Lead demolition specialist job description

A lead demolition specialist runs the crew on a demolition company's harder jobs, such as a building that comes down beside its neighbor or a strip-out on an occupied office floor. They check the site and the plan, set the order of work, train technicians, and make sure every load of waste goes where it's allowed.

Median pay, other specialty trade contractors · BLS, May 2025

$36.78 an hour$76,510 a year

Annual pay: 10th percentile $50,700, middle half $60,680 to $96,420, 90th percentile $114,880. Source: BLS Occupational Employment and Wage Statistics, May 2025.

Reports to
Field Supervisor
Department
Operations
Schedule
Weekdays, plus some weekend jobs · On call during critical phases, and weekend work when a building has to come down while it's empty
Also called
Demolition foreman · Lead demolition tech · Demolition crew leader · Working foreman

Lead demolition specialist job description template

This is our Role Blueprint, word for word. Replace the highlighted fields and adjust the example targets and pay to fit your company.

Download as Word file

Demolition - Lead Demolition Specialist

Company Name:
[INSERT COMPANY NAME HERE]
Department:
Operations
Reports to:
[Field Supervisor]
Location:
[INSERT LOCATION HERE]

1. Position Summary

The Lead Demolition Specialist is responsible for overseeing complex demolition projects, applying advanced techniques to ensure safe and efficient execution. This role is pivotal in training demolition crews, managing on-site operations, and ensuring all materials are disposed of following environmental and safety standards, thereby positively impacting overall project outcomes and company reputation.

2. Essential Duties and Responsibilities

  • Lead advanced demolition projects using industry-leading techniques.
  • Train and mentor crew members to maintain high operational standards.
  • Ensure strict adherence to safety protocols and regulatory standards.
  • Oversee the proper disposal of hazardous and non-hazardous materials.

3. Key Tasks / Daily Activities

  • Supervise daily demolition operations and provide technical support as needed.
  • Conduct on-site assessments and adjust project plans for safety and efficiency.
  • Coordinate with vendors and local authorities regarding disposal and environmental permits.
  • Maintain accurate records of project progress, site safety, and crew training.

4. Key Performance Indicators (KPIs)

  • Project Completion Rate: Achieve a 95% on-time project completion target.
  • Safety Compliance: Maintain a 100% adherence rate to all safety and environmental regulations.
  • Crew Training Efficiency: Complete quarterly training sessions for 100% of the crew.
  • Material Disposal Accuracy: Ensure 98% proper disposal compliance for all demolition waste.

5. Required Qualifications and Skills

  • Possess a high school diploma or equivalent; technical certifications in demolition preferred.
  • Minimum of 5 years' experience in demolition or related field with supervisory responsibilities.
  • Strong knowledge of advanced demolition techniques and safety regulations.
  • Excellent communication, leadership, and problem-solving skills.

6. Preferred Experience

  • Prior experience working in residential or commercial demolition projects.
  • Background in managing teams on large-scale demolition or construction sites.
  • Familiarity with modern demolition equipment and sustainable disposal practices.
  • Proven track record of reducing project risks and operational inefficiencies.

7. Physical Requirements

  • Ability to lift and carry up to 50 lbs regularly.
  • Comfort working in varied outdoor environments including hot, cold, and wet conditions.
  • Capability to work in confined spaces and at elevated heights when necessary.
  • Stamina to perform physically demanding tasks throughout long project days.

8. Work Environment and Schedule

  • Typical work schedule is Monday to Friday with potential for weekend projects.
  • Must be available for on-call duties during critical project phases.
  • Frequent on-site work in dynamic and sometimes challenging weather conditions.
  • Occasional travel required between job sites within the region.

9. Compensation and Benefits

  • Salary range: $65,000 - $85,000 per year, commensurate with experience.
  • Eligibility for performance-based bonuses and commission structure.
  • Comprehensive health, dental, and vision insurance plans.
  • 401(k) plan along with additional fringe benefits such as paid time off and professional development support.

10. Company Culture and Overview

  • We foster a culture of continuous learning, safety excellence, and innovation.
  • Our team is dedicated to professional growth and collaborative problem-solving.
  • We value diversity and inclusion, ensuring every member contributes and thrives.
  • Join us to build a career in a supportive, growth-oriented company that champions high-quality results.

11. How to Apply

If you meet the above criteria and want to be part of a growth-oriented company focused on customer satisfaction, please send your resume to [INSERT EMAIL HERE] or apply online at [INSERT WEBSITE LINK HERE].

Need help filling this role? HireBus posts the ad, Iris interviews every applicant by phone before you do, and you decide who to hire. Start hiring now

Download as Word file

Lead Demolition Specialist · Word (.docx) · No email needed

Hiring for more than one seat? Get all 21 Demolition Role Blueprints free, from leadership to the field.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

What makes leading a demolition crew different

A demolition lead makes the calls that keep a half-standing building from falling the wrong way. Much of that work happens before anyone picks up a tool.

  • A survey comes before the first swing

    Before demolition starts, OSHA requires a competent person to survey the building, and any nearby building where workers could be exposed, for the risk of a collapse nobody planned. The company keeps written proof of that survey. Walls or floors in a building hurt by fire, flood or an explosion get shored or braced before anyone works inside. The lead often does this walk or works from it. Source: OSHA: Preparatory operations for demolition (29 CFR 1926.850).

  • The asbestos notice is due even when there's none

    EPA's asbestos rule calls for a thorough inspection before demolition. For a building the rule covers, written notice goes to the agency running the program at least 10 working days before demolition, even when the inspection found no asbestos. Above the rule's asbestos amounts, the notice is due that far ahead of removal or any work that would disturb it. The notice is updated as needed, such as when the amount changes by a fifth or more. Source: eCFR: Asbestos NESHAP standard for demolition and renovation (40 CFR 61.145).

  • Cutting painted steel is a lead job

    OSHA's lead rule covers demolition and salvage where lead is present. Until an exposure assessment shows otherwise, workers cutting, welding or torch burning on lead-painted steel are treated as exposed to more than 50 times OSHA's limit, with the respirators, clothing and change areas that level calls for. The lead plans for this before the torches come out, not after the first beam is down. Source: OSHA: Lead in construction (29 CFR 1926.62).

  • Inspections keep going as the building comes down

    OSHA's mechanical demolition rule calls for a competent person to keep inspecting as the work moves, looking for weakened floors and walls or material that has come loose. No one works where those hazards exist until shoring, bracing or another fix is in. When a crane works a wrecking ball or clamshell bucket, everyone stays out of the area the work could affect. Source: OSHA: Mechanical demolition (29 CFR 1926.859).

  • Lamps, batteries and thermostats come out first

    Before walls come down, some items need their own handling. EPA's universal waste rules cover batteries, mercury-containing equipment such as old thermostats, lamps, pesticides and aerosol cans. EPA says these rules can vary by state, and some states add items to the list. The lead sees these collected and sent to the right handler, and keeps the receipts the client asks for. Source: EPA: Universal waste.

How much lead demolition specialists make

The closest BLS group for lead demolition specialists is First-Line supervisors of construction trades and extraction workers. First-Line supervisors of construction trades and extraction workers who work for other specialty trade contractors earned a median of $36.78 an hour ($76,510 a year) in May 2025, according to the Bureau of Labor Statistics. That’s below the $79,920 median for First-Line supervisors of construction trades and extraction workers in all industries. About 62,160 of the 812,210 First-Line supervisors of construction trades and extraction workers in that survey work for other specialty trade contractors.

Salaried in the template, with bonuses and a commission line. Whether a lead is owed overtime turns on the duties, not the salary: one who cuts and breaks beside the crew most of the shift may not be exempt, so have an employment lawyer review the plan.

Other specialty trade contractors
All industries
10th–90th percentileMiddle halfMedianAnnual pay, May 2025. Source: BLS Occupational Employment and Wage Statistics.
Annual pay by percentile
Group10th25thMedian75th90th
Other specialty trade contractors$50,700$60,680$76,510$96,420$114,880
All industries$53,280$63,400$79,920$101,460$128,260

BLS doesn’t publish pay for demolition contractors on their own. These figures cover other specialty trade contractors, which include them. Post a real range for your market in the ad.

The pay line in the template above is an example from our Role Blueprint. Set yours from these figures and what local companies pay.

Skills to hire for, and what you can teach

Hire for these

  • Five or more years in demolition, with time running a crew
  • Reads a building: bearing walls, load paths and what holds up what
  • Plans the order of work and explains it in a morning talk
  • Holds the crew to the plan when the schedule gets tight
  • Knows when a job needs an engineer, a tester or an abatement crew

Teach these on the job

  • An asbestos supervisor course, if your crews do abatement
  • Your survey forms and daily report
  • Disposal receipts for each waste stream
  • Helping estimators with takeoffs and bids
  • Rigging and signal training for crane picks

Leads work from the asbestos and lead survey, the engineering survey, the site plan and a daily report app. They run the same gear as the crew, from high-reach excavators with shears to torches and demo saws, so say in the ad whether the lead will also estimate jobs or act as the asbestos supervisor.

Lead demolition specialist interview questions

Two of the 6 questions we'd ask, and what a strong answer sounds like. Ask every candidate the same questions, and rate each answer on your own before you compare notes.

  1. Situational · Protecting adjacent property

    Halfway through a house demolition, you see a crack spreading in the neighbor's foundation wall near the property line. What do you do?

    A strong answer: Stops work, documents with photos, tells the project manager, changes methods to cut vibration, and gets an engineer's input before going on.

  2. Behavioral · Training on equipment

    Tell me about how you trained a crew member to run a demolition machine or tool safely.

    A strong answer: Taught in steps, watched them work, and signed them off only when they showed they could do it safely.

All 6 questions and the work exercise

Lead demolition specialist KPIs

A lead's results show up in the crew's jobs. Pull a season of job closeouts and training logs before you adopt the template's numbers.

Project Completion Rate
Jobs the lead ran that finished by the contract date, with a reason on each late one: weather, hidden conditions, permits or crew planning.
Safety Compliance
Site audits, injury and near-miss logs and agency visits on the lead's jobs, plus whether the survey and asbestos notice were done before work began.
Crew Training Efficiency
Training sessions held each quarter, who attended, and sign-offs on machines, torches and asbestos or lead awareness, kept in each crew member's file.
Material Disposal Accuracy
Loads with matching receipts from a landfill, recycler or universal waste handler, checked against the job's waste plan and the client's reporting needs.

Career path

  1. Demolition technicianStrips interiors and breaks concrete on the crew.
  2. Lead demolition specialistPlans the order of work and trains the crew on hard jobs.
  3. Field supervisorOversees several crews and sites at once.
  4. Project managerBids, schedules and manages demolition contracts from start to closeout.

Other roles in a demolition business

All 21 are in the free Demolition Role Blueprint Super Bundle, as Word files you can edit.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

Lead demolition specialist FAQ

Is the lead demolition specialist the competent person?

Often, yes. Under OSHA's definition, the competent person can recognize hazards that exist or can be predicted, and is authorized to correct them promptly. The authority part matters: a lead who can't stop the job or move the crew doesn't meet it. Put that authority in writing and tell the crew who holds it on each site.

How much does a lead demolition specialist make?

First-Line supervisors of construction trades and extraction workers who work for other specialty trade contractors earned a median of $36.78 an hour ($76,510 a year) in May 2025, according to the Bureau of Labor Statistics. The middle half earned between $60,680 and $96,420 a year. Pay also depends on your local market, experience and overtime.

Who files the asbestos notice before demolition?

EPA puts it on the owner or the operator of the demolition, and the notice often goes to a state agency. EPA's overview says homes with four or fewer units are excluded, but houses torn down as part of a commercial or public project, such as a highway or a shopping mall, are covered. Settle in the contract who files it.

Does a lead need asbestos supervisor training?

If your crews do Class I or II asbestos work, the competent person on that job does. OSHA says that person must finish a supervisor course that meets EPA's Model Accreditation Plan, or an equal one. If you send abatement out to another contractor, your lead still needs to know what to look for and when to stop work.

How is a lead different from a field supervisor?

The lead works on one site with the crew all day, often running a machine or a torch. A field supervisor moves between jobs, sets crew assignments, and deals with clients and inspectors. In a smaller company one person may do both, but the template keeps the lead on the hardest work.

How do I test a lead candidate?

Show photos of a two-story building that shares a wall with its neighbor and ask for a plan. Strong leads ask about the shared wall, utilities, asbestos results and where trucks will stand before they talk about machines. Then ask how they trained the last new tech on their crew.

What should a lead's job ad say about the physical side?

The template closes its physical list with stamina for long, demanding days, which is about the worker's body. Swap it for the work: lifting up to 50 pounds, working at heights and in confined spaces when a job calls for it, and long site days in heat, cold and rain. Applicants can then judge the job for themselves.

Sources

Start Hiring Now.

Tell us who you need to hire. Compare plans, then work with HireBus to set up your first role.

Start Hiring Now
HireBus is worth more than what you're going to pay them for your next employee.Patrick Dial

Plan details, setup costs, and advertising spend · See pricing