Concrete & masonry interview questions

132 interview questions for the 22 roles a $20M business in this industry hires for, from leadership to the field. Each role has job-related questions, what strong and weak answers sound like, and a short work exercise.

22 roles. Open one to see its questions, or open them all.

Chief Executive Officer

6 questions · Choose where to grow
Job description
  1. Your residential crews are booked solid, and a general contractor invites you to bid foundations and walls on a large commercial project. How do you decide?

    Situational · Entering commercial work

    Strong answer
    Weighs forming and crew experience, insurance and bonding needs, retainage and payment terms, inspection requirements, and the effect on residential customers, and might start with a smaller job.
    Red flags
    Bids because it's big, without checking capability or cash.
  2. How do you decide which work to keep in-house and which to subcontract, like pumping, excavation or saw cutting?

    Technical · Make or buy decisions

    Strong answer
    Compares margin, how often the service is needed, schedule control, equipment cost, and quality risk, and revisits the decision as volume changes.
    Red flags
    Keeps everything in-house on principle or subs everything out to avoid hassle.
  3. Competitors advertise lifetime warranties on driveways, and your sales team wants you to match. How do you decide?

    Situational · Setting warranty policy

    Strong answer
    Looks at callback history and cost by job type, separates what the company controls (base, joints, mix, curing) from what it can't (deicing salts, soil movement, roots), has counsel review terms, and writes a clear limited warranty.
    Red flags
    Matches the lifetime promise to win jobs without pricing the risk or defining what's covered.
  4. Tell me about a time you added a service line, like decorative concrete or masonry repair, or moved into a new market.

    Behavioral · Growth decisions

    Strong answer
    Names the demand and margin they expected, the crews, equipment and pricing they set up, what fell short, such as crew skill or lead flow, and what they changed or stopped.
    Red flags
    Only shares wins or can't explain why it was chosen.
  5. Tell me about a time you developed a finisher or mason into a manager. What did you do to get them ready?

    Behavioral · Developing leaders

    Strong answer
    Gave them responsibility in steps, taught estimating or scheduling, coached them on leading former peers, and judged readiness by results.
    Red flags
    Promoted the best tradesperson and left them to figure it out.
  6. Tell me about a decision you made to protect crews from silica dust or heat that cost the business money.

    Behavioral · Investing in crew safety

    Strong answer
    Gives a specific example, such as buying saws with water or vacuum controls or changing pour times, and explains why it was worth it.
    Red flags
    Can't name one, or treats safety rules as paperwork.

Work exercise: Choose where to grow

Give finalists a one-page made-up snapshot: revenue and margin for flatwork, decorative and masonry, crew count, warranty claims by crew, and a general contractor's bid invitation. Ask them to say which line to grow, which to fix, and whether to bid the commercial job in [30] minutes.

Chief Operating Officer

6 questions · Plan a sample pour week
Job description
  1. Walk me through the standard steps you'd want every flatwork crew to follow, from setting forms to curing.

    Technical · Standard procedures

    Strong answer
    Names layout and form checks, a compacted subgrade, reinforcement on chairs, a pre-pour checklist, checking tickets, no water beyond the mix design, finish timing, jointing, curing and photos.
    Red flags
    Trusts each crew lead to do it their own way.
  2. Two crews pour similar driveways, but one uses more concrete and more labor hours every time. What do you do?

    Situational · Comparing crew performance

    Strong answer
    Compares subgrade and form accuracy, since overdigging adds yards, crew size and methods, visits both crews, and spreads the better practice.
    Red flags
    Assumes the slower crew is lazy.
  3. A heat wave is coming with a full week of pours scheduled. What changes do you make?

    Situational · Hot-weather planning

    Strong answer
    Moves pours to early morning, adds finishers, uses evaporation retarder and windbreaks, starts curing right away, and puts a heat illness plan in place with water, rest and shade.
    Red flags
    Keeps the schedule and tells crews to push through.
  4. Tell me about a time you used production data to change how concrete or masonry crews were staffed or scheduled.

    Behavioral · Data-driven staffing

    Strong answer
    Names the data, like square feet finished per crew hour or yards placed per day by crew, the staffing or schedule change it drove, and the measured change in hours, overtime or callbacks.
    Red flags
    Has never used data to make staffing decisions.
  5. Tell me about a time you dealt with a crew leader whose work was fast but sloppy.

    Behavioral · Addressing quality

    Strong answer
    Showed specific examples, set a clear standard, checked the next jobs, and followed through on consequences.
    Red flags
    Let it go because production was high.
  6. Tell me about a time you improved safety on concrete or masonry crews and measured whether it worked.

    Behavioral · Improving safety

    Strong answer
    Names a specific change, like water or vacuum controls on saws, scaffold or form-bracing checks, or daily pre-pour safety talks, and the measure: incidents, near-miss reports or audit findings before and after.
    Red flags
    Talks only about posters or meetings.

Work exercise: Plan a sample pour week

Give finalists a made-up week: [eight] pours, [three] crews, two pump bookings, a hot day and a rain day in the forecast, and one crew short a finisher. Ask them to plan the week and list the standards they would check on each pour in [30] minutes.

Chief Financial Officer

6 questions · Find the leak in sample job costs
Job description
  1. Walk me through how you'd measure profit by job type: plain flatwork, stamped decorative work and masonry.

    Technical · Profit by job type

    Strong answer
    Costs each job by labor hours, yards of concrete including waste, materials, pump and equipment, and a fair share of overhead, then compares margins by type against the estimates.
    Red flags
    Looks only at company-wide profit.
  2. Ready-mix prices rise mid-season, and you have dozens of signed jobs priced at last year's cost. What do you do?

    Situational · Material price risk

    Strong answer
    Measures the exposure, checks contracts for price adjustment terms, asks the supplier about price locks, adjusts pricing on new bids, and adds escalation language going forward.
    Red flags
    Absorbs it and hopes or tries to rebill signed customers without a contract basis.
  3. How do you manage cash in a concrete business that slows down in winter?

    Technical · Seasonal cash flow

    Strong answer
    Builds a monthly cash forecast, collects deposits, keeps receivables tight, sets up a credit line before it's needed, and times equipment purchases around the season.
    Red flags
    Manages from the bank balance.
  4. Operations wants to buy a concrete pump instead of hiring pump trucks. How do you evaluate it?

    Situational · Equipment investment

    Strong answer
    Compares pump rental costs per pour to ownership, including an operator, maintenance, insurance and expected use, and weighs scheduling control.
    Red flags
    Decides on gut feel or price alone.
  5. Tell me about a time you found a cost leak in a construction business.

    Behavioral · Finding cost leaks

    Strong answer
    Names the leak, such as concrete waste, short-load fees or unbilled extras, how they found it, and how much it saved.
    Red flags
    Speaks only in general terms.
  6. Tell me about a time you had to tell owners that a busy season still lost money. What did you recommend?

    Behavioral · Delivering bad news

    Strong answer
    Presented early with clear numbers, explained causes, and came with options and a recommendation.
    Red flags
    Delayed the news or presented problems without a plan.

Work exercise: Find the leak in sample job costs

Give finalists made-up job costs for [ten] finished jobs across flatwork, decorative and masonry: estimate, actual labor, yards ordered against yards needed, and pump costs. Ask them to find where money is leaking and recommend two changes in [30] minutes.

General Manager

6 questions · Rank the problems
Job description
  1. Callbacks for scaling and cracking are up, and crews blame the ready-mix supplier. What do you do?

    Situational · Root cause on callbacks

    Strong answer
    Pulls delivery tickets and job records, compares by crew, supplier and weather, brings in the supplier's technical rep, and fixes either the practices or the supplier.
    Red flags
    Switches suppliers without data or accepts the crews' story.
  2. Walk me through how you'd review a finished job to see whether it made money.

    Technical · Job profitability review

    Strong answer
    Compares estimated to actual crew hours, yards ordered to yards used, pump and rental costs, rework, and whether change orders were billed.
    Red flags
    Checks only whether the customer paid.
  3. Sales is booking stamped patios faster than your one decorative crew can install them. What do you do?

    Situational · Capacity planning

    Strong answer
    Gives honest lead times, trains a second crew, considers subcontracting or a price increase, and aligns sales with capacity.
    Red flags
    Lets the backlog grow and customers wait without updates.
  4. Tell me about a time you raised prices on concrete or masonry work while your sales team pushed back.

    Behavioral · Raising prices

    Strong answer
    Explains the cost data behind it, how they prepared the sales team, and the effect on close rates and margin.
    Red flags
    Never raised prices or did it with no plan.
  5. Tell me about a time a quality problem traced back to a handoff between sales, the office and the field, like the wrong color or pattern reaching the crew.

    Behavioral · Cross-department fixes

    Strong answer
    Brought sales, office and field together, traced where the selection or scope got lost, changed the process with written selections and a pre-pour sign-off, and checked that the error stopped.
    Red flags
    Fixed it in one department and blamed another.
  6. Tell me about a time a customer pushed you to pour before the weather or subgrade was ready, and you held the line.

    Behavioral · Standing behind standards

    Strong answer
    Explained the risk in plain words, like frozen subgrade or rain on a fresh finish, offered the next safe date, put it in writing, and kept the customer where possible.
    Red flags
    Poured anyway to keep the customer happy.

Work exercise: Rank the problems

Give finalists a made-up monthly dashboard: revenue per project, callbacks by crew, completion times, and two customer complaints. Ask them to rank the problems and explain their plan as they would to the owner in [30] minutes.

Field Supervisor

6 questions · Find the problems before the pour
Job description
  1. Walk me through your check on a slab before you call for concrete.

    Technical · Pre-pour check

    Strong answer
    Checks forms for grade and bracing, layout square by diagonals, subgrade compacted and damp but not muddy, vapor retarder where called for, reinforcement on chairs with right cover and laps, and inspection passed.
    Red flags
    Looks it over quickly and calls the plant.
  2. The first truck has been in the drum a long time and the mix looks stiff. The crew wants to add water. What do you do?

    Situational · Added water

    Strong answer
    Checks the ticket for batch time and mix, adds water only within the mix design limits and company rules, rejects the load if it's out of spec, and calls the plant.
    Red flags
    Lets the crew add water until it's easy to work.
  3. Halfway through a wall pour, a form starts to bulge. What do you do?

    Situational · Form failure

    Strong answer
    Stops placing at that section, keeps people clear, braces it right away, slows the pour rate, and documents what failed.
    Red flags
    Keeps pouring and hopes it holds.
  4. How do you decide where, when and how deep to cut control joints on a new driveway?

    Technical · Control joints

    Strong answer
    Follows the plan spacing with panels close to square, adds joints at corners, cuts about a quarter of the slab depth, and saws as soon as the edges won't ravel.
    Red flags
    Cuts the next week, or as shallow as possible to save blades.
  5. Tell me about a time you rejected a pour or finished slab that didn't meet the standard.

    Behavioral · Enforcing quality

    Strong answer
    Explains what was wrong, why it couldn't stay, how they told the crew and customer, and what changed afterward.
    Red flags
    Let bad work stay to save time.
  6. Tell me about a time a pour got pushed by weather, a failed inspection or a late truck, and you kept the homeowner in the loop.

    Behavioral · Communicating delays

    Strong answer
    Called the customer before they noticed, explained the cause and the new date, said what it meant for their driveway access or yard, and followed up when promised.
    Red flags
    Let the office find out from the customer.

Work exercise: Find the problems before the pour

Give finalists made-up drawings for a garage slab and photos of the formed slab with [four] planted problems, such as missing chairs, a low form, no isolation joint at the house, and steel too close to the edge. Ask them to find the problems and say what they would fix before calling the plant in [15] minutes.

HR Manager

6 questions · Work a turnover case
Job description
  1. You need [three] experienced concrete finishers before the season starts, and the good ones are already working. What do you do?

    Situational · Recruiting finishers

    Strong answer
    Checks pay against the market, uses referrals and trade programs, builds a path to promote laborers, adds a hands-on skills test, and moves fast on offers.
    Red flags
    Posts an ad and waits.
  2. Walk me through how you'd run a silica dust program for crews who cut concrete, block and pavers.

    Technical · Silica program

    Strong answer
    A written exposure control plan, the controls OSHA's silica rule lists for each tool, like water or vacuum saws, a competent person, training, a respirator program where needed, and records.
    Red flags
    Hands out dust masks and calls it done.
  3. A crew lead reports that a laborer seemed impaired on site this morning. What do you do?

    Situational · Fitness-for-duty concerns

    Strong answer
    Removes the person from work safely, documents what was observed, follows the written policy on testing, arranges a safe ride, and keeps it confidential.
    Red flags
    Ignores it or fires the person based on rumor.
  4. How do you plan heat illness prevention for crews working on hot slabs all summer?

    Technical · Heat illness prevention

    Strong answer
    Water, rest and shade, easing new and returning workers into the heat, training on signs, a buddy system, and an emergency plan, plus checking local rules.
    Red flags
    Tells people to drink water.
  5. Tell me about a training path you built that moved people up in a trade.

    Behavioral · Building career paths

    Strong answer
    Describes the skill steps, how progress was checked, pay steps, and how many people moved up.
    Red flags
    Training was informal and unmeasured.
  6. Tell me about a time you handled a complaint against a well-liked crew leader.

    Behavioral · Complaints about popular leaders

    Strong answer
    Investigated fairly, protected the person who complained from retaliation, documented, and acted on the facts.
    Red flags
    Dismissed it because the leader was valuable.

Work exercise: Work a turnover case

Give finalists a made-up case: a new laborer quit after two weeks saying the crew lead yelled at them, and [three] others quit from the same crew this year. Ask them to say what they would investigate and what they would recommend in [20] minutes.

Marketing Manager

6 questions · Plan a year of spend
Job description
  1. Walk me through how you'd show decorative concrete and masonry work online so it brings in buyers.

    Technical · Showing decorative work

    Strong answer
    Uses good photos and short videos, before and after shots, a gallery by pattern and color, reviews, a current Google Business Profile, and pages for each service and town.
    Red flags
    Posts the same stock images as every competitor.
  2. Leads spike in spring and dry up in late fall. How would you plan the year?

    Situational · Seasonal planning

    Strong answer
    Runs early pre-booking campaigns, shifts winter spend to masonry or commercial work, and doesn't generate leads the crews can't serve.
    Red flags
    Spends evenly every month.
  3. How do you measure revenue per lead and use it to choose where to spend?

    Technical · Revenue per lead

    Strong answer
    Tracks source to won jobs and revenue in the CRM, compares revenue and cost per lead by channel, and shifts budget accordingly.
    Red flags
    Counts leads only.
  4. A customer posts a one-star review about cracks in their new driveway. What do you do?

    Situational · Responding to reviews

    Strong answer
    Gets the project manager involved to inspect, replies publicly with calm facts and an offer to talk, and moves the conversation offline.
    Red flags
    Argues in public or asks the customer to remove it in exchange for something.
  5. Tell me about a referral or partner program you built.

    Behavioral · Referral partnerships

    Strong answer
    Names partners like landscapers, pool builders or home builders, how they set it up, and the leads it brought.
    Red flags
    Has never built one.
  6. Tell me about a time marketing and operations disagreed about a promotion. How did it end?

    Behavioral · Working with operations

    Strong answer
    Listened to the capacity concern, adjusted the offer or timing, and agreed on a plan both could support.
    Red flags
    Ran it anyway and let operations deal with it.

Work exercise: Plan a year of spend

Give finalists a made-up year of leads by month and source, with close rates and average job size for flatwork, decorative and masonry. Ask them to plan next year's spend by quarter and explain why in [25] minutes.

Office Manager

6 questions · Sort a billing stack
Job description
  1. Walk me through the job file you'd keep for a stamped patio, from sale to final payment.

    Technical · Job file setup

    Strong answer
    Signed contract, written selections for pattern, color and sealer, deposit, permit, locate ticket, pour date, delivery tickets, change orders, photos, final invoice and the care sheet.
    Red flags
    Keeps only the contract and invoice.
  2. The crew poured an extra walkway the customer asked for on site, but there's no signed change order. What do you do?

    Situational · Unsigned extra work

    Strong answer
    Gets the project manager to confirm the scope and price with the customer in writing right away, bills it, and reinforces the no-extra-work-without-signature rule.
    Red flags
    Bills it without paperwork or writes it off.
  3. You realize a footing inspection was never booked, and the pour is set for tomorrow. What do you do?

    Situational · Missed inspection

    Strong answer
    Books the inspection, tells the project manager and dispatcher to hold the pour and ready-mix, updates the customer, and adds the step to a checklist.
    Red flags
    Hopes the inspector won't notice.
  4. How do you keep track of subcontractor and supplier certificates of insurance?

    Technical · Insurance certificates

    Strong answer
    Keeps a log with coverages and expiration dates, sends reminders, and makes sure no one works or gets paid with an expired certificate.
    Red flags
    Collects them once and never checks again.
  5. Tell me about a time you fixed a mix-up that kept happening between the office and crews, like wrong addresses, missing selections or unbilled extras.

    Behavioral · Office-field communication

    Strong answer
    Names the mix-up, the tool or habit they set up, such as job sheets, photo uploads or a daily call, and how often the error happened afterward.
    Red flags
    Blames the field for not communicating.
  6. Tell me about a time several managers needed urgent things from you at once.

    Behavioral · Juggling priorities

    Strong answer
    Sorted by impact and deadline, told each person when to expect it, and delivered.
    Red flags
    Did whatever the loudest person wanted.

Work exercise: Sort a billing stack

Give finalists a made-up stack: a signed contract, a change order missing a signature, [six] ready-mix tickets, a permit card and an expired supplier insurance certificate. Ask them to sort what's ready to bill, what's missing and who they would call in [20] minutes.

Operations Manager

6 questions · Rebuild two weeks
Job description
  1. Next week is full of pours, and the forecast shows a cold snap with freezing nights. How do you plan?

    Situational · Cold-weather scheduling

    Strong answer
    Decides which pours can go with blankets, heat or a mix adjustment, never pours on frozen ground, reschedules the rest early, and tells customers why.
    Red flags
    Pours as scheduled without protection.
  2. Walk me through how you'd schedule pours so crews and pump trucks aren't sitting idle.

    Technical · Pour scheduling

    Strong answer
    Staggers pour times, has forms and inspections done the day before, books pumps around them, plans travel, and preps the next job during cure time.
    Red flags
    Schedules one job at a time with no look ahead.
  3. A customer is angry their new patio doesn't match the color of a neighbor's patio you poured last year. What do you do?

    Situational · Customer color complaint

    Strong answer
    Visits, compares the job records for color, supplier and sealer, explains honestly why color varies, and offers options that fit the contract.
    Red flags
    Promises a redo on the phone or dismisses the complaint.
  4. How do you track and cut rework across crews?

    Technical · Reducing rework

    Strong answer
    Logs every callback with cause, crew and job, reviews patterns monthly, and targets training or checklists at the top causes.
    Red flags
    Handles each callback as a one-off.
  5. Tell me about a time you had to move crew members who didn't want to be moved.

    Behavioral · Moving people

    Strong answer
    Explained why, listened to concerns, made it fair, and checked in afterward.
    Red flags
    Ordered it with no explanation.
  6. Tell me about a time you changed how your company handles weather and inspection reschedules so customers stopped being caught off guard.

    Behavioral · Reschedule communication

    Strong answer
    Names the change, like a rain-day policy, a set call-ahead time or dispatch text updates, who owned it, and the drop in complaints or same-day cancellations.
    Red flags
    Leaves each crew lead to call customers however they like.

Work exercise: Rebuild two weeks

Give finalists a made-up two-week schedule: [12] pours, [four] masonry jobs, [three] crews, one pump truck, a cold forecast and an inspection backlog. Ask them to rebuild the schedule and list the customer calls they would make in [25] minutes.

Production Manager

6 questions · Find the production problem
Job description
  1. Walk me through how you set up a mixing station so every batch of mortar comes out the same.

    Technical · Consistent mortar batches

    Strong answer
    Measures sand and mix by bucket or box instead of by shovel, uses the same water and mixing time, keeps the mixer clean, sets retempering and discard rules, and controls dust from bagged material.
    Red flags
    Lets each laborer mix by feel.
  2. How do you track material use so you know whether a crew is wasting concrete?

    Technical · Tracking concrete use

    Strong answer
    Compares yards ordered to the plan quantity with a set allowance, tracks short loads and returned concrete, and checks subgrade accuracy when overruns repeat.
    Red flags
    Doesn't compare orders to plans.
  3. A power trowel dies in the middle of finishing a large slab. What do you do?

    Situational · Equipment failure mid-pour

    Strong answer
    Gets a backup or rental moving, puts more hands on hand finishing in the most critical areas, and adds spare equipment checks to the pre-pour list.
    Red flags
    Waits for a repair while the slab sets.
  4. On a site visit, you see a laborer dry-cutting pavers with no dust control. What do you do?

    Situational · Enforcing dust controls

    Strong answer
    Stops it right away, explains why, gets a water or vacuum saw, talks with the crew lead about why it happened, and documents it.
    Red flags
    Mentions it later or lets it finish.
  5. Tell me about an on-site training you ran that changed how a crew worked.

    Behavioral · On-site training

    Strong answer
    Names the topic, how they taught it hands-on, and what changed afterward.
    Red flags
    Training was reading a handout aloud.
  6. Tell me about a time you had to choose between finishing a pour on schedule and doing it right.

    Behavioral · Speed versus quality

    Strong answer
    Names the situation, like a late truck pushing finishing into heat or dark, the call they made, such as cutting the pour back, adding finishers or setting a construction joint, and how they told the crew and customer.
    Red flags
    Always chose speed.

Work exercise: Find the production problem

Give finalists a made-up production report for [five] jobs: yards ordered against plan quantity, crew hours, rework notes and one equipment breakdown. Ask them to find the biggest problem and plan a [10]-minute crew briefing on it, all in [20] minutes.

Project Manager

6 questions · Plan to pour day
Job description
  1. Walk me through the handoff when a stamped patio is sold, from the rep's notes to pour day.

    Technical · Sold job handoff

    Strong answer
    Reviews layout, thickness, reinforcement and finish with the rep, confirms pattern, color and sealer in writing, pulls permits, books locates and inspections, and orders materials.
    Red flags
    Schedules the crew straight from the contract.
  2. The 811 marks are in, but the homeowner mentions sprinkler lines and a buried wire to a garage light where the new driveway goes. What do you do?

    Situational · Private lines

    Strong answer
    Knows 811 doesn't mark private lines, has them found by a private locator or the owner, marks them, plans hand digging near them, and writes any relocation up as a change order.
    Red flags
    Assumes the 811 marks cover everything and digs.
  3. While digging for a retaining wall footing, the crew hits rock that wasn't in the estimate. What do you do?

    Situational · Change orders

    Strong answer
    Stops that work, documents it with photos, prices the change, gets it signed before going on, and explains options to the customer.
    Red flags
    Removes the rock and bills it later.
  4. What do you tell a homeowner about caring for new concrete after the pour?

    Technical · Customer care instructions

    Strong answer
    Gives written guidance on foot and vehicle traffic, curing and sealing, avoiding deicing salts the first winter, and what cracks at joints mean.
    Red flags
    Tells them it's done and leaves.
  5. Tell me about a job where profit came in below estimate. What did you find and change?

    Behavioral · Job profit review

    Strong answer
    Names the cause, such as waste, extra hours or unbilled changes, and a specific change made.
    Red flags
    Doesn't know why.
  6. Tell me about a time a homeowner was unhappy with a finished patio, driveway or wall and you had to decide between repair, replacement or standing behind the work.

    Behavioral · Resolving dissatisfaction

    Strong answer
    Inspected with the customer, compared the work to the contract and written standards, explained honestly what was and wasn't a defect, put a fair fix in writing, and closed it out.
    Red flags
    Avoided the customer, or promised a full redo just to end the call.

Work exercise: Plan to pour day

Give finalists a made-up sold job: a stamped patio with a seat wall, a sketch, color and pattern selections, and a rain forecast. Ask them to list, in order, everything they would confirm, order and book before pour day in [25] minutes.

Sales Manager

6 questions · Coach from the numbers
Job description
  1. Crews keep finding sold jobs that don't match the site: old concrete left out of the price, no truck access, or a slope the rep missed. What do you do?

    Situational · Site checks before selling

    Strong answer
    Pulls the problem jobs by rep, builds a required site checklist with photos and measurements, has the project manager review before scheduling, and coaches the reps who keep missing items.
    Red flags
    Tells crews to make it work or blames the field.
  2. Walk me through how you'd set pricing guidelines for reps on flatwork versus stamped work.

    Technical · Pricing guidelines

    Strong answer
    Builds price from labor, materials with waste, equipment and overhead for each type, sets a minimum job charge and margin floors, and requires approval for discounts.
    Red flags
    Lets reps price by feel or by matching competitors.
  3. Spring leads double and reps can't get to estimates for over a week. What do you do?

    Situational · Handling lead surges

    Strong answer
    Triages by job size and readiness, uses photos for early pricing where possible, adds estimating help, and gives honest timelines.
    Red flags
    Lets leads sit until they go elsewhere.
  4. Tell me about a salesperson you hired for concrete or masonry work who didn't work out. What did you change in how you hire?

    Behavioral · Hiring sales talent

    Strong answer
    Owns the miss and names a specific change, like a role-play or ride-along before hiring.
    Red flags
    Blames the person only.
  5. Tell me about a time you improved a team's close rate on in-home concrete or masonry estimates.

    Behavioral · Improving close rate

    Strong answer
    Names the starting point, what they changed, and the measured result.
    Red flags
    No numbers or a vague story.
  6. Which numbers do you review with each rep every week, and why?

    Technical · Weekly rep metrics

    Strong answer
    Leads, appointments run, close rate, average sale, margin per sale and follow-up activity, and what each tells them.
    Red flags
    Looks only at total sales.

Work exercise: Coach from the numbers

Give finalists a made-up month of results for [four] reps: leads, appointments, close rate, average sale and margin. Ask them to pick which rep needs coaching most, what they would coach, and how they would measure it in [25] minutes.

Warehouse Manager

6 questions · Plan a load-out
Job description
  1. Walk me through how you'd organize the yard so crews load the right forms, rebar and tools for tomorrow's jobs.

    Technical · Staging for jobs

    Strong answer
    Stages each job the night before from a pick list, labels areas, checks quantities against the job, and confirms with crew leads.
    Red flags
    Lets crews grab what they think they need in the morning.
  2. A rebar delivery shows up with the wrong bar size for a footing pour tomorrow. What do you do?

    Situational · Wrong delivery

    Strong answer
    Checks it against the order and plans, refuses or documents it, gets the supplier to swap it today, and tells the project manager and dispatcher.
    Red flags
    Sends it out and lets the crew figure it out.
  3. A yard worker is moving pallets of block on a forklift, and you have no training record for them. What do you do?

    Situational · Forklift safety

    Strong answer
    Stops them, arranges forklift training and evaluation, documents it, and checks records for others.
    Red flags
    Lets it go since they seem to know what they're doing.
  4. How do you keep power trowels, saws and mixers ready so they don't fail on pour day?

    Technical · Equipment readiness

    Strong answer
    Cleans concrete off after each use, follows a service schedule, keeps spare parts, and tags out broken tools until they're fixed.
    Red flags
    Fixes things when crews complain.
  5. Tell me about a time you got materials and tools to job sites on time more often.

    Behavioral · On-time deliveries

    Strong answer
    Names what caused late arrivals, like morning loading or no pick lists, the fix, such as night-before staging and set load-out times, and how many late starts dropped.
    Red flags
    Blames suppliers only.
  6. Tell me about a time you had to enforce a safety rule in a warehouse or yard.

    Behavioral · Enforcing yard safety

    Strong answer
    Explains the rule, how they enforced it fairly, and how behavior changed.
    Red flags
    Avoided the conflict.

Work exercise: Plan a load-out

Give finalists a made-up list of tomorrow's [five] jobs and a yard inventory sheet with [three] shortages. Ask them to build the load-out plan, flag the shortages and say who they would call in [20] minutes.

Customer Service Representative

6 questions · Handle three sample calls
Job description
  1. A caller wants a price for a new patio over the phone. Walk me through the call.

    Situational · Taking a quote request

    Strong answer
    Asks about size, location, truck access, old concrete to remove, finish type and timing, explains that an estimator needs to see it, and books a visit.
    Red flags
    Guesses a price or rushes to book without basic details.
  2. The day after a pour, a customer calls asking if they can park on their new driveway this weekend. What do you say?

    Situational · Giving care instructions

    Strong answer
    Gives the company's written care guidance or checks with the project manager, explains why waiting matters, and doesn't guess.
    Red flags
    Says it should be fine without checking.
  3. A customer calls upset about hairline cracks in a driveway poured two months ago. What do you do?

    Situational · Handling complaints

    Strong answer
    Listens, asks for photos and job details, says someone will look at it without diagnosing over the phone, books a project manager visit, and logs it.
    Red flags
    Tells them cracks are normal and ends the call, or promises a free replacement.
  4. Walk me through how you'd book estimate appointments so estimators aren't driving across town all day.

    Technical · Scheduling estimates

    Strong answer
    Groups appointments by area and day, leaves buffer time, confirms the day before, and collects photos and details ahead.
    Red flags
    Books whatever time the customer asks for.
  5. Tell me about a time you turned around a caller who was angry that a crew or estimator didn't show when promised.

    Behavioral · Calming frustrated callers

    Strong answer
    Listened without interrupting, apologized for the miss, found out the real reason from dispatch, gave a firm new time, and called back when promised.
    Red flags
    Got defensive or passed them along.
  6. Tell me about a time a check-in call after a job turned up a problem the customer hadn't reported, like a crack, a cleanup miss or lawn damage.

    Behavioral · Follow-up after service

    Strong answer
    Got details and photos, logged it, sent it to the project manager with a deadline, told the customer when they'd hear back, and confirmed it was closed out.
    Red flags
    Noted it and never checked back.

Work exercise: Handle three sample calls

Role-play three made-up calls in [15] minutes: a patio quote request, a customer asking when they can drive on new concrete, and a crack complaint. Ask the candidate to handle each and book or log the next step in a sample calendar.

Dispatcher

6 questions · Build a sample day
Job description
  1. It's [6 a.m.]. The pump operator for a [9 a.m.] pour calls in sick. What do you do?

    Situational · Losing a pump operator

    Strong answer
    Calls the pump company for a backup, asks the supervisor if the pour can be placed another way, and tells the ready-mix plant the new time before anything is batched.
    Red flags
    Lets the concrete arrive with no way to place it.
  2. The forms failed inspection, the inspector can't return until tomorrow, and ready-mix is ordered for this morning. What do you do?

    Situational · Failed inspection

    Strong answer
    Cancels or moves the order before it's batched, moves the crew to other work, updates the project manager and customer, and logs it.
    Red flags
    Forgets the ready-mix order or lets the crew pour anyway.
  3. Rain starts mid-morning on a day with two flatwork pours. How do you handle it?

    Situational · Weather calls

    Strong answer
    Talks with each supervisor about where the pour stands, makes sure plastic is on site, moves pours that haven't started before batching, and reschedules customers.
    Red flags
    Waits to see what happens.
  4. Walk me through how you decide which crew gets a stamped patio, a plain driveway or a block wall on a busy day.

    Technical · Matching crews to jobs

    Strong answer
    Matches skills like stamping, color or block work, crew size to pour size and finishing time, equipment and pump needs, distance between jobs, inspection times and pour start times so finishers aren't racing the set.
    Red flags
    Assigns by who's free next.
  5. Tell me about a morning when several pours or crew assignments changed at once.

    Behavioral · Handling many changes

    Strong answer
    Sorted by what was already batched or about to be, called the plant and pump first, then crews and customers, and kept the board current so no one went to the wrong job.
    Red flags
    Got overwhelmed and lost track of commitments.
  6. Tell me about a time a finishing crew lead pushed back on a pour time you set.

    Behavioral · Working with crew leads

    Strong answer
    Listened to the lead's reasons (crew size, heat, distance between pours), explained the plant, pump and customer limits, changed it when the lead was right, and escalated respectfully when it couldn't change.
    Red flags
    Gave in every time or refused to listen.

Work exercise: Build a sample day

Give finalists a made-up board: [four] crews, [six] jobs including two pours, a stamped patio and a block wall, one pump booking, and rain forecast for the afternoon. Ask them to build the day and say what they would tell the ready-mix plant in [20] minutes.

Bookkeeper

6 questions · Check a supplier invoice
Job description
  1. Walk me through how you check a ready-mix supplier's invoice before it gets paid.

    Technical · Checking ready-mix invoices

    Strong answer
    Matches each delivery ticket to the invoice by job, yards, mix and add-ons like fiber or color, checks short-load and wait-time charges, codes it to the right job, and sends disputes to the project manager.
    Red flags
    Pays the statement total without matching tickets.
  2. A customer pays a deposit on a stamped patio that won't be poured for six weeks. How do you record it?

    Technical · Customer deposits

    Strong answer
    Records it as a customer deposit owed until the work is done, not as revenue, tracks it by job, and applies it to the final invoice.
    Red flags
    Books it as sales right away.
  3. A homeowner refuses to pay the final invoice because of a crack in their new driveway. What do you do?

    Situational · Handling payment disputes

    Strong answer
    Stays polite, doesn't argue about the concrete, gets the project manager to inspect and document, checks the contract terms, and keeps a record of every contact.
    Red flags
    Argues about whether the crack is normal or threatens collections right away.
  4. The brick supplier's statement charges you for pallets your crews say they returned. What do you do?

    Situational · Supplier credits

    Strong answer
    Asks the warehouse for return slips, matches them to the charges, requests credit for the returns with proof, and sets up a way to track pallet returns.
    Red flags
    Pays the charges to keep things simple.
  5. Tell me about a time you took over a contractor's books that were months behind.

    Behavioral · Getting books current

    Strong answer
    Reconciled bank and card accounts first, matched open supplier tickets and customer invoices job by job, cleared the backlog oldest first, and set a weekly close so it stayed current.
    Red flags
    Patched things at month end without fixing the cause.
  6. Tell me about a habit or system you set up that cut overdue payments on finished driveway, patio or masonry jobs.

    Behavioral · Reducing overdue receivables

    Strong answer
    Names a specific change, like invoicing the day the job is finished or a set reminder schedule, and how much the overdue balance or days to collect dropped.
    Red flags
    Has no system beyond waiting.

Work exercise: Check a supplier invoice

Give finalists made-up ready-mix delivery tickets for [eight] loads, the supplier's invoice with one load billed twice and one wrong mix price, a brick pallet return slip, and a customer deposit. Ask them to flag the errors and post the deposit correctly in [25] minutes.

Inventory Specialist

6 questions · Build a sample order
Job description
  1. Walk me through how you'd store bagged cement, mortar mix and color hardener so none of it goes bad.

    Technical · Storing bagged materials

    Strong answer
    Keeps it dry, off the ground on pallets and covered, uses oldest first, checks bag dates, and pulls hardened or damp bags.
    Red flags
    Stacks it wherever there's room.
  2. A crew calls from a stamped patio job: the color release on the truck doesn't match what the customer picked. What do you do?

    Situational · Wrong product delivered

    Strong answer
    Checks the selection record, tells the crew not to use it, gets the right product sent fast, tells the project manager, and finds where the error started.
    Red flags
    Tells them it's close enough.
  3. Your count shows plenty of rebar chairs, but crews keep saying they run out. What do you do?

    Situational · Stock that disappears

    Strong answer
    Checks where stock is going, sets truck stock levels, tracks what each crew takes, and corrects the record.
    Red flags
    Orders more without finding out why.
  4. How do you order brick or stone so a job doesn't run short or end up with mismatched color?

    Technical · Ordering matched lots

    Strong answer
    Orders the full quantity plus waste at once, checks lot or run numbers, tells crews to blend from several pallets, and holds extras for repairs.
    Red flags
    Orders a little at a time as needed.
  5. Tell me about a time you cut waste on bagged materials, rebar or forming supplies.

    Behavioral · Cutting waste

    Strong answer
    Names the waste, the cause, such as damp storage or overordering, the change, and the result.
    Red flags
    Says waste is part of the job.
  6. Tell me about a time you caught a supplier's mistake before it reached a job.

    Behavioral · Catching supplier errors

    Strong answer
    Describes a receiving check, like matching brick lot numbers, bag counts or rebar size to the order, and how they got the supplier to correct it before the crew loaded out.
    Red flags
    Found out when the crew called.

Work exercise: Build a sample order

Give finalists a made-up inventory sheet and next week's jobs: two block walls, a stamped patio and [three] driveways. Ask them to build the order list, flag shortages, and note which items need matching lots in [20] minutes.

Sales Representative

6 questions · Outline a proposal
Job description
  1. Walk me through how you assess an old driveway for replacement.

    Technical · Assessing a driveway

    Strong answer
    Measures, checks slope and drainage, removal and haul-off, truck access, base condition, tree roots, thickness and reinforcement, permits, and transitions at the garage and street.
    Red flags
    Measures and quotes by square foot without looking at the site.
  2. A customer asks you to promise their new driveway won't crack. What do you say?

    Situational · Honest expectations

    Strong answer
    Explains honestly that concrete cracks and joints control where, describes what the company does to limit cracking, and doesn't promise otherwise.
    Red flags
    Promises it won't crack.
  3. A customer wants a stamped patio, but their budget only covers plain concrete. What do you do?

    Situational · Working with budgets

    Strong answer
    Offers options like a smaller area, a stamped border, colored broom finish or phasing, and respects the budget.
    Red flags
    Pushes them past their budget or walks away.
  4. Walk me through how you build a quote for a block retaining wall.

    Technical · Quoting a retaining wall

    Strong answer
    Length and height, footing, drainage stone and pipe, block type, access, and whether the height or loads need an engineer or permit.
    Red flags
    Prices by face area only and skips drainage.
  5. Tell me about an estimate where the customer asked for one thing, like a new patio, but the real problem was something else, like drainage or a settling slab.

    Behavioral · Finding the real need

    Strong answer
    Asked how they use the space and what bothered them, spotted the real issue, such as water pooling or a trip hazard, and proposed a scope that fixed it, even if smaller.
    Red flags
    Sold exactly what was asked without listening.
  6. Tell me how you kept your pipeline full during a slow season.

    Behavioral · Keeping the pipeline full

    Strong answer
    Names specific actions, such as following up old quotes, partner referrals or neighbor outreach, and results.
    Red flags
    Waited for leads.

Work exercise: Outline a proposal

Give finalists a made-up homeowner request with photos: a cracked driveway and a wish for a stamped walkway. Ask them to outline a proposal with scope, options, exclusions and the questions they would ask in [25] minutes.

Rehash Specialist

6 questions · Rank and call
Job description
  1. You call a homeowner who got a driveway quote last fall and never signed. They say it was too expensive. What do you do?

    Situational · Reviving price objections

    Strong answer
    Asks what they'd want to change, offers options like phasing or a different finish, mentions scheduling for the season, and doesn't jump to a discount.
    Red flags
    Offers a discount immediately or gives up.
  2. Walk me through how you'd sort a list of hundreds of old concrete leads to decide who to call first.

    Technical · Prioritizing old leads

    Strong answer
    Sorts by how recent, job type and size, reason lost, season and area, uses CRM notes, and removes anyone who asked not to be contacted.
    Red flags
    Calls from the top of the list.
  3. A past lead says, take me off your list. What do you do?

    Situational · Do-not-contact requests

    Strong answer
    Apologizes, marks them do-not-contact in the CRM right away, and makes sure no one contacts them again.
    Red flags
    Tries one more pitch.
  4. How would you explain the difference between broom-finish and stamped concrete to someone reconsidering a patio?

    Technical · Explaining options

    Strong answer
    Covers cost, look, upkeep like resealing, and slip and comfort, in plain words, and asks what matters most to them.
    Red flags
    Pushes the more expensive one without explaining.
  5. Tell me about a time you got a customer to go ahead after they had put a project off for a season.

    Behavioral · Seasonal follow-up

    Strong answer
    Explains when and why they called back, what they offered, and why it worked.
    Red flags
    Only re-sent the old quote.
  6. Tell me about a week when you worked through a long list of old quotes and kept each call personal.

    Behavioral · Steady call quality

    Strong answer
    Prepped from notes before each call (job type, old price, reason lost), set a daily count, logged outcomes right away, and gives a call that became a sale because of a detail they remembered.
    Red flags
    Rushed through scripts.

Work exercise: Rank and call

Give finalists [ten] made-up lost leads for driveways, patios and steps, with notes such as price, timing and a cracked old driveway. Ask them to rank who to call first in [10] minutes, then role-play the first call for [10] minutes with you as a homeowner who went with a cheaper quote.

Laborer / Helper

6 questions · Learn and help
Job description
  1. Wet concrete gets inside your glove and boot, and your skin starts to burn. What do you do?

    Situational · Cement burns

    Strong answer
    Stops, takes off the wet glove and boot, rinses the skin with clean water right away, and tells the lead.
    Red flags
    Keeps working until the end of the pour.
  2. You're cutting block with a saw and the water supply stops working. What do you do?

    Situational · Dust control

    Strong answer
    Stops cutting, tells the lead, and waits until the water is fixed or a saw with dust control is available.
    Red flags
    Finishes the cuts dry because there are only a few left.
  3. A coworker tells you to spray water on the slab to make it easier to finish, but the lead said not to. What do you do?

    Situational · Following instructions

    Strong answer
    Doesn't spray the slab, tells the coworker what the lead said, and checks with the lead; may know extra water on the surface weakens it.
    Red flags
    Does whatever the closest person says.
  4. Walk me through how you'd mix a batch of mortar for a mason, or how you'd learn to.

    Technical · Mixing mortar

    Strong answer
    Uses the same measured amounts each batch, adds materials in the order the mason wants, mixes to the mason's consistency, and asks before adding water to old mortar.
    Red flags
    Eyeballs it differently every time and doesn't ask.
  5. Tell me about a time at work, school or volunteering when you did hard, repetitive work and kept the quality up.

    Behavioral · Steady effort

    Strong answer
    Gives a specific example of a long stretch of repetitive work and what they did to stay careful, like checking their work as they went.
    Red flags
    Says they cut corners when tired.
  6. Tell me about a time at work, school or volunteering when someone corrected how you did a task. What did you do?

    Behavioral · Coachability

    Strong answer
    Listened without arguing, did it the new way, and asked a question if they didn't understand why.
    Red flags
    Got defensive or kept doing it their way.

Work exercise: Learn and help

Where your safety rules allow, have the candidate hand-mix a small practice batch of mortar in a tub, or help set a short practice form in your yard, with a mason watching for [20] minutes. Teach the steps first, including gloves and eye protection. Watch how well they follow them, whether they ask questions, and whether they keep the area clean.

Lead Mason / Concrete Finisher

6 questions · Build and teach a sample
Job description
  1. Walk me through how you decide when to start floating and troweling a slab, and what you watch for as it sets.

    Technical · Finish timing

    Strong answer
    Waits for bleed water to leave instead of working it in, checks readiness by touch or footprint, watches sun and wind, and doesn't hard trowel exterior air-entrained concrete.
    Red flags
    Starts as soon as it's screeded or works water into the surface.
  2. You're repointing an old house with soft brick. Walk me through how you choose and match the mortar.

    Technical · Repointing old brick

    Strong answer
    Uses a mortar softer than the brick, often lime-rich, matches color with test samples, removes old mortar with dust controls and without chipping brick edges, and keeps new joints damp while they cure.
    Red flags
    Uses the hardest mortar available so it lasts.
  3. It's a hot, windy afternoon and the slab surface is drying and cracking faster than your crew can finish. What do you do?

    Situational · Plastic shrinkage cracking

    Strong answer
    Uses evaporation retarder or fogging, sets up wind or sun breaks, adds hands, starts curing right away, and changes the timing of the next pour.
    Red flags
    Throws water on the surface and keeps troweling.
  4. Mid-pour, the customer says the stamped color looks different from the sample. What do you do?

    Situational · Customer questions on pour day

    Strong answer
    Checks the ticket and color order, explains that color changes as it cures and is sealed, calls the project manager, and doesn't promise changes on the spot.
    Red flags
    Argues or promises to redo it.
  5. Tell me about a helper you trained to finish concrete or lay block. How did you decide when they could work without you watching?

    Behavioral · Training helpers

    Strong answer
    Taught in steps, checked specific skills like edging or keeping a line, and gave more responsibility as they showed it.
    Red flags
    Says helpers learn by watching.
  6. Tell me about a time a slab or wall your crew built had to be torn out.

    Behavioral · Owning rework

    Strong answer
    Names the real cause, like finishing bleed water into the surface, late saw cuts or a soft subgrade, owns the part they controlled, and names the change, such as a pre-pour checklist or set saw timing.
    Red flags
    Blames the weather, the plant or the crew.

Work exercise: Build and teach a sample

Where your safety rules allow, ask the candidate to lay a short block or brick course to a line, or finish a small sample slab, in [45] minutes. Ask them to explain each step to a made-up helper as they go. Judge plumb, level, joints and how well they teach.

Mason / Concrete Worker

6 questions · Lay or form a sample
Job description
  1. Walk me through how you lay a block wall so it ends up plumb, level and straight.

    Technical · Laying block to a line

    Strong answer
    Builds the corners or leads first with a level and story pole, runs a line between them, keeps bed and head joints full and even, checks often, and tools joints when they're thumbprint hard.
    Red flags
    Lays without a line and checks only at the end.
  2. Walk me through what you check on the delivery ticket when a ready-mix truck arrives.

    Technical · Checking a ready-mix ticket

    Strong answer
    Right job and address, mix and strength, slump, admixtures or color, batch time and yards, and tells the lead if anything is off.
    Red flags
    Doesn't look at the ticket.
  3. Rain starts soon after you finished a broom-finish sidewalk. What do you do?

    Situational · Rain on fresh concrete

    Strong answer
    Covers it with plastic if it can take it without marking, protects edges, tells the lead, and doesn't trowel rainwater into the surface.
    Red flags
    Leaves it or works the water in.
  4. You're laying brick and the forecast calls for freezing temperatures tonight. What do you do?

    Situational · Cold-weather masonry

    Strong answer
    Tells the lead, covers the top of the wall and new work with blankets, doesn't lay frozen or wet units, and follows the company's cold-weather steps.
    Red flags
    Leaves the wall uncovered.
  5. Tell me about a time a homeowner asked you something on the job, like when they could drive on it or why it cracked, that you couldn't answer.

    Behavioral · Talking with customers

    Strong answer
    Was polite, didn't guess, told the customer who would get back to them, and passed the question to the lead or office the same day.
    Red flags
    Guessed or brushed the customer off.
  6. Tell me about a time you caught a mistake in a layout or plan before it was built.

    Behavioral · Catching plan errors

    Strong answer
    Describes what they checked, what was wrong, and who they told.
    Red flags
    Built it as drawn knowing it was wrong.

Work exercise: Lay or form a sample

Where your safety rules allow, ask the candidate to lay [three] courses of block on a made-up layout, or set and grade a short form, in your yard in [45] minutes. Judge accuracy, joint quality, cleanliness and safe tool use.

Start Hiring Now.

Tell us who you need to hire. Compare plans, then work with HireBus to set up your first role.

Start Hiring Now
DO NOT MAKE ANOTHER HIRE WITHOUT HIREBUS this is 100% a secret weapon!!!Corey Edmonds, Pacific NW ProWash

Plan details, setup costs, and advertising spend · See pricing