walls get closed up on a remodel.

    Technical · Pre-drywall checks

    Strong answer
    Framing and blocking for cabinets, grab bars and TVs, rough-in locations against plans, insulation, passed inspections, photos of every wall, and a client walk-through.
    Red flags
    Lets drywall start once inspections pass.
  5. Tell me about a time you tightened sub sequencing so remodel crews stopped losing days between trades.

    Behavioral · Raising productivity

    Strong answer
    Names the change, such as confirming sub dates weekly or staging materials before each trade, and shows days or hours saved per project.
    Red flags
    Asked crews to work harder.
  6. Tell me about a time you stopped using a subcontractor whose callbacks or no-shows kept hurting remodels.

    Behavioral · Ending sub relationships

    Strong answer
    Documented the issues, gave chances, ended it professionally and protected the clients.
    Red flags
    Kept using them to avoid conflict.

Work exercise: Plan a production week

Give finalists a made-up week: [8] remodels at different phases, [4] crews, [5] subs with limited dates, [3] inspections and one late cabinet delivery. Ask them to build the schedule and explain trade-offs. Allow [30] minutes.

Project Manager

7 questions · Plan a kitchen remodel
Job description
  1. Walk me through how you build the schedule for a kitchen remodel, from demo to final inspection.

    Technical · Building a remodel schedule

    Strong answer
    Orders long-lead items like cabinets and windows first, sequences demo, rough-ins and inspections, insulation and drywall, cabinets, countertop templating after cabinets are set, tile, finishes and punch, with sub dates confirmed.
    Red flags
    Lists trades in order with no lead times, inspections or countertop fabrication time.
  2. Before demo starts in an older home, walk me through what you check and arrange.

    Technical · Pre-demo checks in older homes

    Strong answer
    Permit in hand, utilities off or protected, RRP lead-safe setup and the Renovate Right pamphlet if the home is old enough, testing of suspect asbestos materials, bearing walls confirmed, dust protection for the family and the dumpster placed.
    Red flags
    Sends the crew to start tearing out.
  3. Halfway through framing, the homeowner asks to move a wall and add a window. What do you do?

    Situational · Mid-job changes

    Strong answer
    Checks structure, header and permit impact, gets engineering if needed, prices the cost and schedule change, gets a signed change order before work, and updates subs and plans.
    Red flags
    Agrees on the spot and bills it at the end.
  4. Your plumber doesn't show for rough-in, and the inspection is booked for Thursday. What do you do?

    Situational · Sub no-shows

    Strong answer
    Calls the plumber right away, finds out when they can come, lines up a backup if needed, moves the inspection if it can't be met, tells the client, and notes it in the sub's record.
    Red flags
    Waits a day or two to see if they show.
  5. Walk me through how you track a project's budget week to week so there are no surprises at the end.

    Technical · Tracking the budget

    Strong answer
    Budget by cost code, committed costs from subs and orders, actual costs, forecast to finish, allowance tracking with overages turned into change orders, and a weekly look at contingency.
    Red flags
    Checks the total at the end of the job.
  6. Tell me about a time demo uncovered something, like rot, old wiring or an undersized beam, that changed a client's budget.

    Behavioral · Handling hidden conditions with clients

    Strong answer
    Stopped work in that area, documented it with photos, had the right sub or engineer define the fix, priced options, and got a signed change order from the client before going on.
    Red flags
    Fixed it and surprised the client on the final invoice, or covered it up.
  7. Tell me about a time a sub's work failed inspection or left a client unhappy on your project. What did you do?

    Behavioral · Holding subs accountable

    Strong answer
    Documented the problem, talked directly, used the contract terms, had the work fixed or replaced the sub, and protected the client and schedule.
    Red flags
    Fixed it with their own crew and kept using the sub.

Work exercise: Plan a kitchen remodel

Give finalists a made-up kitchen remodel: scope, budget by cost code, sub list with availability, [3] long-lead items and one homeowner change request. Ask them to build the schedule to final inspection, show the budget effect of the change, and draft the change order. Allow [45] minutes.

Sales Manager

6 questions · Review proposals
Job description
  1. Walk me through how your team turns a client's wish list into a priced proposal.

    Technical · From wish list to proposal

    Strong answer
    Site visit, scope and design, sub bids, clear allowances, contingency, margin rules, exclusions, and a review with operations before it goes out.
    Red flags
    Uses a rough price per square foot.
  2. A rep promised a client a start date and price before a PM reviewed the scope. What do you do?

    Situational · Stopping overpromises

    Strong answer
    Works with the PM to confirm what's realistic, goes back to the client honestly, and sets a rule that dates and prices need review first.
    Red flags
    Makes operations live with the promise.
  3. Clients keep wanting more than their budgets allow. What do you change?

    Situational · Budget gaps

    Strong answer
    Has reps discuss budget early, designs to budget, offers phases, and coaches reps not to lowball to win.
    Red flags
    Lets reps quote low and fix it with change orders.
  4. Walk me through how you forecast revenue when projects take months to sell and build.

    Technical · Forecasting long cycles

    Strong answer
    Tracks the pipeline by stage and likelihood, expected start dates, project length and crew capacity, and updates it monthly.
    Red flags
    Uses last year's total.
  5. Tell me about a rep you coached whose sold remodels kept losing margin once they reached production.

    Behavioral · Coaching reps on sold margin

    Strong answer
    Compared sold and actual margins by rep, found the pattern, such as missed scope, low allowances or skipped structure checks, reviewed their proposals before they went out, and shows margins holding.
    Red flags
    Looked only at close rate, or blamed production without checking the sold scope.
  6. Tell me about how you've hired remodeling salespeople who could talk about budgets honestly.

    Behavioral · Hiring sellers

    Strong answer
    Describes what they look for (honesty about budgets, construction knowledge), how they test it with role-plays, and how hires performed.
    Red flags
    Hires people they like.

Work exercise: Review proposals

Give finalists [3] made-up proposals with [4] problems, such as missing exclusions, unrealistic allowances and a promised start date. Ask them to mark the problems and coach the rep, played by you. Allow [20] minutes.

Warehouse Manager

6 questions · Plan tools and deliveries
Job description
  1. Walk me through how you'd keep track of hundreds of tools across many job sites.

    Technical · Tracking tools

    Strong answer
    Tags or barcodes tools, checks them out by crew, does regular counts, holds crews accountable, and inspects cords and guards on return.
    Red flags
    Trusts crews to bring things back.
  2. A saw comes back with a broken guard. What do you do?

    Situational · Damaged tools

    Strong answer
    Tags it out of service, arranges repair, finds out what happened, and retrains if needed.
    Red flags
    Puts it back on the shelf.
  3. Two jobs need the only delivery trailer at the same time. What do you do?

    Situational · Delivery conflicts

    Strong answer
    Checks which job is critical with the PMs, sequences runs, rents or borrows if needed, and tells both crews.
    Red flags
    First come, first served.
  4. Walk me through how you'd run cycle counts on fasteners, lumber and consumables that crews pull from the shop every day.

    Technical · Cycle counts

    Strong answer
    Counts a section on a schedule, prioritizes high-value or fast-moving items, investigates differences and fixes causes.
    Red flags
    Counts once a year.
  5. Tell me about a time you cut tool losses from remodel job sites and trailers.

    Behavioral · Reducing loss

    Strong answer
    Names the change, such as tagging tools and checking them out by crew, and the drop in losses.
    Red flags
    Accepts loss as normal.
  6. Tell me about a time several remodels started the same week and your warehouse team had to load them all.

    Behavioral · Leading through busy times

    Strong answer
    Planned loads and deliveries a day ahead, set clear priorities, split work by strength, and kept trucks leaving on time.
    Red flags
    Worked overtime alone.

Work exercise: Plan tools and deliveries

Give finalists a made-up tool list with check-out records for [5] crews, [2] tools overdue for inspection, and [6] deliveries for tomorrow with one trailer. Ask them to plan the day and flag tools to pull. Allow [20] minutes.

Customer Service Representative

6 questions · Take three calls
Job description
  1. A homeowner calls asking why no one has been at their job for [3] days. What do you do?

    Situational · Updating anxious clients

    Strong answer
    Checks the schedule for reasons such as an inspection wait or a material delay, asks the PM, and calls back with an honest answer by a set time.
    Red flags
    Guesses, or says someone will call without making sure.
  2. A caller wants someone to fix a few small things, like a sticky door and a leaky faucet. How do you handle it?

    Situational · Fitting requests to services

    Strong answer
    Knows what work the company takes, books it per policy or kindly refers the caller elsewhere.
    Red flags
    Books it without checking or brushes the caller off.
  3. Walk me through the questions you'd ask someone who wants to remodel their kitchen.

    Technical · Qualifying remodel leads

    Strong answer
    What they want to change, timeline, a comfortable budget range, home age, whether they need design help, who decides, and how they heard of the company.
    Red flags
    Name and number only.
  4. Walk me through how you'd log a customer complaint so it gets resolved.

    Technical · Logging complaints

    Strong answer
    Records the details, job, date and what the customer wants, assigns it to the right person, sets a follow-up date and closes the loop with the customer.
    Red flags
    Passes it on verbally.
  5. Tell me about a time a homeowner living through a remodel called upset about dust, noise or weeks without a working kitchen.

    Behavioral · Supporting clients living through a remodel

    Strong answer
    Listened, acknowledged the disruption, got specifics, had the PM or supervisor address dust control or the schedule, set a regular update day and followed up.
    Red flags
    Said that's just how remodels go, or avoided their calls.
  6. Tell me about a time you escalated a warranty issue on a finished remodel, like a leaking shower or cracked tile, and stayed with it until it was fixed.

    Behavioral · Following through

    Strong answer
    Gave the manager a clear summary, set a date to check back, called the customer with updates, and closed it out when fixed.
    Red flags
    Handed it off and forgot.

Work exercise: Take three calls

Role-play [3] made-up calls: a homeowner worried no one has been on site, a caller with small repairs, and someone planning a kitchen remodel. The candidate takes notes in a simple form. Allow [15] minutes, then review the notes.

Dispatcher

6 questions · Run the logistics board
Job description
  1. A crew is mid-demo and the dumpster is full, but the hauler can't swap it until Thursday. What do you do?

    Situational · Dumpster logistics

    Strong answer
    Calls other haulers, arranges a trailer run, works with the lead to shift demo to other tasks, and checks any permit for street placement.
    Red flags
    Tells the crew to pile debris in the yard.
  2. The crew arrives at a job and the lumber delivery isn't there. What do you do?

    Situational · Missing deliveries

    Strong answer
    Calls the supplier for a time, finds work the crew can do meanwhile or moves them, updates the PM and records the delay.
    Red flags
    Lets the crew wait.
  3. Walk me through what you set up before a crew starts a new remodel.

    Technical · Setting up a new job

    Strong answer
    Material deliveries and times, dumpster, a portable toilet if needed, keys or lockbox, posted permit, scaffolding or equipment, parking and a notice to the client.
    Red flags
    Gives the crew the address.
  4. Walk me through how you track crews, deliveries and equipment across several jobs in one day.

    Technical · Tracking crews and equipment

    Strong answer
    Keeps one live board, gets check-ins from leads, confirms deliveries, and updates changes as they happen.
    Red flags
    Relies on memory and texts.
  5. Tell me about a time a failed inspection or a sub no-show forced you to reassign crews mid-day.

    Behavioral · Reassigning crews

    Strong answer
    Explains how they decided who moved, told crews and clients right away, and made sure materials and tools followed.
    Red flags
    Moved crews without telling clients or checking materials.
  6. Tell me about a time you caught a problem with a delivery, dumpster or job access before it cost a crew a day.

    Behavioral · Catching details

    Strong answer
    Gives a specific case, such as a delivery set for the wrong address or a missing lockbox code, how they caught it, and the delay it prevented.
    Red flags
    Can't recall one, or describes catching it only after the crew was on site.

Work exercise: Run the logistics board

Give finalists a made-up day: [4] crews, [6] jobs, [5] deliveries, one full dumpster and one missing delivery. Ask them to plan the day and say what they'd tell each crew and client. Allow [15] minutes.

Bookkeeper

6 questions · Process sub invoices
Job description
  1. Walk me through how you process a subcontractor's invoice from receipt to payment.

    Technical · Processing subcontractor invoices

    Strong answer
    Matches it to the subcontract and approved change orders, gets the PM's approval of work complete, checks the insurance certificate is current, collects a lien waiver, codes it to the job, and pays per terms.
    Red flags
    Pays whatever the sub bills once the owner signs the check.
  2. Walk me through how you code costs so each job's profit is accurate.

    Technical · Job cost coding

    Strong answer
    Uses the job number and cost code on every bill, timesheet and receipt, follows up on anything uncoded, and reviews job cost reports with PMs monthly.
    Red flags
    Codes most costs to overhead when unsure.
  3. You find a client's deposit was posted to the wrong job. What do you do?

    Situational · Fixing posting errors

    Strong answer
    Moves it to the correct job, checks whether any invoices or statements went out wrong, corrects them, and tells the PM.
    Red flags
    Leaves it because the totals still balance.
  4. A supplier calls saying they'll file a lien on a client's house over an unpaid invoice. What do you do?

    Situational · Lien threats

    Strong answer
    Checks the records right away, pays if it's valid or documents the dispute, and tells the PM and owner immediately to protect the client.
    Red flags
    Ignores the call until the supplier calls back.
  5. Tell me about a time you caught a costly error in a sub invoice or client draw before it went out.

    Behavioral · Catching errors

    Strong answer
    Names the error, such as paying a sub twice or an unapproved change on an invoice, how they caught it, and the check they added.
    Red flags
    Can't think of an example, or only finds errors after money goes out.
  6. Tell me about a time sub pay requests and lien waivers piled up during month-end close. How did you keep both on track?

    Behavioral · Balancing daily and monthly work

    Strong answer
    Planned the work, paid subs on terms only with waivers and certificates in hand, kept the close on schedule and warned the manager early if anything would slip.
    Red flags
    Let one slip without warning anyone.

Work exercise: Process sub invoices

Give finalists [5] made-up subcontractor invoices with subcontracts, change orders, insurance certificates and lien waivers, including [3] problems such as an expired certificate and a billed change that wasn't approved. Ask them to decide which can be paid and why. Allow [30] minutes.

Inventory Specialist

6 questions · Check orders and stock
Job description
  1. Walk me through how you decide which lumber, fasteners and consumables to keep in the shop and what to order straight to each remodel.

    Technical · Stock or special order

    Strong answer
    Keeps fast-moving fasteners, consumables and common lumber in stock, special-orders job-specific items, and adjusts by usage and storage space.
    Red flags
    Orders everything per job or stocks everything.
  2. A special-order vanity arrives in the wrong size [2] days before install. What do you do?

    Situational · Wrong special orders

    Strong answer
    Tells the PM right away, checks the order paperwork, arranges an exchange or expedites the right one, and helps re-sequence work.
    Red flags
    Sends it to the job anyway.
  3. Crews take materials from the shop without logging them, so job costs are off. What do you do?

    Situational · Unlogged material use

    Strong answer
    Makes logging quick, works with supervisors on accountability, and audits until it's fixed.
    Red flags
    Estimates usage at month-end.
  4. Walk me through how you'd spot when material costs on a job are running higher than budget.

    Technical · Spotting cost overruns

    Strong answer
    Compares purchase orders and usage to the estimate by cost code and flags overruns to the PM early.
    Red flags
    Waits for accounting.
  5. Tell me about a time materials went missing between the shop and a remodel, like a door order or a pallet of tile.

    Behavioral · Tracking missing materials

    Strong answer
    Checked deliveries, job sites and sign-out logs, found the cause, such as unlogged transfers between jobs, and changed the process.
    Red flags
    Reordered without looking.
  6. Tell me about a time you caught a long-lead item, like windows or cabinets, that wasn't ordered in time for the schedule.

    Behavioral · Catching long-lead items

    Strong answer
    Spotted it by checking orders against the schedule, told the PM right away, expedited or found another source, and helped re-sequence work so the crew stayed busy.
    Red flags
    Found out when the crew needed it.

Work exercise: Check orders and stock

Give finalists a made-up stock sheet, [3] job material lists and a delivery slip with [3] errors. Ask them to find the errors, decide what to order for each job, and flag one job over its material budget. Allow [25] minutes.

Sales Representative

6 questions · Run a consultation
Job description
  1. Walk me through your first meeting with a homeowner who wants to add a bathroom.

    Technical · First consultations

    Strong answer
    Asks about goals, budget range and timeline, checks plumbing access, structure and permit needs, explains the design and building process, and sets clear next steps.
    Red flags
    Quotes a price on the spot.
  2. Walk me through how you explain allowances to a client.

    Technical · Explaining allowances

    Strong answer
    Says an allowance is a budget for items they'll pick later, that going over becomes a change order, and sets realistic amounts from the start.
    Red flags
    Sets low allowances to make the price look better.
  3. The client's budget is well below what their wish list will cost. What do you do?

    Situational · Budget conversations

    Strong answer
    Tells them early and kindly, offers options such as phasing or trimming scope, and doesn't lowball to win.
    Red flags
    Quotes low and plans to make it up later.
  4. A client shows you a competitor's much lower bid with few details. What do you do?

    Situational · Comparing bids

    Strong answer
    Compares scope, allowances, exclusions, license and insurance, explains the differences respectfully, and lets the client decide.
    Red flags
    Matches the price.
  5. Tell me about a remodel sale that stalled for weeks while the client waited on financing, HOA approval or design changes. How did you keep it moving?

    Behavioral · Keeping long sales moving

    Strong answer
    Set a dated next step after every contact, helped with what they could, such as lender paperwork, HOA drawings or revised options, kept scope and price current, and closed it or let it go honestly.
    Red flags
    Lost track of it, or pushed fake deadlines to force a decision.
  6. Tell me about a time a project you sold ran into trouble because of something in the sale.

    Behavioral · Owning sales problems

    Strong answer
    Owns a specific miss, such as a low allowance or unclear exclusion, explains how it was fixed with the client and PM, and what they write differently now.
    Red flags
    Blames the PM or crew.

Work exercise: Run a consultation

Give finalists a made-up bathroom addition request with photos, the homeowner's budget and a cost guide. Ask them to prepare and run a first consultation while you play the homeowner, including the budget conversation. Allow [30] minutes.

Laborer / Helper

6 questions · Cut and clean
Job description
  1. You're told to help tear out an old bathroom. Before you swing a hammer, what do you check or ask?

    Situational · Demo safety

    Strong answer
    Asks if water and power are off, what stays, what PPE to wear, whether the old materials were tested for lead or asbestos, and where debris goes.
    Red flags
    Starts swinging right away.
  2. At the end of the day, there are nails, scrap wood and cords across the walkway. What do you do?

    Situational · Keeping the site safe

    Strong answer
    Picks up nails and scrap, coils cords, sweeps, clears walkways and secures tools.
    Red flags
    Leaves it for the morning.
  3. Walk me through how you'd safely cut a sheet of plywood with a circular saw.

    Technical · Using a circular saw

    Strong answer
    Checks the saw and guard, wears eye and ear protection, supports the sheet so it won't pinch or drop, sets the blade depth, keeps the cord clear, and lets the blade stop.
    Red flags
    Pins the guard back, lets the offcut drop and pinch the blade, or holds small pieces by hand while cutting.
  4. A lumber delivery arrives while the lead is away, and the driver wants you to sign. What do you do?

    Situational · Receiving deliveries

    Strong answer
    Counts and checks it against the order if possible, notes shortages or damage on the slip, calls the lead, and stacks lumber flat and off the ground.
    Red flags
    Signs without looking.
  5. Tell me about a time at work, school or volunteering when the first way you tried to fix or build something didn't work. What did you do next?

    Behavioral · Persistence

    Strong answer
    Explains the task, how they kept going or found a better way, and what they learned.
    Red flags
    Gave up when it got hard.
  6. Tell me about a time at work, school or volunteering when a customer or someone else asked you to do something different from what your boss said. What did you do?

    Behavioral · Handling mixed instructions

    Strong answer
    Stayed polite, said they'd check, and asked the person in charge before changing anything.
    Red flags
    Did what the other person asked without telling the boss, or ignored the request.

Work exercise: Cut and clean

In your shop, with a lead watching, ask the candidate to cut a strip of scrap board to a marked line with a hand saw (a circular saw only where your safety rules allow and the lead supervises), then name [8] common tools and clean up the area. Allow [20] minutes and follow your shop safety rules.

Lead Carpenter / Craftsman

6 questions · Frame an opening from a plan
Job description
  1. You need to cut a new doorway into an interior bearing wall. Walk me through how you do it safely.

    Technical · Opening a bearing wall

    Strong answer
    Confirms the header size from the plans or engineer and the permit, checks the wall for utilities, builds temporary shoring on both sides, cuts, installs the header with jack and king studs, and makes sure the load has a path down.
    Red flags
    Cuts the opening first and adds a header after.
  2. Walk me through how you lay out and install base cabinets in a kitchen where the floor isn't level and the walls aren't straight.

    Technical · Setting cabinets on bad floors

    Strong answer
    Finds the high point, snaps a level line, shims cabinets up to it, checks level and plumb, scribes fillers to the walls, fastens into studs, and checks appliance openings.
    Red flags
    Sets them on the floor as is and caulks the gaps.
  3. The electrician shows up for rough-in, but the framing changes from a change order aren't finished. What do you do?

    Situational · Coordinating subs

    Strong answer
    Points the electrician to areas that are ready, finishes the framing first, tells the PM, and avoids a wasted trip.
    Red flags
    Sends the electrician home without telling the PM.
  4. The homeowner stops by daily and asks your crew to make small changes on the spot. What do you do?

    Situational · Managing on-site requests

    Strong answer
    Stays friendly, writes down each request, routes it through the PM as a change order, and keeps the crew on the plan.
    Red flags
    Makes changes with no paperwork.
  5. Tell me about a carpenter you trained who now works at a high level. What did you teach first?

    Behavioral · Training carpenters

    Strong answer
    Names the skills taught in order, how they gave feedback, and how the person grew.
    Red flags
    Can't name anyone, or expects new carpenters to learn by watching.
  6. Tell me about a time you found a way to waste less lumber, trim or drywall on a remodel.

    Behavioral · Reducing waste

    Strong answer
    Names the change, such as cut lists, ordering exact lengths or reusing offcuts for blocking, and the material or money saved.
    Red flags
    Waste is part of the job.

Work exercise: Frame an opening from a plan

In your shop, give the candidate a simple framing plan for a door opening with a header and the lumber to build it. Ask them to lay out and frame it in a practice wall section, explaining how the load is carried. Use power tools only where your safety rules allow and a lead supervises. Allow [45] minutes.

Skilled Tradesperson

6 questions · Build from a drawing
Job description
  1. Walk me through how you read a set of plans before starting work in a room.

    Technical · Reading plans

    Strong answer
    Checks dimensions, elevations, notes, schedules and details, compares them to what's on site, and asks the PM about conflicts before cutting.
    Red flags
    Glances at the plans and starts.
  2. Walk me through how you'd repair rotted exterior trim and siding so it doesn't rot again.

    Technical · Repairing rot so it lasts

    Strong answer
    Removes rot back to sound wood, finds the water source such as missing flashing, replaces with primed or rot-resistant material, flashes correctly, seals cut ends and paints.
    Red flags
    Patches it with filler and paint.
  3. You're building deck stairs, and the homeowner wants taller steps to save space. What do you do?

    Situational · Holding to code

    Strong answer
    Explains the riser height limits in the code your area enforces and why even steps matter for safety, won't build it out of code, and offers other layouts.
    Red flags
    Builds it the way the homeowner asked.
  4. You're working alone and find the plans don't match where the existing walls are. What do you do?

    Situational · Plans that don't match the site

    Strong answer
    Stops, measures, takes photos and calls the PM before improvising.
    Red flags
    Builds to the plans anyway or changes the design on their own.
  5. Tell me about a remodel task you did alone, like hanging doors or a trim package, that passed the PM's or client's check the first time.

    Behavioral · Working independently

    Strong answer
    Names their own checks (measuring twice, checking level and plumb, comparing to plans) and a result such as passing inspection the first time.
    Red flags
    Has always needed someone checking.
  6. Tell me about a time a homeowner asked you about code, structure or materials and you didn't know the answer on the spot.

    Behavioral · Honest answers to clients

    Strong answer
    Said honestly they'd find out, checked with the PM or code, and called the client back with the answer.
    Red flags
    Guessed and gave the client a wrong answer.

Work exercise: Build from a drawing

In your shop, give the candidate a simple drawing, such as a framed window opening or an outside trim corner, plus materials and hand tools. Use power tools only where your safety rules allow and a lead supervises. Ask them to build it to the drawing and explain their choices. Allow [45] minutes.

Start Hiring Now.

Tell us who you need to hire. Compare plans, then work with HireBus to set up your first role.

Start Hiring Now
We use HireBus and love it!Scott Schwinn, Fusion Cleaning

Plan details, setup costs, and advertising spend · See pricing