Basement waterproofing operations manager job description

A basement waterproofing operations manager runs the daily crew schedule: which crew takes which drain, wall or crawl space job, what goes on each truck, and who heads out when pumps fail in a storm. They check finished work and keep jobs inside the crew days that were sold.

Median pay, building finishing contractors · BLS, May 2025

$99,290 a year$47.73 an hour

Annual pay: 10th percentile $47,800, middle half $69,950 to $143,010, 90th percentile $203,160. Source: BLS Occupational Employment and Wage Statistics, May 2025.

Reports to
General Manager
Department
Operations
Schedule
Weekdays, evenings in storm weeks · Weekday hours, plus evening and weekend calls to reshuffle crews and send out pump calls when heavy rain hits
Also called
Install manager · Installation manager · Field operations manager · Ops manager

Basement waterproofing operations manager job description template

This is our Role Blueprint, word for word. Replace the highlighted fields and adjust the example targets and pay to fit your company.

Download as Word file

Basement Waterproofing - Operations Manager

Company Name:
[INSERT COMPANY NAME HERE]
Department:
Operations
Reports to:
[General Manager]
Location:
[INSERT LOCATION HERE]

1. Position Summary

The Operations Manager plays a vital role in our basement waterproofing services, ensuring optimal performance and customer satisfaction. By effectively scheduling crews, organizing materials, and allocating resources, the Operations Manager contributes to the overall growth and success of the company.

2. Essential Duties and Responsibilities

  • Oversee daily operations and ensure work is completed on time and within budget.
  • Schedule crews and allocate resources for jobs.
  • Manage inventory and ensure materials are readily available for work crews.
  • Ensure quality control and customer satisfaction.
  • Handle operational issues and resolve them in a timely manner.

3. Key Tasks / Daily Activities

  • Scheduling and overseeing crews.
  • Organizing materials and resources.
  • Inspecting and approving completed work.
  • Handling customer complaints and resolving them promptly.
  • Ensuring safety standards are adhered to at all times.

4. Key Performance Indicators (KPIs)

  • Crew Utilization Rate: >80%
  • Customer Satisfaction Rating: >4.8 stars
  • Project Completion Rate: 100%
  • Cost Efficiency: Reduce operational costs by 10%

5. Required Qualifications and Skills

  • High School Diploma or equivalent.
  • Minimum 5 years of experience in a similar role.
  • Excellent leadership and organization skills.
  • Strong understanding of basement waterproofing techniques.
  • Excellent communication and customer service skills.

6. Preferred Experience

  • Previous experience in the basement waterproofing industry.
  • Experience with inventory management and resource allocation.
  • Knowledge of safety standards in the construction industry.

7. Physical Requirements

  • Ability to lift up to 50 pounds.
  • Comfortable working in confined spaces.
  • Ability to stand or walk for long periods.

8. Work Environment and Schedule

  • Typical work hours are Monday through Friday, 8 am to 5 pm.
  • Some weekend or evening work may be required during busy periods.

9. Compensation and Benefits

  • Salary range: $60,000 - $80,000 per year.
  • Performance-based bonuses.
  • Health, Dental, and Vision Insurance.
  • 401k retirement plan.

10. Company Culture and Overview

  • We believe in fostering a growth-oriented culture where each individual has the opportunity to excel and contribute to our mission. We value our employees, encouraging their professional development and rewarding their achievements. Our commitment to customer satisfaction is at the heart of everything we do.

11. How to Apply

If you meet the above criteria and want to be part of a growth-oriented company focused on customer satisfaction, please send your resume to [INSERT EMAIL HERE] or apply online at [INSERT WEBSITE LINK HERE].

Need help filling this role? HireBus posts the ad, Iris interviews every applicant by phone before you do, and you decide who to hire. Start hiring now

Download as Word file

Basement Waterproofing Operations Manager · Word (.docx) · No email needed

Hiring for more than one seat? Get all 21 Basement waterproofing Role Blueprints free, from leadership to the field.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

What a waterproofing operations manager handles each day

Every job is a few days of heavy, dusty work in someone's home, and the plan can change overnight when it rains.

  • Storm nights set the morning

    Heavy rain brings calls from customers whose pump stopped or whose power went out. In wet weeks the operations manager keeps a service tech or crew free for those calls, sorts them by how much water is on the floor, and decides which installs slide a day. A flooded finished basement goes ahead of a new drain that can start tomorrow.

  • The truck has to leave complete

    A drain job needs pipe, gravel, a pit, the pump, a check valve, discharge pipe and bags of concrete. A crawl space job needs rolls of liner, tape and often a dehumidifier. One missing part can idle a crew for hours. The operations manager owns the load list for each job type, and plans where broken concrete and dirt go: a dump trailer, a dumpster or a recycler.

  • Sold feet become crew days

    Whether reps price drains by the foot of wall, bracing by the beam or encapsulation by the square foot, the operations manager turns each contract into crew days and books it. A thick slab, a finished wall to remove or a long carry from the driveway adds time, and the schedule should show it before the crew falls behind.

  • Crews built for the work

    A perimeter drain, a wall brace and a crawl space liner call for different skills. Who does which work is the operations manager's call, and slow weeks are for cross-training, so one sick call doesn't stall every crawl space job. In cold months, plan outside digging, such as wall anchors, around frozen ground.

How much basement waterproofing operations managers make

The closest BLS group for basement waterproofing operations managers is general and operations managers. General and operations managers who work for building finishing contractors earned a median of $99,290 a year ($47.73 an hour) in May 2025, according to the Bureau of Labor Statistics. That’s below the $105,770 median for general and operations managers in all industries. About 27,890 of the 3,503,020 general and operations managers in that survey work for building finishing contractors.

Salary with performance bonuses, as the template says. BLS reports general and operations managers together, here at building finishing contractors, the group BLS files waterproofing under, so the median runs above the template's range for this job.

Building finishing contractors
All industries
10th–90th percentileMiddle halfMedianAnnual pay, May 2025. Source: BLS Occupational Employment and Wage Statistics.
Annual pay by percentile
Group10th25thMedian75th90th
Building finishing contractors$47,800$69,950$99,290$143,010$203,160
All industries$50,090$72,320$105,770$167,280$253,390

BLS doesn’t publish pay for waterproofing contractors on their own. These figures cover building finishing contractors, which include them. Post a real range for your market in the ad.

The pay line in the template above is an example from our Role Blueprint. Set yours from these figures and what local companies pay.

Skills to hire for, and what you can teach

Hire for these

  • Has run or scheduled install crews in waterproofing, foundation repair or concrete work
  • Turns a signed contract into crew days and a load list without help
  • Reworks a full schedule after a storm and tells customers early
  • Spots what's wrong with a finished drain, brace or liner
  • Holds crews to the company's dust and safety rules every day

Teach these on the job

  • Your systems, brands and install specs
  • Your scheduling and service ticket screens
  • Disposal and recycling options near you
  • Your rules for warranty visits
  • Upkeep schedules for your trucks, trailers and saws

The schedule and service tickets usually sit in the CRM or a field service app, with a calendar for each crew. Add a material count for the warehouse, truck GPS, and the crew photos that show where each job stands.

Basement waterproofing operations manager interview questions

Two of the 6 questions we'd ask, and what a strong answer sounds like. Ask every candidate the same questions, and rate each answer on your own before you compare notes.

  1. Situational · Pump failure emergencies

    A customer whose system you installed last year calls during a storm: the pump stopped and water is rising. What do you do?

    A strong answer: Walks them through checking power and the float without stepping into water near outlets, dispatches the nearest tech with a spare pump, and starts the warranty process.

  2. Behavioral · Turning complaints into standards

    Tell me about a customer complaint that made you change how every crew starts or finishes a basement job.

    A strong answer: Names the complaint, such as dust through the house or no final walk-through, made it right with that customer, set a standard like a containment checklist or walk-through, and checked it on later jobs.

All 6 questions and the work exercise

Basement waterproofing operations manager KPIs

Go over these weekly with crew leads, and choose targets once a full year of job records is in.

Crew Utilization Rate
Crew hours on jobs against paid crew hours, each week, from time cards. Put loading, driving and dump runs on their own lines, since that's where a schedule loses time.
Customer Satisfaction Rating
Each crew's review and survey scores each month, with comments on dust, cleanup and timing. Phone each unhappy customer by the next working day and note the cause.
Project Completion Rate
The share of the week's jobs finished in the crew days booked. Note whether each slip came from the schedule, a missing part, the homeowner or a storm.
Cost Efficiency
Labor, materials, disposal and fuel per job, by job type, against last year. Look for patterns, such as one crew using more gravel and concrete or overtime climbing after storms.

Career path

  1. Lead installerLeads a crew on the job and sees how installs go wrong.
  2. Field supervisorChecks several crews' work and settles problems on site.
  3. Operations managerRuns the daily schedule, trucks, materials and service calls.
  4. General managerTakes on a market's sales and profit, not only its crews.

Other roles in a basement waterproofing business

All 21 are in the free Basement waterproofing Role Blueprint Super Bundle, as Word files you can edit.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

Basement waterproofing operations manager FAQ

What physical work does a waterproofing operations manager do?

The template's physical lines cover lifting up to 50 pounds, confined spaces and standing or walking for long periods. In practice that means checking a finished crawl space liner, following your confined space rules, carrying a pump or a bag of mix to a short-handed crew, and walking several job sites a day. Edit the lines if the job differs, and offer reasonable accommodation.

How much does a basement waterproofing operations manager make?

General and operations managers who work for building finishing contractors earned a median of $99,290 a year ($47.73 an hour) in May 2025, according to the Bureau of Labor Statistics. The middle half earned between $69,950 and $143,010 a year. Pay also depends on your local market, experience and bonus terms.

What should a waterproofing operations manager check before trucks leave?

The load list for each job, the saw's water feed and the vacuum filters, respirators for everyone cutting, floor protection and dust walls, and a job sheet that shows any change since the sale. Five minutes in the yard saves a crew a two-hour round trip.

How many crews can one operations manager run?

Watch for warning signs instead of picking a number: finished jobs nobody checks, trucks leaving short of parts, and storm calls waiting until the next day. Adding a field supervisor between the manager and the crews is one fix, and it gives a strong lead installer a step up.

What should you ask a waterproofing operations manager in an interview?

Hand them a signed contract and ask how many crew days it needs and what goes on the truck. Then ask about a job type that kept running past its booked days and what they changed. A good answer names a cause, such as thick slabs or long carries, and a new rule for booking that work.

Sources

Start Hiring Now.

Tell us who you need to hire. Compare plans, then work with HireBus to set up your first role.

Start Hiring Now
He had no industry knowledge… he's sold over 300K.Kaylan Barry, Paint Denver

Plan details, setup costs, and advertising spend · See pricing