Deck and patio project manager job description

A deck and patio project manager takes each signed deck, cover or screen room from the sales handoff to the last walk-through. Early on, they settle the details that are hard to change later, like deck height, lighting and the permit path, then order materials and keep homeowners told when crews will be in the yard.

Median pay, other specialty trade contractors · BLS, May 2025

$103,680 a year$49.85 an hour

Annual pay: 10th percentile $63,260, middle half $81,940 to $132,710, 90th percentile $170,780. Source: BLS Occupational Employment and Wage Statistics, May 2025.

Reports to
Production Manager
Department
Operations
Schedule
Weekdays 7 to 4, some peak Saturdays · 7 a.m. to 4 p.m., Monday to Friday, split between backyards and a desk, with some Saturdays in peak season
Also called
Deck project coordinator · Outdoor living project manager · Job manager · Construction project manager

Deck and patio project manager job description template

This is our Role Blueprint, word for word. Replace the highlighted fields and adjust the example targets and pay to fit your company.

Download as Word file

Deck & Patio Builders - Project Manager

Company Name:
[INSERT COMPANY NAME HERE]
Department:
Operations
Reports to:
Production Manager
Location:
[INSERT LOCATION HERE]

1. Position Summary

You'll take each signed deck, patio cover or screen room from design approval to final inspection. You confirm the homeowner's decking, railing and lighting choices, get permits and HOA approval, order long-lead materials, and book footing, framing and final inspections. You're the homeowner's main contact, so they always know when crews will be in their yard.

2. Essential Duties and Responsibilities

  • Hold a handoff with the Sales Representative and homeowner to confirm layout, height, stairs and every selection: decking color, railing style and lighting.
  • Submit permit drawings and HOA applications, and answer plan reviewer questions about footings, ledger attachment and beam spans.
  • Order composite, PVC or wood decking, railing systems and hardware, and track items with long lead times.
  • Book utility locates before footing holes are dug, and schedule footing, framing and final inspections.
  • Hold crews to the decking and railing makers' install guides so the homeowner's product warranty stays valid.
  • Write change orders for added steps, lighting, a bigger footprint, or rot found at the house rim joist when an old deck comes off.
  • Close each job with a walk-through, punch list, care guide and warranty registration.

3. Key Tasks / Daily Activities

  • Check inspection results and material deliveries, and confirm tomorrow's job starts with the Operations Manager.
  • Visit a framing job to check footings, ledger flashing and joist layout before the inspector does.
  • Call homeowners about yard access, pets, gate codes, and when to expect deliveries and noise.
  • Answer plan reviewer and HOA questions.
  • Update job costs and the schedule in [your project management software].

4. Key Performance Indicators (KPIs)

  • Footing, framing and final inspections with no failed items: [your target].
  • Permit approval time after submittal: [your target].
  • Material reorders caused by wrong or short orders: [your target].
  • Homeowner rating at the final walk-through: [your target].
  • Builds finished within the estimated crew days: [your target].

5. Required Qualifications and Skills

  • [2+] years managing residential deck, patio or outdoor living projects, or [4+] years as a lead carpenter in that work.
  • Knows deck framing: footings, ledger attachment and flashing, beams, joists, stairs and guards.
  • Understands residential deck permits and inspections in your area.
  • Can draw or mark up deck plans for permit review.
  • A valid driver's license, since most of the week is spent driving between job sites.

6. Preferred Experience

  • Installer training from the composite or PVC decking and railing brands you sell.
  • Experience with patio covers, pergolas and screen rooms, including roof tie-ins.
  • Experience with deck lighting and low-voltage wiring.
  • Comfort with [your design software].

7. Physical Requirements

  • Walk yards and job sites, climb ladders, and crawl under decks to check framing.
  • Carry decking boards, railing parts and samples up to [50] pounds.
  • With or without reasonable accommodation.

8. Work Environment and Schedule

  • In customers' backyards on most site visits, and at a desk for permits, drawings and orders.
  • Regular hours: [7 a.m. to 4 p.m., Monday through Friday], with some Saturdays in peak season.
  • Outdoor site visits in sun, heat and cold.

9. Compensation and Benefits

  • Pay: [range and hourly or salary basis].
  • Additional pay: [overtime, bonus or incentive terms, or none].
  • Benefits: [health, dental, vision, retirement, paid time off, and when they start].

10. Company Culture and Overview

  • [Two or three sentences on what your company does, the area you serve, and the support a new project manager gets in the first 90 days.]

11. How to Apply

[Apply link or email]. Our process: [phone interview, in-person interview, and next steps]. Contact [hiring contact] if you need an accommodation during the application process.

Need help filling this role? HireBus posts the ad, Iris interviews every applicant by phone before you do, and you decide who to hire. Start hiring now

Download as Word file

Deck and Patio Project Manager · Word (.docx) · No email needed

Hiring for more than one seat? Get all 22 Deck & patio builders Role Blueprints free, from leadership to the field.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

Decisions a deck project manager locks in early

Some choices on a deck can't change once the frame is up: how high it sits, where the wires run, what the town calls it. The project manager settles them at the handoff, before a permit goes in or a board is ordered.

  • The back door sets the deck's height

    The deck surface has to meet the house door. AWC's deck guide, citing the 2015 IRC, says the step from the top of the threshold down to the deck boards can't pass 1 1/2 inches where the door swings out over the deck, or 7 3/4 inches where it doesn't. Ledger height, joist depth and board thickness all stack up to that number. So the project manager checks the door type and threshold at the handoff, against the code the town enforces. Source: American Wood Council: Prescriptive residential wood deck construction guide (DCA 6, based on the 2015 IRC).

  • Wires go in before the boards

    Post cap lights, riser lights and under-rail strips all need wire run through the frame. Trex's 2026 guide says to plan where the lights, power supply, timer and dimmer go, keep them reachable for service, and wire before the decking and railing go on, never between joists and boards. AWC's guide also wants a light at the top of the stairs that lights every step, switched from inside or by motion or timer. Settle the plan with the homeowner at the handoff. Source: Trex: 2026 decking installation guide.

  • Patio cover, or an addition?

    Where a town adopts the IRC's patio cover appendix, covers and screen rooms can be permitted under it. Tazewell County, Illinois, for example, prints the 2018 edition's text in a handout: one story, no taller than 12 feet, built for local snow and wind loads. Below 6 feet 8 inches, the longer wall and one other must be about two-thirds or more open or glazed, using only screen, thin plastic or code-approved glass. It can't become a habitable room, so ask about future heat before the permit goes in. Source: Tazewell County, Illinois (example): Patio covers and porches handout, quoting IRC Appendix AH.

  • Windows that can overheat a deck

    Energy-saving windows can bounce strong sunlight onto a deck. TimberTech's guide warns that light reflected off low-E glass can heat its boards far past normal sun and may melt, warp or discolor them. Near such glass, it calls for added framing, joists 6 to 8 inches apart and screws driven from the top. So at the handoff, note windows on the house, or next door, that face the deck in strong sun, before the frame and fasteners are ordered. Source: TimberTech: Composite decking installation guide (rev. September 2023, linked from its installation help page).

How much deck and patio project managers make

The closest BLS group for deck and patio project managers is construction managers. Construction managers who work for other specialty trade contractors earned a median of $103,680 a year ($49.85 an hour) in May 2025, according to the Bureau of Labor Statistics. That’s below the $114,990 median for construction managers in all industries. About 21,060 of the 380,360 construction managers in that survey work for other specialty trade contractors.

Pay isn't part of this template, so set it from what local deck and remodeling companies offer. BLS counts the role with every construction manager at these contractors, a wider group. A per-build bonus fits on top of a salary, paid when inspections pass on the first visit and builds stay inside their crew days.

Other specialty trade contractors
All industries
10th–90th percentileMiddle halfMedianAnnual pay, May 2025. Source: BLS Occupational Employment and Wage Statistics.
Annual pay by percentile
Group10th25thMedian75th90th
Other specialty trade contractors$63,260$81,940$103,680$132,710$170,780
All industries$69,690$88,550$114,990$151,640$189,440

BLS doesn’t publish pay for deck and patio builders on their own. These figures cover other specialty trade contractors, which include them. Post a real range for your market in the ad.

Skills to hire for, and what you can teach

Hire for these

  • Has run residential deck, porch or outdoor living builds from handoff to final
  • Draws or marks up deck plans a plan reviewer will accept
  • Builds a complete order: boards by length, rails, stairs, lights and hardware
  • Spots a ledger, footing or joist problem on a framing visit before the inspector does
  • Calls homeowners before they have to call the office

Teach these on the job

  • Each town's permit portal and review habits
  • Your board, rail and lighting lines and their lead times
  • Your change order and pricing rules
  • Screen room kits and cover roof tie-ins
  • Your job costing and scheduling software

The week runs through the project management software, each town's permit portal and the drawing program for permit sets, plus texts and calls with homeowners. A laser measure, a level and a flashlight for looking under decks go along on every framing visit.

Deck and patio project manager interview questions

Two of the 6 questions we'd ask, and what a strong answer sounds like. Ask every candidate the same questions, and rate each answer on your own before you compare notes.

  1. Situational · Hidden rot and change orders

    When the old deck comes off, the house rim joist behind the ledger is rotted, and the crew is on site. What do you do?

    A strong answer: Gets photos or visits, shows the homeowner, writes a priced change order and gets it signed, adjusts schedule and inspections, and keeps the crew on other tasks.

  2. Behavioral · Approvals and delays

    Tell me about a permit or HOA approval that got stuck. How did you move it?

    A strong answer: Names the hold-up, such as reviewer questions on ledger details, what they sent and how quickly it moved.

All 6 questions and the work exercise

Deck and patio project manager KPIs

You set every target here. Do it after one building season, since permit times and inspection habits change from town to town.

Footing, framing and final inspections with no failed items
First-visit passes against all inspections booked, by type and by town. Read every correction notice and pass the common ones to the field supervisor.
Permit approval time after submittal
Days from submittal to permit issued, by town. Put days spent waiting on your own answers to reviewer questions on a separate line from the town's time.
Material reorders caused by wrong or short orders
Reorders and extra supplier trips caused by an order that was short, wrong in color or length, or missing parts. Note whether the takeoff or the supplier caused each one.
Homeowner rating at the final walk-through
The score the homeowner gives at the final walk-through, with their comments on updates, care for the yard and punch items, read for each project manager.
Builds finished within the estimated crew days
Builds whose crew days stayed inside the estimate, by month. List days lost to inspections, weather and change orders separately, so the number reflects planning, not luck.

Career path

  1. Lead deck carpenterLearns framing and what inspectors check from the ground up.
  2. Project managerOwns a set of builds, their homeowners, permits and orders.
  3. Production managerSets how every crew builds and tracks what rework costs.
  4. General managerTakes on a market's sales, price book and profit.

Other roles in a deck & patio builders business

All 22 are in the free Deck & patio builders Role Blueprint Super Bundle, as Word files you can edit.

Email me the bundle

We’ll email you the download link, plus occasional hiring tips. Privacy.

Deck and patio project manager FAQ

How many builds can one deck project manager carry?

Count them by stage, not just in total. A build stuck in permit or HOA review needs a few calls a week. A build with a crew in the yard needs site visits and steady updates. In winter, most of the backlog sits in review, so one person can carry more. In peak season, missed homeowner calls and late orders are the sign the load is too heavy.

How much does a deck and patio project manager make?

Construction managers who work for other specialty trade contractors earned a median of $103,680 a year ($49.85 an hour) in May 2025, according to the Bureau of Labor Statistics. The middle half earned between $81,940 and $132,710 a year. Pay also depends on your local market, experience and bonus terms.

What should the care guide at the final walk-through cover?

Hand over the board maker's own care sheet, not a generic one. Trex says soap and water is generally all its decking needs, and recommends 18 to 30 inches of airspace between a grill and its railing. TimberTech caps pressure washing its boards at 1500 psi, with a fan tip. Add your own notes on rails, lights and any wood parts, and show the homeowner where the light timer sits.

Can a lead carpenter step into the deck project manager job?

Often, and the template allows years as a lead in place of years managing projects. A lead already knows footings, ledgers and what inspectors check. What's new is the desk work: drawing permit sets, answering plan reviewers, ordering by length and color, pricing change orders and calling homeowners. Start them with a smaller set of ground-level builds and pair them with an experienced project manager.

How early should a deck project manager order long-lead items?

Ask each distributor for current lead times every spring, since they change with the season. Specialty rails, lighting kits and less common board colors are the usual holdups. Order those once the design is final and the permit path is clear, and tell the homeowner the date before the crew is booked. A build that starts without its rails just ends up waiting at the last step.

Sources

Start Hiring Now.

Tell us who you need to hire. Compare plans, then work with HireBus to set up your first role.

Start Hiring Now
We hired 6 techs in just 2 months.Tyler Witty, CE Powerwashing

Plan details, setup costs, and advertising spend · See pricing