Demolition interview questions
127 interview questions for the 21 roles a $20M business in this industry hires for, from leadership to the field. Each role has job-related questions, what strong and weak answers sound like, and a short work exercise.
21 roles. Open one to see its questions, or open them all.
Chief Executive Officer
6 questions · Read a company snapshot
A general contractor offers steady interior tear-out work at thin margins, while structural demolition pays better but carries more risk. How do you decide the mix?
Situational · Choosing the work mix
- Strong answer
- Weighs margin against safety exposure and insurance cost, steady cash flow, crew skills and equipment, and how much one customer would control the business.
- Red flags
- Chases whichever pays more per job without thinking about risk.
Walk me through how you'd use the company's safety and claims record to win more work from general contractors.
Technical · Safety record as a business asset
- Strong answer
- Knows general contractors prequalify subs on the experience modification rate and incident history, tracks those numbers, and invests in training, return-to-work and claims follow-up to bring them down.
- Red flags
- Sees safety only as a cost or doesn't know what the experience modification rate is.
A city wants bids to demolish a group of vacant houses. It requires asbestos surveys, prevailing wage and a bond, and you've never done public work. How do you decide?
Situational · Entering public work
- Strong answer
- Learns the requirements and costs, lines up an abatement partner and bonding, checks certified payroll capacity, and might start with a smaller public job.
- Red flags
- Bids low to get in without understanding the requirements.
Tell me about a time you walked away from a contract during negotiation.
Behavioral · Walking away
- Strong answer
- Names the terms that made it a bad deal, such as hidden-condition risk or payment terms, and what happened after.
- Red flags
- Has never walked away from work.
Tell me about a serious incident in a company you led and what you personally changed afterward.
Behavioral · Owning serious incidents
- Strong answer
- Describes their own role, the root cause, and a change they made and kept, not only a memo.
- Red flags
- Blames the worker or the crew lead.
Tell me how you built a leadership team that could run demolition jobs safely without you on site.
Behavioral · Building a leadership team
- Strong answer
- Explains how they chose and developed supervisors and managers, set safety and decision rules, and replaced those who didn't fit.
- Red flags
- Still makes every decision personally.
Work exercise: Read a company snapshot
Give finalists a one-page made-up snapshot: revenue and margin for interior tear-outs, whole-house demolition and commercial strip-outs, the experience modification rate, equipment age, and the top three customers' share of revenue. Ask them to name the biggest risk and the best growth move in [30] minutes.
Chief Operating Officer
6 questions · Choose what to fix
You learn a crew started a kitchen tear-out before anyone confirmed the gas line was shut off and capped. No one was hurt. What do you do?
Situational · Fixing a broken checklist
- Strong answer
- Stops similar work until confirmed, finds out how the start got approved without it, adds a sign-off before any start, retrains supervisors, and shares the lesson company-wide.
- Red flags
- Treats it as a close call and moves on.
How do you measure crew efficiency in demolition, where every job is different?
Technical · Measuring crew efficiency
- Strong answer
- Compares estimated to actual hours by job type, tracks tons or loads removed per labor hour, equipment idle time, and wait time for dumpsters.
- Red flags
- Judges by whether the job finished on time.
Your most productive crew also has the worst safety audit results. What do you do?
Situational · Safety versus production
- Strong answer
- Raises it directly with the crew lead, makes safety part of how the crew is judged, sets clear consequences, and follows up with spot checks.
- Red flags
- Excuses it because the crew is fast.
How do you decide whether to buy, rent or subcontract specialized equipment like a high-reach excavator?
Technical · Equipment strategy
- Strong answer
- Looks at how often jobs need it, rental and ownership cost, operator skill and transport, and the risk of not having it when needed.
- Red flags
- Buys it because it's impressive or never considers owning.
Tell me about a process change you made that shortened project time.
Behavioral · Speeding up projects
- Strong answer
- Names the bottleneck, such as debris haul-off or permit timing, the change, and the measured result.
- Red flags
- Pushed crews to work faster.
Tell me about a time an OSHA, air-quality or building inspector found a problem on one of your demolition sites.
Behavioral · Responding to regulators
- Strong answer
- Cooperated, fixed the problem fast, found the root cause (a missed asbestos notice, dust, unguarded openings), changed the process, and checked the other sites.
- Red flags
- Fought the inspector or blamed the crew.
Work exercise: Choose what to fix
Give finalists [five] made-up job reports with hours, tons hauled, incidents and customer complaints. Ask them to pick the operational problem to fix first and outline the fix in [30] minutes.
Chief Financial Officer
6 questions · Find the losing jobs
Walk me through how you'd forecast cash for a demolition company with uneven project payments and large disposal bills.
Technical · Cash forecasting
- Strong answer
- Builds a rolling weekly forecast from billing schedules, retainage, disposal and hauling bills, payroll and equipment payments, and updates it every week.
- Red flags
- Looks at the bank balance and last month's profit.
How should scrap and salvage value show up in bids and job costs?
Technical · Scrap value in bids
- Strong answer
- Estimates it conservatively because prices swing, records actual scrap revenue against each job, and tracks the gap so estimators don't count on high prices.
- Red flags
- Lets estimators lower bids based on today's scrap prices.
Disposal costs on three jobs came in far over estimate. What do you do?
Situational · Disposal cost overruns
- Strong answer
- Compares estimated to actual tons, checks whether mixed loads were charged at higher rates than sorted ones, checks rate changes, and updates estimating and sorting rules.
- Red flags
- Accepts it as the cost of doing business.
Your insurance premium jumps sharply at renewal. What do you do?
Situational · Insurance costs
- Strong answer
- Finds the drivers, such as claims, payroll class codes or the experience modification rate, works with the broker to market the account, and builds a plan to bring claims down.
- Red flags
- Pays it or cuts coverage without understanding why.
Tell me about a time your cash forecast missed because of disposal bills, slow payments or a delayed job. What did you change?
Behavioral · Learning from forecast misses
- Strong answer
- Explains what was missed, how they found out, and how they changed the forecast method.
- Red flags
- Says their forecasts are always right.
Tell me about a cost-control change you led that operations actually adopted.
Behavioral · Partnering with operations
- Strong answer
- Involved field leaders, showed the numbers, made it practical, and tracked the result.
- Red flags
- Issued a policy that the field ignored.
Work exercise: Find the losing jobs
Give finalists made-up data for [six] finished demolition jobs: bid, labor, disposal tons and cost, scrap revenue and equipment hours. Ask them to find which jobs lost money and why, and draft two estimating rules in [30] minutes.
General Manager
6 questions · Rank the issues
Your estimators keep underbidding disposal, and several jobs lost money. What do you do?
Situational · Fixing estimating
- Strong answer
- Compares estimated to actual tons and rates by material, updates estimating sheets, adds sorting for recycling where it pays, and holds post-job reviews.
- Red flags
- Tells estimators to add a cushion to everything.
Walk me through the numbers you check each week to know whether the business is healthy.
Technical · Weekly health check
- Strong answer
- Backlog, job margins against estimate, disposal costs, receivables, cash, equipment downtime, and safety incidents and near misses.
- Red flags
- Looks only at sales.
A remodeler who sends you steady work asks you to skip the asbestos test on an old house to save time. What do you do?
Situational · Refusing unsafe shortcuts
- Strong answer
- Refuses, explains the legal and health risks, offers to get testing done quickly, and accepts losing the customer if needed.
- Red flags
- Agrees to keep the relationship.
Tell me about a time you improved the handoff between sales and the field.
Behavioral · Sales-to-field handoff
- Strong answer
- Found where information got lost and set up a specific fix, like a scope review meeting or checklist.
- Red flags
- Told both sides to communicate better.
Tell me about a time you cut or moved budget, such as equipment or overtime, over your managers' objections.
Behavioral · Tough budget calls
- Strong answer
- Explains the reasoning, how they listened, and how it turned out.
- Red flags
- Made the call without explaining it.
Tell me about a safety improvement you led across a whole company.
Behavioral · Company-wide safety
- Strong answer
- Names the change, how they got crews to adopt it, and how they measured it.
- Red flags
- Only added rules on paper.
Work exercise: Rank the issues
Give finalists a made-up monthly report: revenue, job margins, disposal cost by job, one recordable injury, and two customer complaints about property damage. Ask them to rank the issues and present a plan in [30] minutes.
Field Supervisor
6 questions · Find the hazards
Walk me through your morning safety briefing on a whole-house demolition.
Technical · Morning safety talk
- Strong answer
- Covers the day's tasks and order, falling debris and equipment zones, utility status, dust control, PPE, who spots for the machine, and the emergency plan.
- Red flags
- Reads a generic topic sheet.
The water supply for dust control fails, and dust is drifting toward neighboring homes. What do you do?
Situational · Dust control failure
- Strong answer
- Pauses the dusty work, finds another water source, shifts the crew to low-dust tasks, and updates the project manager.
- Red flags
- Keeps going because the machine is already running.
A neighbor walks onto the site to take photos while the excavator is working. What do you do?
Situational · Public on site
- Strong answer
- Signals the operator to stop, walks the person out of the zone politely, and fixes the fence or signs.
- Red flags
- Lets them stay because they're just watching.
How do you confirm utilities are really disconnected before demolition starts?
Technical · Verifying utility disconnects
- Strong answer
- Has written confirmation from each utility, sees meters removed and lines capped, tests electrical with a tester, and records it in the daily log.
- Red flags
- Takes the customer's word.
Tell me about a time you stopped work because of a hazard others had missed.
Behavioral · Spotting missed hazards
- Strong answer
- Explains what they noticed, how they stopped it, and what changed.
- Red flags
- Has never stopped work, or waits for someone else to.
Tell me about a time you had to correct a crew member on a high-pressure day.
Behavioral · Correcting under pressure
- Strong answer
- Corrected it right then, stayed calm, explained why, and followed up later.
- Red flags
- Yelled or let it slide.
Work exercise: Find the hazards
Give finalists made-up photos of a demolition site with [five] hazards, such as an unguarded floor opening, debris piled against a wall, an open electrical box, a gap in the fence and a worker without eye protection. Ask them to find the hazards and give a short safety briefing in [15] minutes.
HR Manager
6 questions · Work a safety complaint case
You need [four] laborers fast for a large strip-out, and laborer turnover is already high. What do you do?
Situational · Fast hiring with high turnover
- Strong answer
- Uses referrals and trusted staffing partners, checks pay against the market, speeds up hiring, pairs new hires with a buddy, and studies exit reasons to fix turnover.
- Red flags
- Hires anyone who shows up without orientation.
Walk me through the training records crew members need before working where there may be lead paint or asbestos.
Technical · Hazard training records
- Strong answer
- Hazard communication, asbestos awareness, lead and silica training where exposure is possible, respirator medical clearance and fit testing under a written program, and any state licenses, all tracked with renewal dates.
- Red flags
- Doesn't know what training applies.
A laborer reports an injury two days after it happened, and the foreman says it didn't happen at work. What do you do?
Situational · Late injury reports
- Strong answer
- Takes the report, follows the company's injury reporting process, investigates the facts, records it correctly, and makes sure there's no retaliation.
- Red flags
- Sides with the foreman and drops it.
How do you make sure staffing-agency workers get the same safety training as your own crew?
Technical · Temporary worker safety
- Strong answer
- Knows both the agency and the company are responsible, gives a site-specific orientation, documents it, and checks agency training records.
- Red flags
- Assumes the agency handled it.
Tell me about a time you reduced turnover in a hard, physical job.
Behavioral · Reducing turnover
- Strong answer
- Used exit data, changed something specific, and measured the result.
- Red flags
- Says turnover is just part of the industry.
Tell me about a time you enforced a policy on a supervisor who disagreed with it.
Behavioral · Holding supervisors to policy
- Strong answer
- Explained the reason and the risk, stayed firm, and documented it.
- Red flags
- Made an exception to avoid conflict.
Work exercise: Work a safety complaint case
Give finalists a made-up case: a foreman sent a laborer home for refusing to work under an unbraced wall, and the laborer says it was unsafe. Ask them what they would check, who they would interview, and what they would recommend in [20] minutes.
Marketing Manager
6 questions · Rebalance a sample budget
Walk me through how you'd market interior demolition services to remodelers and general contractors.
Technical · Marketing to contractors
- Strong answer
- Builds relationships through associations and direct outreach, uses a capabilities sheet and case studies that prove speed and cleanliness, and tracks contractor leads in the CRM.
- Red flags
- Runs homeowner ads and hopes contractors see them.
The company wants more whole-house demolition work from builders doing teardowns. Where do you start?
Situational · Finding teardown work
- Strong answer
- Identifies active builders, uses public permit records where available, reaches out directly, and creates a page and offer aimed at builders.
- Red flags
- Boosts social posts to a general audience.
How do you measure return on marketing spend when jobs vary so much in size?
Technical · Return on spend
- Strong answer
- Tracks revenue and margin by channel, not just lead count, and counts repeat work from contractor customers.
- Red flags
- Uses cost per lead only.
A video of your crew knocking down a house is getting lots of views, but commenters point out a worker with no hard hat. What do you do?
Situational · Protecting the brand
- Strong answer
- Takes it down or edits it, tells the safety lead, and sets a rule that safety reviews all field footage before posting.
- Red flags
- Leaves it up because it's getting views.
Tell me about a referral relationship you built with remodelers, builders or property managers.
Behavioral · Building referral sources
- Strong answer
- Explains how they found and kept the relationship and the work it brought.
- Red flags
- Has never built one, or relies only on ads.
Tell me about a time you cut a marketing channel the owner liked, like a home show booth or a mailer, because it wasn't bringing in jobs.
Behavioral · Cutting what doesn't work
- Strong answer
- Brought data on leads, jobs won and margin from that channel, proposed where to move the money, and got agreement.
- Red flags
- Kept it to avoid the conversation.
Work exercise: Rebalance a sample budget
Give finalists a made-up quarter of lead data by source, split between homeowners and contractors, with revenue and margin. Ask them where they would move budget and how they would reach more contractors in [25] minutes.
Office Manager
6 questions · Audit a job folder
Walk me through the paperwork that must be in a demolition job file before work starts.
Technical · Start-of-job paperwork
- Strong answer
- Signed contract, permit, utility disconnect letters, asbestos survey and any abatement clearance, any required state demolition notice or neighbor notice, a street permit for the dumpster if needed, and the insurance certificate the customer asked for.
- Red flags
- Just the contract.
A general contractor needs an insurance certificate naming them as additional insured before you can start tomorrow. What do you do?
Situational · Insurance certificates
- Strong answer
- Calls the agent the same day, checks the contract's coverage requirements, and tells the project manager whether it will arrive in time.
- Red flags
- Sends an old certificate.
An invoice went out without a disposal charge the contract allows. What do you do?
Situational · Billing errors
- Strong answer
- Confirms it with the project manager, sends a corrected invoice with a clear explanation, and fixes the invoice template.
- Red flags
- Lets it go or adds it quietly to the next bill.
How do you keep disposal and recycling records so you can prove where debris went?
Technical · Disposal records
- Strong answer
- Files weight tickets, manifests and recycling receipts by job, matches them to hauler invoices, and can produce them when a customer or agency asks.
- Red flags
- Keeps only hauler invoices.
Tell me about a system you built that kept permits, utility letters or insurance certificates from expiring or going missing.
Behavioral · Building systems
- Strong answer
- Describes the system (a checklist per job, an expiration calendar, a shared folder), how the team used it, and a problem it caught in time.
- Red flags
- Relies on memory and finds gaps at the end of the job.
Tell me about a time a homeowner or contractor called the office upset about something a field crew did.
Behavioral · Handling upset customers
- Strong answer
- Listened without arguing, got the facts from the supervisor, told the caller the next step and when, followed up, and made sure the fix was logged.
- Red flags
- Passed the call to the field without following up, or argued about what happened.
Work exercise: Audit a job folder
Give finalists a made-up job folder with a contract, a permit, one missing utility letter, a dumpster street permit that expires tomorrow, and [six] weight tickets. Ask them to list what's missing and draft the invoice in [20] minutes.
Operations Manager
6 questions · Build a sample week
Two jobs need your only mini excavator on the same day. How do you decide?
Situational · Equipment conflicts
- Strong answer
- Compares deadlines and penalties, checks if a rental is available, looks at sequencing on each job, and tells both project managers the plan.
- Red flags
- Gives it to whoever asked first.
Walk me through how you plan crew size and equipment for a commercial interior strip-out.
Technical · Planning a strip-out
- Strong answer
- Looks at area and materials, allowed work hours, the debris route (freight elevator or enclosed chute), dumpster spots and swaps, building rules, and the deadline.
- Red flags
- Sends the usual crew and figures it out on site.
A building manager says your crew's noise and dust are disturbing tenants and threatens to stop the job. What do you do?
Situational · Occupied buildings
- Strong answer
- Meets quickly, changes hours or methods, improves containment, shares a schedule of noisy work, and checks back.
- Red flags
- Argues that demolition is noisy.
How do you decide when a job needs another crew or overtime versus a schedule change?
Technical · Overtime decisions
- Strong answer
- Weighs overtime cost, fatigue and safety, contract dates, and customer impact.
- Red flags
- Always adds overtime.
Tell me about a time you turned around a crew that kept falling behind.
Behavioral · Turning around a crew
- Strong answer
- Found the cause, made specific changes, and tracked the improvement.
- Red flags
- Replaced people without understanding the problem.
Tell me about a time a crew damaged a customer's property. How did you handle it?
Behavioral · Property damage
- Strong answer
- Told the customer quickly, documented it, made it right, and changed a practice.
- Red flags
- Hoped the customer wouldn't notice.
Work exercise: Build a sample week
Give finalists a made-up week: [three] crews, [five] jobs, one mini excavator, a commercial strip-out limited to night hours, and a hauler with limited swaps. Ask them to build the week and list the risks in [25] minutes.
Project Manager
6 questions · Plan a sample start
Walk me through everything you line up before a house demolition starts.
Technical · Pre-demolition setup
- Strong answer
- The engineering survey OSHA requires, permit, hazardous materials survey and abatement, any required state demolition notice, utility disconnects and caps, sewer cap inspection where required, neighbor notices, erosion control, fencing, hauling and traffic control.
- Red flags
- Gets the permit and schedules the machine.
The asbestos survey comes back positive for floor tile and pipe wrap two days before demolition. What do you do?
Situational · Positive asbestos results
- Strong answer
- Holds the affected work, books a licensed abatement contractor, makes sure any required asbestos notice is filed, gives the customer a change order for cost and time, and starts demolition only after clearance.
- Red flags
- Has the crew remove it carefully to stay on schedule.
During selective demolition, the crew finds rotted framing the customer didn't know about. What do you do?
Situational · Hidden conditions
- Strong answer
- Stops that area, takes photos, tells the customer, gets a structural opinion if needed, and gets a signed change order before more work.
- Red flags
- Rips it out and bills later.
How do you track whether a demolition job is on budget while it's underway?
Technical · Budget tracking
- Strong answer
- Compares labor hours and disposal tons and costs to the estimate by phase, tracks scrap credits and change orders, and acts early on variances.
- Red flags
- Waits for the final bill.
Tell me about a time you handled a neighbor or community complaint during a project.
Behavioral · Neighbor relations
- Strong answer
- Responded quickly, listened, made a specific change, and kept them informed.
- Red flags
- Ignored it until it escalated.
Tell me about a time a subcontractor delayed your job.
Behavioral · Managing subcontractors
- Strong answer
- Raised it early, held them to the agreement, adjusted the schedule, and kept the customer informed.
- Red flags
- Waited and blamed the sub.
Work exercise: Plan a sample start
Give finalists a made-up project: a house demolition with a positive asbestos result, a gas meter still in place, and the neighbor's driveway close to the work. Ask them to write the steps to start, the customer update, and a change order outline in [25] minutes.
Sales Manager
6 questions · Review a sample estimate
A rep's estimate for a commercial strip-out leaves out the after-hours work the building requires. What do you do?
Situational · Catching estimate gaps
- Strong answer
- Fixes it before it goes out, or if signed, talks with the customer, then coaches the rep and adds the item to the review checklist.
- Red flags
- Lets the job run at a loss and says nothing.
Walk me through how you review a demolition estimate before it goes out.
Technical · Estimate review
- Strong answer
- Checks the limits of work and what stays, hazardous material assumptions, disposal tons and rates, access and hours, equipment, permits, protection, and exclusions.
- Red flags
- Checks only the price.
A large general contractor wants you to sign a contract making you responsible for anything hidden in the walls. What do you do?
Situational · Contract risk
- Strong answer
- Negotiates a hidden-conditions clause, exclusions and unit prices for hazardous material, and is ready to walk away.
- Red flags
- Signs it to get the work.
Tell me about a time you grew a key contractor account.
Behavioral · Growing key accounts
- Strong answer
- Explains how they learned the account's needs, delivered, and expanded the work.
- Red flags
- The account grew on its own.
Tell me about a time you coached a rep through a deal they were about to lose.
Behavioral · Deal coaching
- Strong answer
- Diagnosed the real objection, planned the next conversation, and let the rep lead it.
- Red flags
- Took the deal over.
How do you set sales targets for a team selling both small residential jobs and large commercial contracts?
Technical · Setting targets
- Strong answer
- Uses different measures for each, such as close rate and volume for residential and pipeline coverage for commercial, built from capacity and history.
- Red flags
- Gives everyone the same revenue number.
Work exercise: Review a sample estimate
Give finalists a made-up estimate for a commercial strip-out with [four] planted gaps, such as no disposal for ceiling tile, no after-hours premium, unclear limits of work, and no hazardous material exclusion. Ask them to find the gaps and coach the rep in [20] minutes.
Warehouse / Equipment Manager
6 questions · Plan a service week
Walk me through how you inspect and maintain hydraulic breakers, grapples and shears between jobs.
Technical · Attachment maintenance
- Strong answer
- Checks for cracks and bad welds, pins and bushings, greasing, hoses and couplers, and tool wear, and logs what was found and fixed.
- Red flags
- Waits until the attachment fails.
Respirators come back from a job dirty, and some have damaged straps. What do you do?
Situational · Respirator care
- Strong answer
- Tags out the damaged ones, has them cleaned and stored the way the maker says, replaces parts, and trains crews on care.
- Red flags
- Puts them back on the shelf.
A crew needs a skid steer tomorrow, and both of yours are due for service. What do you do?
Situational · Service conflicts
- Strong answer
- Checks how overdue each is, services one tonight or early, rents if needed, and tells dispatch.
- Red flags
- Skips service.
How do you schedule equipment deliveries and pickups so jobs aren't waiting?
Technical · Delivery scheduling
- Strong answer
- Plans from the job schedule, confirms the day before, groups trips, and keeps a backup hauler.
- Red flags
- Handles requests as they come.
Tell me about a time a breaker, skid steer or other machine kept breaking down. How did you fix the pattern?
Behavioral · Fixing failure patterns
- Strong answer
- Tracked failures, found the cause, such as missed greasing or operator misuse, changed maintenance or training, and shows downtime dropped.
- Red flags
- Kept repairing it without asking why.
Tell me about a time you held a crew responsible for lost tools.
Behavioral · Tool accountability
- Strong answer
- Used checkout records, talked directly, and set up a fix.
- Red flags
- Kept buying replacements.
Work exercise: Plan a service week
Give finalists a made-up equipment list with service due dates, two damaged respirators, a breaker with a cracked bracket, and next week's job schedule. Ask them to plan service and deliveries and say what they would tag out in [20] minutes.
Customer Service Representative
6 questions · Handle three sample calls
A homeowner calls wanting an old shed and deck torn down this week. Walk me through the call.
Situational · Taking a new request
- Strong answer
- Asks size and materials, access, whether power runs to the shed, when it was built, and where a dumpster can go, explains that permits and checks may be needed, and books an estimate.
- Red flags
- Promises this week without knowing the details.
A neighbor calls about dust from your demolition site landing on their car. What do you do?
Situational · Dust complaints
- Strong answer
- Apologizes, gets details, calls the field supervisor right away about dust control, sends any damage request to the manager, and calls the neighbor back.
- Red flags
- Says it's a construction site or doesn't follow up.
A customer calls upset that the crew left nails and debris in the yard after a deck tear-out. What do you do?
Situational · Cleanup complaints
- Strong answer
- Apologizes, schedules a return cleanup with a magnet sweep, logs it, and tells the supervisor so it doesn't happen again.
- Red flags
- Tells the customer the crew always cleans up.
Walk me through the call you make to a homeowner the day before demolition starts.
Technical · Confirming appointments
- Strong answer
- Confirms the time, access, utility shut-off status, dumpster spot, cars and pets out of the way, and who will be home, and notes the confirmation.
- Red flags
- Sends a reminder text and nothing else.
Tell me about a time you kept a customer updated while their project kept changing, like a start date that moved for permits or testing.
Behavioral · Ongoing updates
- Strong answer
- Set a regular update rhythm, gave honest news with the reason and the new date, and kept notes current so anyone could answer the customer.
- Red flags
- Only called when the customer called first.
Tell me about a time you made a mistake with a customer's appointment, such as an estimate visit or a start date.
Behavioral · Owning mistakes
- Strong answer
- Called the customer first, apologized without excuses, rebooked at a time that worked for them, told the crew, and names the check they added, like reading back dates.
- Red flags
- Blamed the system or a coworker.
Work exercise: Handle three sample calls
Role-play three made-up calls in [15] minutes: a homeowner who wants a detached garage torn down, a neighbor upset about dust, and a customer asking why the dumpster hasn't been picked up. Ask the candidate to log each call with the next step.
Dispatcher
6 questions · Plan tomorrow's board
A dumpster on a busy tear-out is full by mid-morning, and the hauler can't swap it until tomorrow. What do you do?
Situational · Debris bottlenecks
- Strong answer
- Calls other haulers, moves the crew to work that doesn't create debris, makes sure debris isn't piled where it blocks exits, and updates the project manager.
- Red flags
- Lets the crew pile debris anywhere or sends them home.
A crew finishes early and another job is behind. How do you decide whether to move them?
Situational · Moving crews
- Strong answer
- Checks skills and equipment fit, travel time, and the site's work hours, then moves them and updates the board and both supervisors.
- Red flags
- Sends them home or moves them without telling anyone.
Walk me through what must be confirmed before you put a demolition start on the board.
Technical · Ready to start
- Strong answer
- Permit, utility disconnects, hazardous material clearance, dumpster delivery, equipment and trailer, customer access, and any neighbor notices.
- Red flags
- Puts it on the board when the customer signs.
How do you track equipment so service happens without pulling machines off jobs at the worst time?
Technical · Maintenance timing
- Strong answer
- Tracks hours and service due dates, schedules service on light days, and works with the shop to plan swaps.
- Red flags
- Finds out a machine is due when it breaks.
Tell me about a time you reshuffled crews after someone didn't show up.
Behavioral · Handling no-shows
- Strong answer
- Moved quickly, kept the most important jobs covered, and told customers and supervisors.
- Red flags
- Left the job short without telling anyone.
Tell me about a time you pushed back on a manager's scheduling request.
Behavioral · Pushing back
- Strong answer
- Explained the conflict with facts, offered options, and accepted the final call professionally.
- Red flags
- Said yes to everything and missed commitments.
Work exercise: Plan tomorrow's board
Give finalists a made-up board: [four] crews, [five] jobs, [three] dumpsters near full, one skid steer in the shop, and a hauler with limited swaps. Ask them to plan tomorrow and say what they would tell each project manager in [20] minutes.
Bookkeeper
6 questions · Code a sample job file
Walk me through how you'd code dumpster rentals, landfill fees and scrap metal payments so each demolition job shows its true cost.
Technical · Coding disposal and scrap
- Strong answer
- Codes rentals and tipping fees to the job and cost code using the weight tickets, records scrap payments against the job they came from, and checks hauler invoices against the tickets.
- Red flags
- Puts disposal in one overhead account and scrap in miscellaneous income.
A crew lead hands you cash from a scrap yard run with no scale ticket. What do you do?
Situational · Cash controls on scrap
- Strong answer
- Counts it with the crew lead, writes a receipt, asks for the scale ticket, records it to the job, and tells the manager so scrap sales follow a set process.
- Red flags
- Puts the cash in the drawer without a record or question.
The asbestos abatement subcontractor's invoice is higher than the purchase order and has no lien waiver. What do you do?
Situational · Subcontractor invoices
- Strong answer
- Holds payment, checks the purchase order and any approved change, asks the project manager to approve or dispute the difference, and requests the waiver before paying.
- Red flags
- Pays it because the work is done.
What would you give the owner each month to show which demolition jobs made money?
Technical · Job profit reporting
- Strong answer
- A job cost report comparing labor, disposal, equipment, subcontractors and scrap credits to each job's estimate, plus receivables aging and cash.
- Red flags
- A company profit and loss statement only.
Tell me about a time you found a charge that didn't belong, like a fuel card used on a weekend or a dump fee with no job behind it.
Behavioral · Catching irregular charges
- Strong answer
- Explains how they spotted it (matching tickets to jobs, card activity to the schedule), checked the facts quietly, who they told, and the outcome.
- Red flags
- Ignored it or confronted someone without facts.
Tell me about a time a customer or general contractor disputed an invoice, such as a change order for extra debris or hidden materials.
Behavioral · Resolving billing problems
- Strong answer
- Pulled the contract, the signed change order and the weight tickets, walked the customer through the charge calmly, fixed any real error, and recorded the agreement.
- Red flags
- Let it drag on, or wrote it off without checking the records.
Work exercise: Code a sample job file
Give finalists made-up records for [three] demolition jobs: dumpster invoices, landfill weight tickets, a scrap yard check with no job name, an abatement invoice that doesn't match its purchase order, and a customer payment. Ask them to code each item, flag problems, and list who they would ask in [25] minutes.
Inventory Specialist
6 questions · Build next week's order
Walk me through how you'd track respirator cartridges, gloves and other protective gear so crews never run out.
Technical · Tracking PPE
- Strong answer
- Sets stock levels per crew, logs usage, reorders before running low, keeps the sizes and models crews use, and checks shelf life.
- Red flags
- Orders when someone complains.
A crew needs respirators for a job tomorrow, and the model and size they were fit tested on is out of stock. What do you do?
Situational · No substitutions on respirators
- Strong answer
- Doesn't swap in a different model, finds the right one from another supplier fast, and tells the supervisor if it won't arrive in time.
- Red flags
- Sends whatever respirator is on the shelf.
Saw blades and breaker bits are disappearing faster than the jobs explain. What do you do?
Situational · Unexplained usage
- Strong answer
- Compares usage to job volume, checks checkout logs and truck stock, and works with supervisors on tracking.
- Red flags
- Keeps reordering without asking why.
How do you set reorder points for supplies like blades, plastic sheeting and contractor bags?
Technical · Reorder points
- Strong answer
- Uses past usage, vendor lead time and upcoming jobs, sets minimums, and reviews them as the job mix changes.
- Red flags
- Guesses, or orders when bins are empty.
Tell me about a time you organized a stockroom, truck or tool crib so crews could find what they needed fast.
Behavioral · Fixing inventory systems
- Strong answer
- Explains the old problem, the layout, labels or bins they set up, how stock levels were tracked, and a result like fewer emergency supply runs.
- Red flags
- Can't describe a system they owned.
Tell me about a time field crews pushed back on your process.
Behavioral · Working with crews
- Strong answer
- Listened to the crews' complaints, made the process simpler, got supervisor support, and checked it was followed.
- Red flags
- Gave up or argued.
Work exercise: Build next week's order
Give finalists a made-up inventory sheet with [four] weeks of usage and next week's jobs: two interior tear-outs and a house demolition. Ask them to build the order, flag items that can't be substituted, and note anything that looks like loss in [20] minutes.
Sales Representative
6 questions · Scope a basement gut
Walk me through a site visit to price tearing out a kitchen and two bathrooms in a lived-in house.
Technical · Scoping a tear-out
- Strong answer
- Measures, notes materials like tile, cast iron and plaster, plans the debris path and dust protection, utilities to disconnect, when the house was built for hazard testing, dumpster spot, hours, and what stays.
- Red flags
- Prices by room without looking closely.
A homeowner asks why your quote includes an asbestos test they think is unnecessary. What do you say?
Situational · Explaining testing
- Strong answer
- Explains in plain words that older materials can contain asbestos, that testing protects the family and crew and may be required, and holds firm.
- Red flags
- Drops the test to close.
A customer wants the crew to save the cabinets and fixtures for reuse. How do you handle it?
Situational · Salvage requests
- Strong answer
- Lists each item, prices the extra care, agrees on where they'll be stored, and writes it into the scope.
- Red flags
- Agrees verbally and doesn't tell the crew.
How do you estimate how much debris a job will produce?
Technical · Estimating debris
- Strong answer
- Works by material and area, uses past jobs, and accounts for weight on heavy materials like plaster, tile and concrete as well as volume.
- Red flags
- Guesses one dumpster.
Tell me about a demolition or tear-out job you lost to a cheaper quote. What did you find out about the other bid?
Behavioral · Learning from losses
- Strong answer
- Explains what they learned, such as the other bid leaving out disposal, permits or asbestos testing, and how they now show scope differences clearly in writing.
- Red flags
- Blames lowball competitors only.
Tell me about a time you made sure what you sold matched what the crew delivered.
Behavioral · Matching sale to delivery
- Strong answer
- Walked the job with the crew lead or wrote a clear handoff, and checked in during the job.
- Red flags
- Handed off the contract and moved on.
Work exercise: Scope a basement gut
Give finalists made-up photos and a floor plan of a [1960s] house where the owner wants the basement gutted. Ask them to write the scope, exclusions and questions for the customer in [25] minutes.
Rehash Specialist
6 questions · Rank and call
You call a homeowner who got your quote for a garage teardown last spring and never replied. How do you open the call?
Situational · Reopening stalled quotes
- Strong answer
- Reintroduces themselves, names the specific project, asks whether it's still planned and what held them back, offers an updated quote or timing, and sets a next step or closes the lead politely.
- Red flags
- Launches into a pitch, or offers a discount before learning why they stalled.
Walk me through how you decide which old demolition leads are worth calling back.
Technical · Prioritizing old leads
- Strong answer
- Looks at job type and size, why it was lost, how long ago, whether the project could still be pending, and whether it's a contractor who might have repeat work.
- Red flags
- Calls everyone in the order they appear.
A contractor who used you once says your crew showed up late on their last job. What do you do?
Situational · Repairing relationships
- Strong answer
- Listens, apologizes, checks what happened, explains what changed, and brings in operations if needed.
- Red flags
- Argues or changes the subject to a new pitch.
A past lead says they hired another company and don't want more calls. What do you do?
Situational · Respecting a no
- Strong answer
- Thanks them, politely asks once for feedback, marks them do-not-contact, and stops.
- Red flags
- Keeps pitching.
Tell me about a time a deal you lost led to new work.
Behavioral · Turning losses into wins
- Strong answer
- Explains how they kept the door open and what brought the customer back.
- Red flags
- Wrote the lead off as soon as they said no.
Tell me about a time your follow-up system caught a lead that would otherwise have slipped through.
Behavioral · Follow-up discipline
- Strong answer
- Describes their CRM routine (every lead has a next step and date, a daily task list, notes after each call) and the lead it saved.
- Red flags
- Uses memory or sticky notes.
Work exercise: Rank and call
Give finalists [ten] made-up lost demolition leads, half homeowners and half contractors, with notes. Ask them to rank them in [10] minutes, then role-play one call for [10] minutes with a contractor who said your price was too high.
Lead Demolition Specialist
6 questions · Plan a house demolition
Walk me through how you'd sequence taking down a house with an attached garage on a tight lot.
Technical · Sequencing a house demolition
- Strong answer
- Starts with the engineering survey, clears hazardous materials and utilities, strips salvage and recyclables, brings the structure down in a controlled order away from neighbors and the street, keeps exclusion zones and dust control, then handles foundation and sewer cap per local rules.
- Red flags
- Starts knocking it down with the machine and sorts it out later.
Halfway through a house demolition, you see a crack spreading in the neighbor's foundation wall near the property line. What do you do?
Situational · Protecting adjacent property
- Strong answer
- Stops work, documents with photos, tells the project manager, changes methods to cut vibration, and gets an engineer's input before going on.
- Red flags
- Keeps going and hopes it was already there.
Walk me through how you handle fluorescent tubes and ballasts, mercury thermostats and old refrigerators in a building set for demolition.
Technical · Handling hazardous items
- Strong answer
- Removes them before demolition, handles lamps and mercury devices as universal waste, checks older fluorescent ballasts for PCBs, has refrigerant recovered before disposal as EPA rules require, and keeps the records.
- Red flags
- Tosses them in the dumpster.
Your crew wants to cut a steel beam to speed up a partial demolition, and there's no engineer's plan for that cut. What do you do?
Situational · Protecting structural members
- Strong answer
- Stops the cut, explains that cutting a structural member can cause an unplanned collapse, gets the engineer's sequence and any shoring in place first, and keeps everyone out of the area.
- Red flags
- Lets them cut it with someone watching.
Tell me about how you trained a crew member to run a demolition machine or tool safely.
Behavioral · Training on equipment
- Strong answer
- Taught in steps, watched them work, and signed them off only when they showed they could do it safely.
- Red flags
- Let them learn on the job without oversight.
Tell me about a time you worked with an inspector, utility or local authority to keep a demolition on track.
Behavioral · Working with authorities
- Strong answer
- Was prepared, respectful and responsive, and got what was needed without cutting corners.
- Red flags
- Went around them or argued.
Work exercise: Plan a house demolition
Give finalists a made-up site plan and photos of a small house set for demolition: close neighbors, an overhead service drop, a detached garage and an old heating oil tank. Ask them to write the work sequence, the exclusion zones, and every utility or hazard to clear before work starts in [25] minutes.
Demolition Technician
7 questions · Plan a tear-out
Walk me through how you check whether a wall is safe to remove during an interior tear-out.
Technical · Before removing a wall
- Strong answer
- Confirms with the lead or plans whether it's load-bearing, looks for wiring, plumbing, gas and ducts inside, confirms power is off and tests with a voltage tester, and waits for shoring if it's bearing.
- Red flags
- Starts swinging once told the wall is coming out.
You open a wall and find old pipe insulation that you think might contain asbestos. What do you do?
Situational · Suspect asbestos
- Strong answer
- Stops, doesn't touch or break it, keeps others away, and tells the supervisor so it can be tested.
- Red flags
- Bags it up and keeps going.
Your voltage tester shows a circuit is still live after the panel was supposedly shut off. What do you do?
Situational · Live circuits
- Strong answer
- Stops, tells the lead, waits for the right breaker to be found and locked out or for an electrician, and retests before working.
- Red flags
- Cuts the wires carefully anyway.
Walk me through how you set up a work area to keep dust out of the rest of a lived-in house.
Technical · Dust containment
- Strong answer
- Sets plastic barriers, seals vents and returns, protects floors along the path, uses misting and a HEPA vacuum, cleans up daily, and follows lead-safe (RRP) rules in older homes.
- Red flags
- Closes the door and sweeps at the end.
Tell me about a time you protected something on a job that wasn't supposed to come out.
Behavioral · Protecting what stays
- Strong answer
- Describes how they marked or covered it, told the crew, and kept it safe.
- Red flags
- Damaged something and didn't report it.
Tell me about a time a teammate was cutting corners on safety. What did you do?
Behavioral · Peer safety
- Strong answer
- Spoke up directly and respectfully, and went to the lead if it continued.
- Red flags
- Said nothing to avoid conflict.
Walk me through how you control dust when breaking up or cutting a concrete floor.
Technical · Silica dust control
- Strong answer
- Uses the controls OSHA's silica table lists for the tool, such as water to the blade for saws and water or a vacuum shroud for jackhammers, wears the required respirator, keeps others clear, and never dry sweeps or uses compressed air.
- Red flags
- Cuts dry, or relies on a dust mask and a broom.
Work exercise: Plan a tear-out
Give finalists a made-up kitchen floor plan with photos showing a wall with plumbing, a gas range, an old vinyl floor and a bearing wall. Ask them to list what they would check, in order, before starting demolition in [20] minutes. Where your space allows, have them set up a short dust barrier.
Laborer / Helper
6 questions · Sort and load
You're loading a dumpster and see old fluorescent tubes and a thermostat in the pile. What do you do?
Situational · Spotting hazardous items
- Strong answer
- Takes them out carefully without breaking them, sets them aside, and tells the supervisor.
- Red flags
- Throws them in with everything else.
You're told to clean up a room where someone is still pulling down ceiling drywall. What do you do?
Situational · Working below overhead demolition
- Strong answer
- Waits outside or asks the person overhead to stop before going in, and doesn't work below falling debris.
- Red flags
- Goes in and works fast to stay out of the way.
During a dusty tear-out, you notice dust getting past your respirator. What do you do?
Situational · Respirator problems
- Strong answer
- Leaves the dusty area, tells the supervisor, checks the fit and cartridges, and doesn't go back until it's fixed.
- Red flags
- Keeps working to finish the room.
Walk me through how you'd load a dumpster so it holds the most and is safe to haul.
Technical · Loading a dumpster
- Strong answer
- Puts heavy, flat items on the bottom, breaks down bulky pieces, fills evenly, keeps it below the top edge, and keeps banned items out.
- Red flags
- Throws things in wherever and piles them high.
Tell me about a time at work, school or volunteering when you finished a dirty or unpleasant job without being reminded.
Behavioral · Work ethic
- Strong answer
- Gives a specific example and why they followed through.
- Red flags
- Can't give an example or needed constant reminders.
Tell me about a time at work, school or volunteering when you were asked to do something you didn't know how to do.
Behavioral · Asking for help
- Strong answer
- Asked questions, watched someone first, and checked their work.
- Red flags
- Guessed and hoped for the best.
Work exercise: Sort and load
Where your safety rules allow, give the candidate a short supervised task in your yard: sort a made-up debris pile into metal, wood, concrete and items to set aside, then load the right items into a dumpster in [20] minutes. Watch PPE use, careful handling, sorting and whether they ask questions.
Start Hiring Now.
Tell us who you need to hire. Compare plans, then work with HireBus to set up your first role.

We're tracking to rapidly onboard 6 or 7 technicians with only 2 months left in the season.Michael & Brittany Parker, Master Pro Service
Plan details, setup costs, and advertising spend · See pricing

