Fence company operations manager job description

A fence company operations manager builds the install schedule and matches each job to a crew. They time each start to a valid locate ticket and a complete material pull, give posts time to set before gates hang, and keep crews building when weather or rock stops a job.

Median pay, other specialty trade contractors · BLS, May 2025

$102,680 a year$49.36 an hour

Annual pay: 10th percentile $51,310, middle half $75,710 to $147,200, 90th percentile $203,280. Source: BLS Occupational Employment and Wage Statistics, May 2025.

Reports to
General Manager
Department
Operations
Schedule
Weekdays 8 to 5, some overtime · Monday to Friday, 8 a.m. to 5 p.m., with occasional overtime and light on-call duty in the busiest install months
Also called
Install manager · Field operations manager · Crew scheduler · Installation operations manager

Fence company operations manager job description template

This is our Role Blueprint, word for word. Replace the highlighted fields and adjust the example targets and pay to fit your company.

Download as Word file

Fence Installation - Operations Manager

Company Name:
[INSERT COMPANY NAME HERE]
Department:
Operations
Reports to:
[General Manager]
Location:
[INSERT LOCATION HERE]

1. Position Summary

Serve as the pivotal leader responsible for allocating crews, scheduling fence installation projects, and managing daily workflows to ensure operational excellence and customer satisfaction.

2. Essential Duties and Responsibilities

  • Allocate and oversee installation crews, ensuring optimal resource utilization.
  • Develop and maintain efficient work schedules for fence installation projects.
  • Monitor daily workflow and adjust priorities to meet project deadlines.
  • Collaborate with project managers and site supervisors to resolve operational challenges.
  • Maintain clear communication with all stakeholders regarding project status and updates.

3. Key Tasks / Daily Activities

  • Review and adjust installation schedules each morning to meet service demands.
  • Conduct daily briefings with crews to outline daily tasks and safety protocols.
  • Interface with customers to confirm installation timelines and address any concerns.
  • Track project progress and update workflow management systems accordingly.

4. Key Performance Indicators (KPIs)

  • Crew Efficiency Rate: Achieve a minimum of 90% on-time project completions.
  • Installation Accuracy: Maintain a defect rate of less than 2% per project.
  • Customer Satisfaction Rating: Secure ratings greater than 4.8 stars.
  • Scheduling Efficiency: Reach a target of 95% adherence to established timelines.

5. Required Qualifications and Skills

  • Bachelor’s degree in Business Administration, Operations Management, or a related field.
  • Minimum of 3 years of experience in operations management within the home services industry.
  • Strong organizational and leadership skills with excellent communication abilities.
  • Proficiency in scheduling software and basic project management tools.

6. Preferred Experience

  • Experience in fence installation or similar home improvement project management.
  • Background in managing installation teams within a service-oriented company.
  • Previous experience working in a fast-paced, customer-centric environment.
  • Familiarity with safety regulations and procedures in outdoor project settings.

7. Physical Requirements

  • Ability to lift up to 40 lbs when required.
  • Capacity to work outdoors in varying weather conditions.
  • Frequent walking, standing, and occasional bending during site visits.
  • May require extended periods of supervision on active installations.

8. Work Environment and Schedule

  • Standard schedule: Monday through Friday, 8:00 AM to 5:00 PM with occasional overtime.
  • Flexibility to adjust hours based on project schedules and customer needs.
  • Occasional travel to various job sites is required.
  • Minimal on-call duties, primarily during high-demand installation periods.

9. Compensation and Benefits

  • Competitive salary range: $65,000 - $85,000 per annum, based on experience.
  • Performance-based bonus structure aligned with key operational KPIs.
  • Comprehensive health, dental, and vision insurance packages.
  • Participation in a 401k retirement plan with company contributions.

10. Company Culture and Overview

  • Our organization thrives on a supportive team environment that encourages professional growth and continuous improvement.
  • We value inclusivity, innovation, and a strong work ethic in our pursuit of excellence in the home services industry.
  • Our culture is built on trust, integrity, and a collective commitment to customer satisfaction and quality service.
  • Join our journey to redefine the standard of home improvement services and elevate your career in a dynamic, forward-thinking company.

11. How to Apply

If you meet the above criteria and want to be part of a growth-oriented company focused on customer satisfaction, please send your resume to [INSERT EMAIL HERE] or apply online at [INSERT WEBSITE LINK HERE].

Need help filling this role? HireBus posts the ad, Iris interviews every applicant by phone before you do, and you decide who to hire. Start hiring now

Download as Word file

Fence Company Operations Manager · Word (.docx) · No email needed

Hiring for more than one seat? Get all 21 Fence installation Role Blueprints free, from leadership to the field.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

What a fence operations manager lines up each day

A fence crew can lose a day to an expired locate ticket, a post that can't take a gate yet, or a pile of old pickets with nowhere to go. The operations manager clears those before the truck leaves.

  • South Carolina's locate clock

    South Carolina's 811 law changed on May 22, 2026. Excavation now includes hand digging, along with augering, driving and staking. Notice goes in three to twelve full working days before the start date, not counting the day it's given, and lapses 15 working days after the commencement date in it. A notice covers a quarter mile or five adjoining addresses at most, whichever is less. On builder lots, a fence sub may rely on the builder's notice only if it names the sub. Source: South Carolina Code, Title 58, Chapter 36: Underground facility damage prevention.

  • Posts need time before gates hang

    One maker's data sheet for fast-setting post concrete says it sets in 20 to 40 minutes, but to wait four hours before the post takes any strain and to protect it from freezing for at least 48 hours. It also warns that set times shift in very hot or cold weather. So the schedule sets posts first and hangs heavy gates or stretches chain-link later that day or the next, with extra time in cold weeks. Source: Quikrete: Fast-Setting Concrete Mix (No. 1004) data sheet.

  • The old fence leaves on your truck

    Tear-outs are waste your company creates. Before 2004, according to EPA, wood treated with chromated arsenicals went into home structures such as decks and playsets, so an older fence may contain it. A business disposing of it must decide if the load is hazardous waste, state or local rules may add steps, and EPA says not to burn it at a home. The operations manager books dump runs to sites that take treated wood, and gives crews goggles and dust masks for cutting it. Source: U.S. EPA: Chromated arsenicals (CCA).

  • Load the truck from the job sheet

    A fence job needs dozens of parts: posts, rails, panels or pickets, caps, brackets, gate frames, hinges, latches and bags of concrete. One missing latch means a return trip for the whole crew. The operations manager has the yard check each job against its material list the day before, confirms special-order colors and styles when they land, and holds the start date until every piece is in.

How much fence company operations managers make

The closest BLS group for fence company operations managers is general and operations managers. General and operations managers who work for other specialty trade contractors earned a median of $102,680 a year ($49.36 an hour) in May 2025, according to the Bureau of Labor Statistics. That’s about the same as the $105,770 median for general and operations managers in all industries. About 26,090 of the 3,503,020 general and operations managers in that survey work for other specialty trade contractors.

This template's pay is a base salary, and its bonus rides on the operational KPIs. The BLS median shown runs higher than the template's range because BLS lumps general managers in with operations managers. Tie the bonus to on-time starts and install defects, which this role controls.

Other specialty trade contractors
All industries
10th–90th percentileMiddle halfMedianAnnual pay, May 2025. Source: BLS Occupational Employment and Wage Statistics.
Annual pay by percentile
Group10th25thMedian75th90th
Other specialty trade contractors$51,310$75,710$102,680$147,200$203,280
All industries$50,090$72,320$105,770$167,280$253,390

BLS doesn’t publish pay for fence contractors on their own. These figures cover other specialty trade contractors, which include them. Post a real range for your market in the ad.

The pay line in the template above is an example from our Role Blueprint. Set yours from these figures and what local companies pay.

Skills to hire for, and what you can teach

Hire for these

  • Has kept three or more install crews busy through a spring backlog
  • Can look at a yard sketch and tell how many crew days and bags of concrete it needs
  • Never sends a crew to dig on an expired or missing locate ticket
  • Calls customers about a changed install date the same day it changes
  • Knows which yards are rock, clay or slope before the crew gets there

Teach these on the job

  • How long locate tickets last where you work
  • Set and cure times for the concrete mixes you use
  • Which disposal sites take treated wood
  • Your job sheets and how the yard pulls material
  • Each fence line's parts and hardware

The job lives in the install schedule, the 811 ticket portal, town permit sites and the yard's pull sheets, plus a phone list of suppliers and dump sites. If the yard and its stock also report to this role, say so in the posting.

Fence company operations manager interview questions

Two of the 6 questions we'd ask, and what a strong answer sounds like. Ask every candidate the same questions, and rate each answer on your own before you compare notes.

  1. Situational · Allocating crews

    Tomorrow you have [4] crews, [9] jobs, a vinyl job with a delivery delay and a commercial chain link job that needs a full crew. How do you assign them?

    A strong answer: Matches crew skills to material type, holds the delayed job, protects the commercial commitment and calls affected customers early.

  2. Behavioral · Safety briefings

    Tell me about how you ran daily safety briefings that crews actually paid attention to.

    A strong answer: Short, specific to the day's hazards such as augers or traffic, and crews took part and asked questions.

All 6 questions and the work exercise

Fence company operations manager KPIs

Pull these from the schedule each Friday, with rain-out days counted apart, so a wet April and a planning miss don't blur together.

Crew Efficiency Rate
The template counts on-time completions. Weekly, for each crew: jobs completed on or before the promised day, over all its completed jobs. When a crew misses, check whether the job was sized wrong at scheduling or ran long on site.
Installation Accuracy
Defects found at the final walk or reported in the first weeks, per job: posts out of line or plumb, wrong height, gates that bind, damaged panels. Track them by crew and material.
Customer Satisfaction Rating
Pull out the survey comments about timing and cleanup: the reminder call, arrival time, leftover concrete and whether the old fence left with the crew. Go over them with the crew lead at the next morning meeting.
Scheduling Efficiency
Each week, jobs that started on the customer's scheduled day, over all jobs started. Compare dates set before special-order material arrived with dates set after; if the early ones slip more, stop promising dates that soon.

Career path

  1. Master fence installerLeads a crew and sees how long each type of fence takes to build.
  2. Field supervisorChecks finished fences for every crew before they're signed off.
  3. Operations managerOwns the schedule, tickets and material for every crew.
  4. General managerAdds sales, the office and profit to the field work.

Other roles in a fence installation business

All 21 are in the free Fence installation Role Blueprint Super Bundle, as Word files you can edit.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

Fence company operations manager FAQ

Is there training for fence operations managers?

Yes. The American Fence Association runs an Operations Manager School on running the day-to-day work of a fence or gate business. Its Certified Operations Manager credential asks for at least one year in the fence industry and a 100-question exam, and the school is encouraged but not required. Count the credential in a candidate's favor, then still test them on a real week of your schedule.

How much does a fence company operations manager make?

General and operations managers who work for other specialty trade contractors earned a median of $102,680 a year ($49.36 an hour) in May 2025, according to the Bureau of Labor Statistics. The middle half earned between $75,710 and $147,200 a year. Pay also depends on your local market, experience and bonus terms.

How hands-on is a fence operations manager?

More than the title suggests. The template's 40-pound lifting and long supervision lines mean carrying a gate, a bundle of rails or a bag of concrete when a crew is short, walking long fence lines, and staying on site while a tricky gate goes in. Ship those lines unchanged, put these tasks under them, and name the person who handles accommodation requests.

How many jobs should one fence crew get in a day?

It depends on footage, material, gates and ground. A short wood repair and a long chain-link run might each fill a day. Size each job in crew days when it's sold, check that guess against how long it really took, and leave slack for rocky areas and rainy weeks.

When is a yard too wet for a fence crew?

When holes fill with water or cave in, or when a loaded truck or skid steer would rut the lawn. The crew lead reports from the site, and the final call belongs to the operations manager. Keep a list of ready jobs on gravel, pavement or high ground so a rained-out crew still builds that day.

Sources

Start Hiring Now.

Tell us who you need to hire. Compare plans, then work with HireBus to set up your first role.

Start Hiring Now
They've actually outperformed our previous candidates.Dean Batten, Dean's Window Cleaning

Plan details, setup costs, and advertising spend · See pricing